Proposal:H.016580.6
Parish:De Soto
Routes:US 171
Description:US 171: US 84 TO LA 3015
Type Construction:PAVEMENT PATCHING, PLASTIC PAVEMENT STRIPING, AND RELATED WORK.
Estimated Construction Cost:$5,656,252.75
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $3,279,095.64 |
| 2 | 21982 | Forby Contracting, Inc. | $3,598,313.30 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $4,860,421.40 |
| 4 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $8,463,507.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - Forby Contracting, Inc. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - SOUTHERN ROAD & BRIDGE, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 2,822.4 | LNFT | 12.60 | 35,562.24 | 7.00 | 19,756.80 | 11.00 | 31,046.40 | 45.00 | 127,008.00 | | 0002 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 212,794 | LNFT | 2.30 | 489,426.20 | 3.00 | 638,382.00 | 2.20 | 468,146.80 | 3.50 | 744,779.00 | | 0003 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 137,408 | LNFT | 2.30 | 316,038.40 | 3.00 | 412,224.00 | 2.20 | 302,297.60 | 3.50 | 480,928.00 | | 0007 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,600 | LNFT | 36.75 | 58,800.00 | 34.00 | 54,400.00 | 36.00 | 57,600.00 | 200.00 | 320,000.00 | | 0008 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 19.8 | LNFT | 147.00 | 2,910.60 | 180.00 | 3,564.00 | 141.00 | 2,791.80 | 400.00 | 7,920.00 | | 0009 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 84.00 | 2,100.00 | 45.00 | 1,125.00 | 80.00 | 2,000.00 | 400.00 | 10,000.00 | | 0010 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 141.75 | 42,525.00 | 120.00 | 36,000.00 | 135.00 | 40,500.00 | 350.00 | 105,000.00 | | 0011 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,937.50 | 39,375.00 | 3,175.00 | 31,750.00 | 3,750.00 | 37,500.00 | 6,500.00 | 65,000.00 | | 0012 | 707-01-00100 | Concrete Curb | 161 | LNFT | 20.00 | 3,220.00 | 30.00 | 4,830.00 | 26.00 | 4,186.00 | 150.00 | 24,150.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | 420,000.00 | 420,000.00 | 500,000.00 | 500,000.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 212,000.00 | 212,000.00 | 480,000.00 | 480,000.00 | 800,000.00 | 800,000.00 | | 0015 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 141.75 | 1,701.00 | 100.00 | 1,200.00 | 140.00 | 1,680.00 | 200.00 | 2,400.00 | | 0016 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,046 | EACH | 9.45 | 19,334.70 | 9.00 | 18,414.00 | 9.00 | 18,414.00 | 12.00 | 24,552.00 | | 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 29.204 | MILE | 7,350.00 | 214,649.40 | 7,000.00 | 204,428.00 | 4,200.00 | 122,656.80 | 8,000.00 | 233,632.00 | | 0018 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.409 | MILE | 14,700.00 | 6,012.30 | 14,000.00 | 5,726.00 | 18,000.00 | 7,362.00 | 16,000.00 | 6,544.00 | | 0019 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.409 | MILE | 14,700.00 | 6,012.30 | 14,000.00 | 5,726.00 | 10,000.00 | 4,090.00 | 16,000.00 | 6,544.00 | | 0020 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 13.7 | MILE | 13,650.00 | 187,005.00 | 13,000.00 | 178,100.00 | 13,000.00 | 178,100.00 | 16,000.00 | 219,200.00 | | 0021 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 41 | EACH | 525.00 | 21,525.00 | 500.00 | 20,500.00 | 500.00 | 20,500.00 | 650.00 | 26,650.00 | | 0022 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 525.00 | 2,100.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 650.00 | 2,600.00 | | 0023 | 732-05-00100 | Removal of Existing Markings | 13.7 | MILE | 8,925.00 | 122,272.50 | 8,500.00 | 116,450.00 | 6,000.00 | 82,200.00 | 9,500.00 | 130,150.00 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,572.00 | 10,572.00 | 15,000.00 | 15,000.00 | 52,000.00 | 52,000.00 | 150,000.00 | 150,000.00 | | 0025 | 602-05-01240 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (11" Thick) | 1,616 | SQYD | 270.00 | 436,320.00 | 307.50 | 496,920.00 | 550.00 | 888,800.00 | 850.00 | 1,373,600.00 | | 0026 | 602-05-02240 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (11" Thick) | 681 | SQYD | 240.00 | 163,440.00 | 270.00 | 183,870.00 | 500.00 | 340,500.00 | 750.00 | 510,750.00 | | 0027 | 602-05-03240 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (11" Thick) | 3,703 | SQYD | 198.00 | 733,194.00 | 232.50 | 860,947.50 | 350.00 | 1,296,050.00 | 700.00 | 2,592,100.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,279,095.64 | | 3,598,313.30 | | 4,860,421.40 | | 8,463,507.00 |
|