Bid Tabulations for the Letting of 8/12/2026 LA DOTD Headquarters

Proposal:H.015535.6
Parish:East Feliciana
Description:BILLY GOAT ROAD OVER PALMERS BRANCH
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,091,188.75
Rank License BidderConstruction Bid
100044Guinn Construction, LLC$804,059.25
240312GRAY CONSTRUCTION CORP.$858,901.41
312487Diamond B Construction Co., L.L.C.$954,964.15
428190Buck Town Contractors & Co.$992,667.20
548896Command Construction Industries LLC$1,011,111.00
652306SIEMA CONSTRUCTION, LLC$1,058,277.35
700009Coastal Contractors, LLC$1,111,204.00
839462JB JAMES CONSTRUCTION LLC$1,160,674.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Guinn Construction, LLC
- 2 -
GRAY CONSTRUCTION CORP.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
Buck Town Contractors & Co.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP50,000.0050,000.0080,000.0080,000.0065,000.0065,000.0080,000.0080,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP5,000.005,000.0010,000.0010,000.0035,000.0035,000.005,000.005,000.00
0003202-02-04501Removal of Bridge (Sta. 102+18, 20' x 38' Timber Bridge)760     LUMP15,000.0015,000.0053,400.0053,400.0040,000.0040,000.00100,000.00100,000.00
0004202-02-12000Removal of Fence 274     LNFT3.00822.007.001,918.0010.002,740.005.001,370.00
0005203-02-00100Drainage Excavation 143     CUYD25.003,575.0066.009,438.00110.0015,730.0025.003,575.00
0006203-05-00100Excavation and Embankment 1     LUMP20,000.0020,000.0064,000.0064,000.0028,000.0028,000.0025,000.0025,000.00
0007204-05-00100Temporary Sediment Check Dams (Hay) 8     EACH250.002,000.00139.001,112.00250.002,000.0010.0080.00
0008204-06-00100Temporary Silt Fencing 674     LNFT3.002,022.002.972,001.782.001,348.001.00674.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 188     CUYD200.0037,600.00180.5033,934.00200.0037,600.00130.0024,440.00
0010704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 50     LNFT30.001,500.0025.001,250.0034.001,700.0028.001,400.00
0011704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT135.0013,500.00120.0012,000.00120.0012,000.00135.0013,500.00
0012704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH3,000.0012,000.002,500.0010,000.003,500.0014,000.002,800.0011,200.00
0013705-01-00100Barbed Wire Fence 243     LNFT15.003,645.0018.004,374.0025.006,075.0020.004,860.00
0014708-01-00100Right-of-Way Monument 10     EACH800.008,000.00600.006,000.00600.006,000.00420.004,200.00
0015708-02-00100Right-of-Way Monument Witness Post 10     EACH300.003,000.00200.002,000.00200.002,000.00200.002,000.00
0016711-03-00500Riprap (130 lb) 91.7   TON150.0013,755.00160.0014,672.00340.0031,178.00160.0014,672.00
0017711-04-00100Geotextile Fabric 550     SQYD5.002,750.005.002,750.002.751,512.502.001,100.00
0018713-01-00100Temporary Signs and Barricades 1     LUMP20,000.0020,000.0016,000.0016,000.0075,000.0075,000.0012,500.0012,500.00
0019713-11-00100Portable Changeable Message Signs 2     EACH15,000.0030,000.005,300.0010,600.005,200.0010,400.001,000.002,000.00
0020716-01-00100Mulch (Vegetative) 0.44  TON5,000.002,200.003,988.001,754.722,000.00880.004,500.001,980.00
0021717-01-00100Seeding 9     LB50.00450.0027.85250.6525.00225.0050.00450.00
0022718-01-00100Fertilizer 220     LB2.00440.002.28501.601.00220.002.00440.00
0023720-01-01000Erosion Control System (Slope Protection) (Type A) 930     SQYD2.001,860.001.591,478.702.502,325.002.001,860.00
0024720-01-02040Erosion Control System, Flexible (Channel Liner) (Type E) 120     SQYD20.002,400.001.59190.803.00360.0020.002,400.00
0025727-01-00100Mobilization 1     LUMP85,000.0085,000.0085,800.0085,800.0091,500.0091,500.0095,000.0095,000.00
0026729-16-00300Object Marker Assembly (Type 3) 4     EACH200.00800.0025.00100.0085.00340.00110.00440.00
0027740-01-00100Construction Layout 1     LUMP15,000.0015,000.009,000.009,000.0085,000.0085,000.0023,800.0023,800.00
0028804-01-00200Precast Concrete Piles (14") 1,120     LNFT145.00162,400.00112.00125,440.00100.00112,000.00213.00238,560.00
0029805-01-00100Class A1 Concrete (Slab Span) 66.24  CUYD1,750.00115,920.001,971.50130,592.161,650.00109,296.002,200.00145,728.00
0030805-01-00300Class A1 Concrete (Bent Cap) 20.1   CUYD2,400.0048,240.002,870.0057,687.002,750.0055,275.003,100.0062,310.00
0031805-18-00100Concrete Finish (Class 2 Rubbed Finish) 720     SQFT3.002,160.009.006,480.003.552,556.001.00720.00
0032805-18-00200Concrete Finish (Class 3 Special Finish) 720     SQFT3.002,160.002.001,440.003.552,556.001.00720.00
0033806-01-00100Deformed Reinforcing Steel 19,063     LB1.7533,360.252.0038,126.001.5529,547.651.4026,688.20
0034810-01-00100Concrete Bridge Railing (Standard) 80     LNFT300.0024,000.00206.0016,480.00125.0010,000.00250.0020,000.00
0035810-01-00200Concrete Bridge Railing (Slotted) 40     LNFT300.0012,000.00207.508,300.00415.0016,600.00250.0010,000.00
0036813-01-00100Concrete Approach Slabs (Cast-in-Place) 500     SQFT100.0050,000.0077.0038,500.0095.0047,500.00100.0050,000.00
0037815-03-00300Joint Seal (Poured) 100     LNFT15.001,500.0013.301,330.0015.001,500.0040.004,000.00
             
  CONTRACTOR TOTAL   804,059.25 858,901.41 954,964.15 992,667.20



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Command Construction Industries LLC
- 6 -
SIEMA CONSTRUCTION, LLC
- 7 -
Coastal Contractors, LLC
- 8 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP100,000.00100,000.00100,000.00100,000.00155,000.00155,000.00100,000.00100,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP25,000.0025,000.001,200.001,200.009,500.009,500.006,000.006,000.00
0003202-02-04501Removal of Bridge (Sta. 102+18, 20' x 38' Timber Bridge)760     LUMP100,000.00100,000.009,800.009,800.0086,000.0086,000.00200,000.00200,000.00
0004202-02-12000Removal of Fence 274     LNFT3.00822.004.001,096.005.001,370.004.001,096.00
0005203-02-00100Drainage Excavation 143     CUYD100.0014,300.0055.007,865.0048.006,864.0032.004,576.00
0006203-05-00100Excavation and Embankment 1     LUMP14,433.0014,433.0055,000.0055,000.0042,000.0042,000.0050,000.0050,000.00
0007204-05-00100Temporary Sediment Check Dams (Hay) 8     EACH150.001,200.00270.002,160.00181.001,448.00140.001,120.00
0008204-06-00100Temporary Silt Fencing 674     LNFT5.003,370.003.002,022.004.002,696.008.005,392.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 188     CUYD180.0033,840.0081.5015,322.00172.0032,336.00140.0026,320.00
0010704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 50     LNFT30.001,500.0040.002,000.0028.001,400.0025.001,250.00
0011704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT150.0015,000.00143.0014,300.00100.0010,000.00120.0012,000.00
0012704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH3,000.0012,000.004,000.0016,000.002,750.0011,000.002,500.0010,000.00
0013705-01-00100Barbed Wire Fence 243     LNFT15.003,645.0020.004,860.0020.004,860.0018.004,374.00
0014708-01-00100Right-of-Way Monument 10     EACH600.006,000.00460.004,600.00700.007,000.00600.006,000.00
0015708-02-00100Right-of-Way Monument Witness Post 10     EACH200.002,000.00460.004,600.00225.002,250.00200.002,000.00
0016711-03-00500Riprap (130 lb) 91.7   TON250.0022,925.00100.009,170.00265.0024,300.50400.0036,680.00
0017711-04-00100Geotextile Fabric 550     SQYD5.002,750.004.502,475.006.003,300.004.002,200.00
0018713-01-00100Temporary Signs and Barricades 1     LUMP25,000.0025,000.0050,000.0050,000.0020,000.0020,000.0050,000.0050,000.00
0019713-11-00100Portable Changeable Message Signs 2     EACH1,000.002,000.001,020.002,040.004,500.009,000.008,000.0016,000.00
0020716-01-00100Mulch (Vegetative) 0.44  TON4,000.001,760.004,565.002,008.604,500.001,980.004,000.001,760.00
0021717-01-00100Seeding 9     LB50.00450.0032.00288.0030.00270.0028.00252.00
0022718-01-00100Fertilizer 220     LB5.001,100.002.50550.002.50550.002.30506.00
0023720-01-01000Erosion Control System (Slope Protection) (Type A) 930     SQYD1.00930.002.852,650.502.001,860.001.601,488.00
0024720-01-02040Erosion Control System, Flexible (Channel Liner) (Type E) 120     SQYD1.00120.002.50300.002.00240.001.60192.00
0025727-01-00100Mobilization 1     LUMP125,000.00125,000.00105,000.00105,000.00110,000.00110,000.00110,000.00110,000.00
0026729-16-00300Object Marker Assembly (Type 3) 4     EACH50.00200.001,020.004,080.0030.00120.0025.00100.00
0027740-01-00100Construction Layout 1     LUMP50,000.0050,000.0025,000.0025,000.0020,000.0020,000.0030,000.0030,000.00
0028804-01-00200Precast Concrete Piles (14") 1,120     LNFT100.00112,000.00280.00313,600.00139.00155,680.00170.00190,400.00
0029805-01-00100Class A1 Concrete (Slab Span) 66.24  CUYD2,000.00132,480.001,700.00112,608.003,000.00198,720.001,600.00105,984.00
0030805-01-00300Class A1 Concrete (Bent Cap) 20.1   CUYD4,000.0080,400.003,700.0074,370.003,250.0065,325.002,700.0054,270.00
0031805-18-00100Concrete Finish (Class 2 Rubbed Finish) 720     SQFT4.002,880.003.252,340.003.002,160.003.002,160.00
0032805-18-00200Concrete Finish (Class 3 Special Finish) 720     SQFT4.002,880.005.854,212.004.002,880.003.002,160.00
0033806-01-00100Deformed Reinforcing Steel 19,063     LB2.0038,126.001.7533,360.251.5028,594.501.5028,594.50
0034810-01-00100Concrete Bridge Railing (Standard) 80     LNFT300.0024,000.00300.0024,000.00275.0022,000.00300.0024,000.00
0035810-01-00200Concrete Bridge Railing (Slotted) 40     LNFT300.0012,000.00300.0012,000.00275.0011,000.00165.006,600.00
0036813-01-00100Concrete Approach Slabs (Cast-in-Place) 500     SQFT75.0037,500.0073.0036,500.00110.0055,000.00130.0065,000.00
0037815-03-00300Joint Seal (Poured) 100     LNFT35.003,500.009.00900.0045.004,500.0022.002,200.00
             
  CONTRACTOR TOTAL   1,011,111.00 1,058,277.35 1,111,204.00 1,160,674.50