Proposal:H.016291.6
Parish:St. Landry
Routes:LA 10
Description:LA 10: PALMETTO - US 71
Type Construction:REMOVAL OF PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH, REINFORCED CONCRETE BOX CULVERT, AND RELATED WORK.
Estimated Construction Cost:$6,095,576.97
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,335,291.17 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,524,507.80 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $5,621,781.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 10,500.00 | 10,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 214 | SQYD | 51.00 | 10,914.00 | 18.00 | 3,852.00 | 80.00 | 17,120.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 55,123.3 | SQYD | 6.75 | 372,082.28 | 11.00 | 606,356.30 | 5.50 | 303,178.15 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 44 | SQYD | 95.00 | 4,180.00 | 35.00 | 1,540.00 | 100.00 | 4,400.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 650 | CUYD | 15.00 | 9,750.00 | 58.00 | 37,700.00 | 80.00 | 52,000.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 40 | LNFT | 35.00 | 1,400.00 | 11.00 | 440.00 | 120.00 | 4,800.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 150 | LNFT | 15.00 | 2,250.00 | 14.00 | 2,100.00 | 15.00 | 2,250.00 | | 0008 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 59,692 | SQYD | 15.00 | 895,380.00 | 16.00 | 955,072.00 | 13.00 | 775,996.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 200 | SQYD | 70.00 | 14,000.00 | 25.00 | 5,000.00 | 25.00 | 5,000.00 | | 0010 | 304-01-00100 | Lime | 54.6 | TON | 420.00 | 22,932.00 | 300.00 | 16,380.00 | 400.00 | 21,840.00 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 6,933 | SQYD | 4.75 | 32,931.75 | 3.25 | 22,532.25 | 3.00 | 20,799.00 | | 0012 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 6,933 | SQYD | 11.00 | 76,263.00 | 13.50 | 93,595.50 | 16.00 | 110,928.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 995 | CUYD | 44.00 | 43,780.00 | 90.00 | 89,550.00 | 70.00 | 69,650.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 78.4 | CUYD | 50.00 | 3,920.00 | 65.00 | 5,096.00 | 25.00 | 1,960.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 18,719.7 | TON | 128.00 | 2,396,121.60 | 135.00 | 2,527,159.50 | 149.50 | 2,798,595.15 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 297.2 | TON | 80.00 | 23,776.00 | 230.00 | 68,356.00 | 425.00 | 126,310.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 155 | SQYD | 50.00 | 7,750.00 | 15.00 | 2,325.00 | 100.00 | 15,500.00 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -9 | CUYD | 0.01 | -0.09 | 0.00 | 0.00 | 1.00 | -9.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 80 | SQYD | 250.00 | 20,000.00 | 180.00 | 14,400.00 | 300.00 | 24,000.00 | | 0020 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 24 | LNFT | 100.00 | 2,400.00 | 45.00 | 1,080.00 | 300.00 | 7,200.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 34 | LNFT | 100.00 | 3,400.00 | 5.00 | 170.00 | 150.00 | 5,100.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 39 | SQYD | 235.00 | 9,165.00 | 220.00 | 8,580.00 | 180.00 | 7,020.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 180,000.00 | 180,000.00 | 85,000.00 | 85,000.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.667 | MILE | 850.00 | 9,916.95 | 300.00 | 3,500.10 | 200.00 | 2,333.40 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.331 | MILE | 1.00 | 11.33 | 650.00 | 7,365.15 | 650.00 | 7,365.15 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.004 | MILE | 1.00 | 35.00 | 850.00 | 29,753.40 | 850.00 | 29,753.40 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 3.817 | MILE | 1,300.00 | 4,962.10 | 350.00 | 1,335.95 | 1,100.00 | 4,198.70 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.635 | MILE | 1,300.00 | 9,925.50 | 350.00 | 2,672.25 | 1,100.00 | 8,398.50 | | 0030 | 726-01-00100 | Bedding Material | 19.9 | CUYD | 250.00 | 4,975.00 | 195.00 | 3,880.50 | 60.00 | 1,194.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 200,000.00 | 200,000.00 | 450,000.00 | 450,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 125.00 | 2,000.00 | 85.00 | 1,360.00 | 180.00 | 2,880.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 528 | EACH | 7.50 | 3,960.00 | 6.50 | 3,432.00 | 7.00 | 3,696.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 16 | LNFT | 15.00 | 240.00 | 13.00 | 208.00 | 13.00 | 208.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.668 | MILE | 7,000.00 | 81,676.00 | 6,100.00 | 71,174.80 | 5,600.00 | 65,340.80 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.777 | MILE | 3,750.00 | 14,163.75 | 3,300.00 | 12,464.10 | 3,100.00 | 11,708.70 | | 0037 | 739-01-00100 | Hydro-Seeding | 1.89 | ACRE | 3,500.00 | 6,615.00 | 2,700.00 | 5,103.00 | 2,600.00 | 4,914.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | | 0039 | 805-15-00200 | Reinforced Concrete Box Culverts (Precast) (5' x 4') | 68 | LNFT | 2,250.00 | 153,000.00 | 840.00 | 57,120.00 | 1,100.00 | 74,800.00 | | 0040 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 13.04 CY CONCRETE, 1959.2 LBS STEEL | 2 | EACH | 55,000.00 | 110,000.00 | 23,000.00 | 46,000.00 | 35,000.00 | 70,000.00 | | 0041 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 55,122 | SQYD | 7.50 | 413,415.00 | 7.00 | 385,854.00 | 7.00 | 385,854.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,335,291.17 | | 5,524,507.80 | | 5,621,781.95 |
|