Proposal:H.015785.6
Parish:St. Landry
Routes:LA 755-S
Description:LA 755-S: LA 755 - LA 91
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, REINFORCED PAVING MAT, ASPHALT CONCRETE OVERLAY, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$3,498,701.84
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $3,428,143.87 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $3,810,919.64 |
| 3 | 46716 | BRUDD CONSTRUCTION CO., LLC | $4,313,887.16 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - BRUDD CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.5 | LUMP | 10,897.90 | 10,897.90 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,448.95 | 5,448.95 | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 888.8 | SQYD | 19.63 | 17,447.14 | 12.50 | 11,110.00 | 28.00 | 24,886.40 | | 0004 | 202-02-04501 | Removal of Bridge RECALL NO. 300410, 28.2' X 20' TREATED TIMBER TRESTLE W/ CONCRETE DECK | 1 | LUMP | 17,659.85 | 17,659.85 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 845 | SQYD | 25.73 | 21,741.85 | 13.25 | 11,196.25 | 13.00 | 10,985.00 | | 0006 | 202-02-12020 | Removal of Fence (Chain Link) | 71 | LNFT | 32.96 | 2,340.16 | 20.00 | 1,420.00 | 24.00 | 1,704.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 58 | LNFT | 17.07 | 990.06 | 26.00 | 1,508.00 | 85.00 | 4,930.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 32,037.20 | 32,037.20 | 85,000.00 | 85,000.00 | 50,000.00 | 50,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 58 | EACH | 229.78 | 13,327.24 | 140.00 | 8,120.00 | 165.00 | 9,570.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,578 | LNFT | 2.63 | 4,150.14 | 2.50 | 3,945.00 | 3.00 | 4,734.00 | | 0011 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 978 | SQYD | 37.03 | 36,215.34 | 40.00 | 39,120.00 | 96.00 | 93,888.00 | | 0012 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 5,822 | SQYD | 11.81 | 68,757.82 | 18.50 | 107,707.00 | 80.00 | 465,760.00 | | 0013 | 304-01-00100 | Lime | 48.19 | TON | 369.87 | 17,824.04 | 250.00 | 12,047.50 | 715.00 | 34,455.85 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 3,400 | SQYD | 6.75 | 22,950.00 | 3.00 | 10,200.00 | 35.00 | 119,000.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 385 | CUYD | 80.21 | 30,880.85 | 160.00 | 61,600.00 | 180.00 | 69,300.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,471.3 | CUYD | 45.96 | 67,620.95 | 160.00 | 235,408.00 | 180.00 | 264,834.00 | | 0017 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 71 | SQYD | 131.56 | 9,340.76 | 180.00 | 12,780.00 | 250.00 | 17,750.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 2,813.2 | TON | 167.14 | 470,198.25 | 180.00 | 506,376.00 | 220.00 | 618,904.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 990.8 | TON | 191.38 | 189,619.30 | 238.00 | 235,810.40 | 280.00 | 277,424.00 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 10,908 | SQYD | 10.51 | 114,643.08 | 7.00 | 76,356.00 | 3.00 | 32,724.00 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,004 | CUYD | 0.01 | -10.04 | 0.01 | -10.04 | 0.01 | -10.04 | | 0022 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 123 | SQYD | 186.02 | 22,880.46 | 300.00 | 36,900.00 | 555.00 | 68,265.00 | | 0023 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 480 | INLF | 1.15 | 552.00 | 2.50 | 1,200.00 | 12.00 | 5,760.00 | | 0024 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 4,578 | INLF | 1.15 | 5,264.70 | 1.75 | 8,011.50 | 5.00 | 22,890.00 | | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 88 | LNFT | 119.06 | 10,477.28 | 145.00 | 12,760.00 | 185.00 | 16,280.00 | | 0026 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 40 | LNFT | 205.48 | 8,219.20 | 210.00 | 8,400.00 | 238.00 | 9,520.00 | | 0027 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 150 | LNFT | 185.00 | 27,750.00 | 225.00 | 33,750.00 | 280.00 | 42,000.00 | | 0028 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 114 | LNFT | 206.14 | 23,499.96 | 295.00 | 33,630.00 | 305.00 | 34,770.00 | | 0029 | 701-03-01102 | Storm Drain Pipe (48" RCP/RPVCP) | 66 | LNFT | 277.17 | 18,293.22 | 355.00 | 23,430.00 | 400.00 | 26,400.00 | | 0030 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 102 | LNFT | 199.21 | 20,319.42 | 285.00 | 29,070.00 | 265.00 | 27,030.00 | | 0031 | 701-04-02160 | Storm Drain Pipe Arch (Outfall) (60" Equiv. CMPA) | 10 | LNFT | 663.07 | 6,630.70 | 1,050.00 | 10,500.00 | 820.00 | 8,200.00 | | 0032 | 701-05-01108 | Side Drain Pipe (36" RPVCP) | 24 | LNFT | 165.04 | 3,960.96 | 285.00 | 6,840.00 | 270.00 | 6,480.00 | | 0033 | 701-07-00300 | Yard Drain Pipe (8") | 34 | LNFT | 51.41 | 1,747.94 | 34.00 | 1,156.00 | 75.00 | 2,550.00 | | 0034 | 701-15-00100 | Concrete Collar | 10 | EACH | 1,050.40 | 10,504.00 | 1,575.00 | 15,750.00 | 1,200.00 | 12,000.00 | | 0035 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 778 | LNFT | 0.13 | 101.14 | 125.00 | 97,250.00 | 17.00 | 13,226.00 | | 0036 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 13,538.34 | 13,538.34 | 8,750.00 | 8,750.00 | 5,500.00 | 5,500.00 | | 0037 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,070.30 | 8,140.60 | 6,500.00 | 13,000.00 | 8,200.00 | 16,400.00 | | 0038 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 5,908.50 | 23,634.00 | 2,500.00 | 10,000.00 | 3,200.00 | 12,800.00 | | 0039 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 754.98 | 754.98 | 700.00 | 700.00 | 2,000.00 | 2,000.00 | | 0040 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 71 | LNFT | 48.58 | 3,449.18 | 8.20 | 582.20 | 70.00 | 4,970.00 | | 0041 | 706-02-00200 | Concrete Drive (6" Thick) | 631.3 | SQYD | 99.79 | 62,997.43 | 135.00 | 85,225.50 | 110.00 | 69,443.00 | | 0042 | 710-01-00100 | Flowable Fill | 236 | CUYD | 303.90 | 71,720.40 | 221.00 | 52,156.00 | 335.00 | 79,060.00 | | 0043 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 102.1 | SQYD | 163.86 | 16,730.11 | 170.00 | 17,357.00 | 75.00 | 7,657.50 | | 0044 | 711-04-00100 | Geotextile Fabric | 102 | SQYD | 9.19 | 937.38 | 6.00 | 612.00 | 17.00 | 1,734.00 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 375,146.52 | 375,146.52 | 90,000.00 | 90,000.00 | 65,000.00 | 65,000.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.811 | MILE | 393.90 | 1,107.25 | 1,025.00 | 2,881.28 | 420.00 | 1,180.62 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.961 | MILE | 722.15 | 2,138.29 | 565.00 | 1,672.97 | 665.00 | 1,969.07 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.584 | MILE | 984.75 | 7,468.34 | 770.00 | 5,839.68 | 890.00 | 6,749.76 | | 0049 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 19,695.00 | 19,695.00 | 20,000.00 | 20,000.00 | 6,600.00 | 6,600.00 | | 0050 | 726-01-00100 | Bedding Material | 205.6 | CUYD | 161.50 | 33,204.40 | 195.00 | 40,092.00 | 165.00 | 33,924.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 334,158.50 | 334,158.50 | 380,000.00 | 380,000.00 | 350,000.00 | 350,000.00 | | 0052 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 98.48 | 984.80 | 78.00 | 780.00 | 120.00 | 1,200.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 124.74 | 997.92 | 115.00 | 920.00 | 180.00 | 1,440.00 | | 0054 | 731-02-00100 | Reflectorized Raised Pavement Markers | 142 | EACH | 7.88 | 1,118.96 | 6.25 | 887.50 | 8.00 | 1,136.00 | | 0055 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.528 | MILE | 7,221.50 | 18,255.95 | 5,650.00 | 14,283.20 | 6,600.00 | 16,684.80 | | 0056 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.987 | MILE | 3,939.00 | 3,887.79 | 3,100.00 | 3,059.70 | 3,600.00 | 3,553.20 | | 0057 | 735-01-00100 | Mailboxes | 60 | EACH | 39.39 | 2,363.40 | 35.00 | 2,100.00 | 60.00 | 3,600.00 | | 0058 | 735-02-00100 | Mailbox Supports (Single) | 58 | EACH | 295.43 | 17,134.94 | 230.00 | 13,340.00 | 305.00 | 17,690.00 | | 0059 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 466.12 | 466.12 | 335.00 | 335.00 | 305.00 | 305.00 | | 0060 | 739-01-00100 | Hydro-Seeding | 4.42 | ACRE | 3,676.40 | 16,249.69 | 2,600.00 | 11,492.00 | 3,000.00 | 13,260.00 | | 0061 | 740-01-00100 | Construction Layout | 1 | LUMP | 158,873.00 | 158,873.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | | 0063 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 74 | LNFT | 2,258.62 | 167,137.88 | 3,685.00 | 272,690.00 | 3,200.00 | 236,800.00 | | 0064 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 108 | LNFT | 2,320.73 | 250,638.84 | 4,250.00 | 459,000.00 | 3,800.00 | 410,400.00 | | 0065 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 10' X 7' HEADWALLS: QUANTITY OF STEEL = 2,769.48 POUNDS, QUANTITY OF CONCRETE = 41.142 CUBIC YARDS | 2 | EACH | 66,503.45 | 133,006.90 | 62,000.00 | 124,000.00 | 72,000.00 | 144,000.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 10' X 9' HEADWALLS:
QUANTITY OF STEEL = 23,350 LB, QUANTITY OF CONCRETE = 86.23 CU YD | 2 | EACH | 88,824.45 | 177,648.90 | 135,000.00 | 270,000.00 | 80,000.00 | 160,000.00 | | 0067 | NS-201-00004 | Arborist Services | 2 | EACH | 13,130.00 | 26,260.00 | 2,500.00 | 5,000.00 | 7,000.00 | 14,000.00 | | 0068 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 11,064 | SQYD | 11.21 | 124,027.44 | 5.50 | 60,852.00 | 5.00 | 55,320.00 | | 0069 | NS-502-04210 | Asphalt Tack Coat | 1,660 | GAL | 16.18 | 26,858.80 | 4.50 | 7,470.00 | 5.00 | 8,300.00 | | 0070 | NS-719-00002 | Tree Trimming | 1 | LUMP | 13,130.00 | 13,130.00 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,428,143.87 | | 3,810,919.64 | | 4,313,887.16 |
|