Proposal:H.016527.6
Parish:Vermilion
Routes:LA 14
Description:LA 14: ZWAN ROAD - LA 91
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH (COMPLETE ROAD SYSTEM), AND RELATED WORK.
Estimated Construction Cost:$5,886,649.52
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $5,631,603.53 |
| 2 | 34356 | Prairie Contractors LLC | $6,483,401.88 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 25 | SQYD | 45.50 | 1,137.50 | 100.00 | 2,500.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 535.4 | SQYD | 39.38 | 21,084.05 | 55.00 | 29,447.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Poured Joint Seal | 224 | LNFT | 5.81 | 1,301.44 | 10.00 | 2,240.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 36 | SQYD | 95.82 | 3,449.52 | 100.00 | 3,600.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 714 | LNFT | 9.29 | 6,633.06 | 18.00 | 12,852.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 819 | CUYD | 93.32 | 76,429.08 | 45.00 | 36,855.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,345 | LNFT | 3.28 | 4,411.60 | 3.28 | 4,411.60 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,617 | CUYD | 79.17 | 207,187.89 | 108.00 | 282,636.00 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 52.52 | 10,504.00 | 50.00 | 10,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 23,047.7 | TON | 122.11 | 2,814,354.65 | 136.00 | 3,134,487.20 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 585 | TON | 220.82 | 129,179.70 | 210.00 | 122,850.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 68,475 | SQYD | 2.22 | 152,014.50 | 4.20 | 287,595.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,897 | CUYD | 0.01 | -28.97 | 0.01 | -28.97 | | 0014 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 2,970 | SQYD | 174.40 | 517,968.00 | 200.00 | 594,000.00 | | 0015 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 112 | LNFT | 11.62 | 1,301.44 | 15.00 | 1,680.00 | | 0016 | 602-12-00100 | Undersealing Pavement | 4.5 | TON | 4,646.00 | 20,907.00 | 5,000.00 | 22,500.00 | | 0017 | 602-14-00100 | Holes | 8 | EACH | 580.75 | 4,646.00 | 750.00 | 6,000.00 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 240 | LNFT | 57.50 | 13,800.00 | 120.00 | 28,800.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 362.5 | LNFT | 38.92 | 14,108.50 | 55.00 | 19,937.50 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 175 | LNFT | 137.06 | 23,985.50 | 200.00 | 35,000.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 7 | EACH | 3,600.65 | 25,204.55 | 5,500.00 | 38,500.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 35.6 | SQYD | 92.47 | 3,291.93 | 300.00 | 10,680.00 | | 0023 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 18.7 | SQYD | 342.64 | 6,407.37 | 350.00 | 6,545.00 | | 0024 | 707-04-00100 | Asphalt Concrete Curb | 94.5 | LNFT | 44.64 | 4,218.48 | 200.00 | 18,900.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 272,447.50 | 272,447.50 | 100,000.00 | 100,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 20.092 | MILE | 919.10 | 18,466.56 | 850.00 | 17,078.20 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 20.092 | MILE | 813.05 | 16,335.80 | 850.00 | 17,078.20 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.184 | MILE | 1,045.35 | 42,006.34 | 1,200.00 | 48,220.80 | | 0029 | 724-01-00100 | Rumble Strips (Centerline) | 5.023 | MILE | 1,161.50 | 5,834.21 | 1,400.00 | 7,032.20 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.046 | MILE | 1,161.50 | 11,668.43 | 1,400.00 | 14,064.40 | | 0031 | 724-03-00100 | Rumble Strips (Intersection) | 1 | EACH | 2,903.75 | 2,903.75 | 5,000.00 | 5,000.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 426,961.34 | 426,961.34 | 500,000.00 | 500,000.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 92.92 | 1,115.04 | 135.00 | 1,620.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 110.34 | 882.72 | 185.00 | 1,480.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 663 | EACH | 5.81 | 3,852.03 | 9.00 | 5,967.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.046 | MILE | 5,226.75 | 52,507.93 | 7,500.00 | 75,345.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.023 | MILE | 1,277.65 | 6,417.64 | 4,250.00 | 21,347.75 | | 0038 | 732-05-00100 | Removal of Existing Markings | 0.038 | MILE | 19,164.75 | 728.26 | 7,500.00 | 285.00 | | 0039 | 735-01-00100 | Mailboxes | 28 | EACH | 34.85 | 975.80 | 10.00 | 280.00 | | 0040 | 735-02-00100 | Mailbox Supports (Single) | 28 | EACH | 296.18 | 8,293.04 | 450.00 | 12,600.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 1.23 | ACRE | 3,252.20 | 4,000.21 | 3,500.00 | 4,305.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 81,012.10 | 81,012.10 | 300,000.00 | 300,000.00 | | 0043 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 11.62 | 2,602.88 | 15.00 | 3,360.00 | | 0044 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 67,806 | SQYD | 8.51 | 577,029.06 | 8.50 | 576,351.00 | | 0045 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 32,066.10 | 32,066.10 | 60,000.00 | 60,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,631,603.53 | | 6,483,401.88 |
|