Proposal:H.016557.6
Parish:Caddo
Routes:LA 173
Description:LA 173: PINE ST TO HARTMAN ST
Type Construction:PAVEMENT PATCHING, MILLING ASPHALT PAVEMENT, ASPHALT CONCRETE OVERLAY, CONCRETE WALKS AND CURB RAMPS, AND RELATED WORK.
Estimated Construction Cost:$1,601,858.55
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $2,307,198.69 |
| 2 | 17464 | Benton & Brown, LLC. | $2,892,723.77 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 6,341 | LNFT | 10.00 | 63,410.00 | 28.75 | 182,303.75 | | 0002 | 502-01-00100 | Asphalt Concrete | 1,998.9 | TON | 176.75 | 353,305.58 | 200.00 | 399,780.00 | | 0003 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 118.6 | TON | 179.35 | 21,270.91 | 350.00 | 41,510.00 | | 0004 | 509-01-00100 | Milling Asphalt Pavement | 19,285 | SQYD | 8.00 | 154,280.00 | 8.00 | 154,280.00 | | 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -803 | CUYD | 0.10 | -80.30 | 0.01 | -8.03 | | 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,660 | SQYD | 109.50 | 291,270.00 | 185.00 | 492,100.00 | | 0007 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 88,774 | INLF | 2.00 | 177,548.00 | 1.25 | 110,967.50 | | 0008 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 12,795 | LNFT | 3.75 | 47,981.25 | 3.43 | 43,886.85 | | 0009 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 8,195 | LNFT | 3.75 | 30,731.25 | 3.43 | 28,108.85 | | 0010 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 171 | LNFT | 10.00 | 1,710.00 | 4.27 | 730.17 | | 0011 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 209 | LNFT | 10.00 | 2,090.00 | 4.32 | 902.88 | | 0012 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 2 | EACH | 5,000.00 | 10,000.00 | 8,625.00 | 17,250.00 | | 0013 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | | 0014 | 706-01-00100 | Concrete Walk (4" Thick) | 4.4 | SQYD | 500.00 | 2,200.00 | 862.50 | 3,795.00 | | 0015 | 706-04-00110 | Curb Ramps Type 2 | 10.4 | SQYD | 575.00 | 5,980.00 | 862.50 | 8,970.00 | | 0016 | 706-04-00110 | Curb Ramps Type 3 | 16.2 | SQYD | 575.00 | 9,315.00 | 862.50 | 13,972.50 | | 0017 | 706-04-00110 | Curb Ramps Type 4 | 17.9 | SQYD | 575.00 | 10,292.50 | 862.50 | 15,438.75 | | 0018 | 706-04-00110 | Curb Ramps Type 6 | 13.7 | SQYD | 575.00 | 7,877.50 | 862.50 | 11,816.25 | | 0019 | 706-04-00110 | Curb Ramps Type 7 | 252.7 | SQYD | 575.00 | 145,302.50 | 402.50 | 101,711.75 | | 0020 | 706-04-00110 | Curb Ramps Type 8 | 46.5 | SQYD | 575.00 | 26,737.50 | 460.00 | 21,390.00 | | 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 6,341 | LNFT | 100.00 | 634,100.00 | 86.25 | 546,911.25 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 241,000.00 | 241,000.00 | | 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 840 | LNFT | 1.00 | 840.00 | 1.15 | 966.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 912 | LNFT | 1.00 | 912.00 | 1.15 | 1,048.80 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.615 | MILE | 1,000.00 | 1,615.00 | 2,000.00 | 3,230.00 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2 | MILE | 500.00 | 1,000.00 | 575.00 | 1,150.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.69 | MILE | 2,000.00 | 13,380.00 | 2,300.00 | 15,387.00 | | 0028 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 24 | EACH | 50.00 | 1,200.00 | 57.50 | 1,380.00 | | 0029 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 50.00 | 400.00 | 57.50 | 460.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 241,000.00 | 241,000.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 567 | EACH | 10.00 | 5,670.00 | 11.50 | 6,520.50 | | 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 270 | LNFT | 50.00 | 13,500.00 | 57.50 | 15,525.00 | | 0033 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 280 | LNFT | 10.00 | 2,800.00 | 11.50 | 3,220.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 186 | LNFT | 50.00 | 9,300.00 | 57.50 | 10,695.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.345 | MILE | 8,000.00 | 26,760.00 | 9,200.00 | 30,774.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 5,000.00 | 5,000.00 | 5,750.00 | 5,750.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 500.00 | 6,000.00 | 575.00 | 6,900.00 | | 0038 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 700.00 | 2,800.00 | 805.00 | 3,220.00 | | 0039 | 732-05-00100 | Removal of Existing Markings | 0.032 | MILE | 100,000.00 | 3,200.00 | 115,000.00 | 3,680.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0041 | 741-35-00100 | Adjust Valve or Meter Box | 3 | EACH | 5,000.00 | 15,000.00 | 1,000.00 | 3,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,307,198.69 | | 2,892,723.77 |
|