Proposal:H.015822.6
Parish:Terrebonne
Routes:LA 56
Description:LA 56: LA 58 - 560' S OF LA 24
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,682,595.55
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $5,034,171.00 |
| 2 | 62139 | Huey P. Stockstill, LLC | $5,658,288.86 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.791 | LUMP | 16,500.00 | 16,500.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 375.2 | LNFT | 10.00 | 3,752.00 | 11.00 | 4,127.20 | | 0003 | 202-02-38200 | Removal of Signs | 43 | EACH | 93.00 | 3,999.00 | 38.00 | 1,634.00 | | 0004 | 203-03-00100 | Embankment | 11 | CUYD | 19.00 | 209.00 | 300.00 | 3,300.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 187 | CUYD | 200.00 | 37,400.00 | 100.00 | 18,700.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 20,337 | TON | 127.00 | 2,582,799.00 | 130.00 | 2,643,810.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,467 | TON | 146.00 | 214,182.00 | 260.00 | 381,420.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 196,315 | SQYD | 2.50 | 490,787.50 | 2.15 | 422,077.25 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10,904 | CUYD | 6.75 | -73,602.00 | 0.01 | -109.04 | | 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 2,462 | SQYD | 166.00 | 408,692.00 | 190.00 | 467,780.00 | | 0011 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 124,000 | LNFT | 1.72 | 213,280.00 | 1.40 | 173,600.00 | | 0012 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 36,600 | LNFT | 1.72 | 62,952.00 | 1.40 | 51,240.00 | | 0013 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 160,600 | LNFT | 0.75 | 120,450.00 | 1.00 | 160,600.00 | | 0014 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 54 | LNFT | 50.00 | 2,700.00 | 80.00 | 4,320.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 75.1 | LNFT | 30.00 | 2,253.00 | 37.00 | 2,778.70 | | 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 100.00 | 5,000.00 | 55.00 | 2,750.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 130.00 | 13,000.00 | | 0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,500.00 | 14,000.00 | 3,500.00 | 14,000.00 | | 0019 | 707-01-00100 | Concrete Curb | 54 | LNFT | 125.00 | 6,750.00 | 170.00 | 9,180.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 361,000.00 | 361,000.00 | 392,000.00 | 392,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,952 | LNFT | 0.25 | 738.00 | 0.25 | 738.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,044 | LNFT | 0.45 | 919.80 | 0.45 | 919.80 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.3 | MILE | 650.00 | 9,945.00 | 250.00 | 3,825.00 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.52 | MILE | 700.00 | 5,964.00 | 725.00 | 6,177.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 51.092 | MILE | 1,100.00 | 56,201.20 | 1,100.00 | 56,201.20 | | 0026 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 35.00 | 280.00 | 35.00 | 280.00 | | 0027 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 35.00 | 140.00 | 35.00 | 140.00 | | 0028 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 35.00 | 140.00 | 35.00 | 140.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 11.1 | TON | 670.00 | 7,437.00 | 675.00 | 7,492.50 | | 0030 | 717-01-00100 | Seeding | 334 | LB | 10.95 | 3,657.30 | 11.00 | 3,674.00 | | 0031 | 718-01-00100 | Fertilizer | 5,565 | LB | 0.98 | 5,453.70 | 1.00 | 5,565.00 | | 0032 | 724-01-00100 | Rumble Strips (Centerline) | 0.256 | MILE | 402.00 | 102.91 | 10,000.00 | 2,560.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 201,216.09 | 201,216.09 | 477,000.00 | 477,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 42 | EACH | 101.00 | 4,242.00 | 95.00 | 3,990.00 | | 0035 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 955.00 | 955.00 | 1,100.00 | 1,100.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,417 | EACH | 5.05 | 12,205.85 | 5.50 | 13,293.50 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 806 | LNFT | 5.00 | 4,030.00 | 5.50 | 4,433.00 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 760 | LNFT | 19.00 | 14,440.00 | 20.00 | 15,200.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 262 | LNFT | 19.00 | 4,978.00 | 20.00 | 5,240.00 | | 0040 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 943 | LNFT | 5.00 | 4,715.00 | 5.75 | 5,422.25 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.546 | MILE | 4,925.00 | 125,814.05 | 5,250.00 | 134,116.50 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.26 | MILE | 1,210.00 | 5,154.60 | 1,300.00 | 5,538.00 | | 0043 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 425.00 | 1,700.00 | 450.00 | 1,800.00 | | 0044 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 425.00 | 850.00 | 450.00 | 900.00 | | 0045 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 650.00 | 2,600.00 | 700.00 | 2,800.00 | | 0046 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 2 | EACH | 1,100.00 | 2,200.00 | 1,200.00 | 2,400.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.027 | MILE | 25,000.00 | 675.00 | 20,000.00 | 540.00 | | 0048 | 735-01-00100 | Mailboxes | 270 | EACH | 101.00 | 27,270.00 | 33.00 | 8,910.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 216 | EACH | 151.00 | 32,616.00 | 285.00 | 61,560.00 | | 0050 | 735-03-00100 | Mailbox Supports (Double) | 27 | EACH | 201.00 | 5,427.00 | 375.00 | 10,125.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,000.00 | 9,000.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,034,171.00 | | 5,658,288.86 |
|