Proposal:H.016572.6
Parish:Terrebonne
Routes:LA 182
Description:LA 182: .47MI N SPORTMANS CT - LA 315
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$7,856,605.95
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $6,136,436.32 |
| 2 | 62139 | Huey P. Stockstill, LLC | $6,577,987.71 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.13 | LUMP | 12,300.00 | 12,300.00 | 25,500.00 | 25,500.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 61 | LNFT | 47.00 | 2,867.00 | 25.00 | 1,525.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 587.5 | LNFT | 12.00 | 7,050.00 | 12.00 | 7,050.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 63 | EACH | 27.00 | 1,701.00 | 27.50 | 1,732.50 | | 0005 | 203-01-00100 | General Excavation | 47 | CUYD | 133.25 | 6,262.75 | 60.00 | 2,820.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,336.5 | CUYD | 49.00 | 65,488.50 | 70.00 | 93,555.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 19,182.5 | TON | 132.75 | 2,546,476.88 | 130.00 | 2,493,725.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,885.9 | TON | 207.25 | 598,102.78 | 255.00 | 735,904.50 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 94,490 | SQYD | 3.10 | 292,919.00 | 2.25 | 212,602.50 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,554 | CUYD | 0.01 | -45.54 | 0.01 | -45.54 | | 0011 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 7,224 | SQYD | 130.00 | 939,120.00 | 145.00 | 1,047,480.00 | | 0012 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 81,915 | LNFT | 1.85 | 151,542.75 | 1.50 | 122,872.50 | | 0013 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 40,958 | LNFT | 1.85 | 75,772.30 | 1.50 | 61,437.00 | | 0014 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 122,873 | LNFT | 0.85 | 104,442.05 | 1.00 | 122,873.00 | | 0015 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 264 | INLF | 1.10 | 290.40 | 3.00 | 792.00 | | 0016 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,795 | LNFT | 3.00 | 5,385.00 | 4.25 | 7,628.75 | | 0017 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,406 | LNFT | 3.00 | 4,218.00 | 4.25 | 5,975.50 | | 0018 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 18.2 | SQYD | 700.00 | 12,740.00 | 700.00 | 12,740.00 | | 0019 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 99 | SQYD | 700.00 | 69,300.00 | 625.00 | 61,875.00 | | 0020 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 250 | LNFT | 54.50 | 13,625.00 | 55.00 | 13,750.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 393.75 | LNFT | 32.75 | 12,895.31 | 32.00 | 12,600.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,800.00 | 3,800.00 | 3,850.00 | 3,850.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,800.00 | 11,400.00 | 3,850.00 | 11,550.00 | | 0024 | 706-03-00700 | Incidental Concrete Paving (10" Thick) | 12.4 | SQYD | 378.00 | 4,687.20 | 500.00 | 6,200.00 | | 0025 | 707-01-00100 | Concrete Curb | 82 | LNFT | 119.00 | 9,758.00 | 75.00 | 6,150.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 475,000.00 | 475,000.00 | 475,000.00 | 475,000.00 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,360 | LNFT | 0.25 | 590.00 | 0.25 | 590.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 802 | LNFT | 0.50 | 401.00 | 0.45 | 360.90 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.012 | MILE | 25.00 | 525.30 | 325.00 | 6,828.90 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.946 | MILE | 765.00 | 4,548.69 | 700.00 | 4,162.20 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 56.574 | MILE | 1,300.00 | 73,546.20 | 1,200.00 | 67,888.80 | | 0032 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 6 | EACH | 27.00 | 162.00 | 25.00 | 150.00 | | 0033 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 27.00 | 162.00 | 25.00 | 150.00 | | 0034 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 27.00 | 162.00 | 25.00 | 150.00 | | 0035 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 27.00 | 162.00 | 25.00 | 150.00 | | 0036 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 4,048 | EACH | 5.50 | 22,264.00 | 5.00 | 20,240.00 | | 0037 | 716-01-00100 | Mulch (Vegetative) | 7.5 | TON | 925.00 | 6,937.50 | 690.00 | 5,175.00 | | 0038 | 717-01-00100 | Seeding | 286 | LB | 33.00 | 9,438.00 | 10.50 | 3,003.00 | | 0039 | 718-01-00100 | Fertilizer | 4,775 | LB | 0.75 | 3,581.25 | 1.00 | 4,775.00 | | 0040 | 724-01-00100 | Rumble Strips (Centerline) | 5.173 | MILE | 1,500.00 | 7,759.50 | 900.00 | 4,655.70 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 235,000.00 | 235,000.00 | 558,000.00 | 558,000.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 109.00 | 872.00 | 110.00 | 880.00 | | 0043 | 729-19-00300 | Dead End Road Installations (Type C) | 11 | EACH | 925.00 | 10,175.00 | 900.00 | 9,900.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,500 | EACH | 5.50 | 13,750.00 | 5.50 | 13,750.00 | | 0045 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,180 | LNFT | 5.50 | 6,490.00 | 5.25 | 6,195.00 | | 0046 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 322.2 | LNFT | 20.75 | 6,685.65 | 20.00 | 6,444.00 | | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 109 | LNFT | 20.75 | 2,261.75 | 20.00 | 2,180.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.858 | MILE | 5,350.00 | 100,890.30 | 5,500.00 | 103,719.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.982 | MILE | 1,300.00 | 2,576.60 | 1,250.00 | 2,477.50 | | 0050 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 490.00 | 980.00 | 525.00 | 1,050.00 | | 0051 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 465.00 | 930.00 | 500.00 | 1,000.00 | | 0052 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 465.00 | 930.00 | 500.00 | 1,000.00 | | 0053 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 708.00 | 1,416.00 | 725.00 | 1,450.00 | | 0054 | 732-05-00100 | Removal of Existing Markings | 0.081 | MILE | 27,250.00 | 2,207.25 | 25,000.00 | 2,025.00 | | 0055 | 735-01-00100 | Mailboxes | 59 | EACH | 54.50 | 3,215.50 | 55.00 | 3,245.00 | | 0056 | 735-02-00100 | Mailbox Supports (Single) | 55 | EACH | 272.50 | 14,987.50 | 160.00 | 8,800.00 | | 0057 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 327.00 | 654.00 | 225.00 | 450.00 | | 0058 | 736-01-00100 | Trenching and Backfilling | 34 | LNFT | 16.00 | 544.00 | 8.50 | 289.00 | | 0059 | 736-09-00100 | Loop Detector | 380 | LNFT | 36.00 | 13,680.00 | 15.00 | 5,700.00 | | 0060 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 3,000.00 | 6,000.00 | 2,050.00 | 4,100.00 | | 0061 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 34 | LNFT | 21.50 | 731.00 | 17.00 | 578.00 | | 0062 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,500.00 | 18,500.00 | 20,000.00 | 20,000.00 | | 0063 | NS-602-00001 | Milling Concrete Pavement | 6,622.2 | SQYD | 12.25 | 81,121.95 | 15.00 | 99,333.00 | | 0064 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) Universal Tau-M (MASH) TL-2 | 1 | EACH | 27,250.00 | 27,250.00 | 30,000.00 | 30,000.00 | | 0065 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) Valtir Quad Guard M10 TL-2 | 1 | EACH | 27,250.00 | 27,250.00 | 30,000.00 | 30,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,136,436.32 | | 6,577,987.71 |
|