Proposal:H.015535.6
Parish:East Feliciana
Description:BILLY GOAT ROAD OVER PALMERS BRANCH
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,091,188.75
| Rank | License | Bidder | Construction Bid |
| 1 | 00044 | Guinn Construction, LLC | $804,059.25 |
| 2 | 40312 | GRAY CONSTRUCTION CORP. | $858,901.41 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $954,964.15 |
| 4 | 28190 | Buck Town Contractors & Co. | $992,667.20 |
| 5 | 48896 | Command Construction Industries LLC | $1,011,111.00 |
| 6 | 52306 | SIEMA CONSTRUCTION, LLC | $1,058,277.35 |
| 7 | 00009 | Coastal Contractors, LLC | $1,111,204.00 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $1,160,674.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Guinn Construction, LLC | - 2 - GRAY CONSTRUCTION CORP. | - 3 - Diamond B Construction Co., L.L.C. | - 4 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | 65,000.00 | 65,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-04501 | Removal of Bridge (Sta. 102+18, 20' x 38' Timber Bridge) | 760 | LUMP | 15,000.00 | 15,000.00 | 53,400.00 | 53,400.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0004 | 202-02-12000 | Removal of Fence | 274 | LNFT | 3.00 | 822.00 | 7.00 | 1,918.00 | 10.00 | 2,740.00 | 5.00 | 1,370.00 | | 0005 | 203-02-00100 | Drainage Excavation | 143 | CUYD | 25.00 | 3,575.00 | 66.00 | 9,438.00 | 110.00 | 15,730.00 | 25.00 | 3,575.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 64,000.00 | 64,000.00 | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 250.00 | 2,000.00 | 139.00 | 1,112.00 | 250.00 | 2,000.00 | 10.00 | 80.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 674 | LNFT | 3.00 | 2,022.00 | 2.97 | 2,001.78 | 2.00 | 1,348.00 | 1.00 | 674.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 188 | CUYD | 200.00 | 37,600.00 | 180.50 | 33,934.00 | 200.00 | 37,600.00 | 130.00 | 24,440.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 30.00 | 1,500.00 | 25.00 | 1,250.00 | 34.00 | 1,700.00 | 28.00 | 1,400.00 | | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.00 | 13,500.00 | 120.00 | 12,000.00 | 120.00 | 12,000.00 | 135.00 | 13,500.00 | | 0012 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,000.00 | 12,000.00 | 2,500.00 | 10,000.00 | 3,500.00 | 14,000.00 | 2,800.00 | 11,200.00 | | 0013 | 705-01-00100 | Barbed Wire Fence | 243 | LNFT | 15.00 | 3,645.00 | 18.00 | 4,374.00 | 25.00 | 6,075.00 | 20.00 | 4,860.00 | | 0014 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 800.00 | 8,000.00 | 600.00 | 6,000.00 | 600.00 | 6,000.00 | 420.00 | 4,200.00 | | 0015 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 300.00 | 3,000.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | | 0016 | 711-03-00500 | Riprap (130 lb) | 91.7 | TON | 150.00 | 13,755.00 | 160.00 | 14,672.00 | 340.00 | 31,178.00 | 160.00 | 14,672.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 550 | SQYD | 5.00 | 2,750.00 | 5.00 | 2,750.00 | 2.75 | 1,512.50 | 2.00 | 1,100.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 | 75,000.00 | 75,000.00 | 12,500.00 | 12,500.00 | | 0019 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 15,000.00 | 30,000.00 | 5,300.00 | 10,600.00 | 5,200.00 | 10,400.00 | 1,000.00 | 2,000.00 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 0.44 | TON | 5,000.00 | 2,200.00 | 3,988.00 | 1,754.72 | 2,000.00 | 880.00 | 4,500.00 | 1,980.00 | | 0021 | 717-01-00100 | Seeding | 9 | LB | 50.00 | 450.00 | 27.85 | 250.65 | 25.00 | 225.00 | 50.00 | 450.00 | | 0022 | 718-01-00100 | Fertilizer | 220 | LB | 2.00 | 440.00 | 2.28 | 501.60 | 1.00 | 220.00 | 2.00 | 440.00 | | 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 930 | SQYD | 2.00 | 1,860.00 | 1.59 | 1,478.70 | 2.50 | 2,325.00 | 2.00 | 1,860.00 | | 0024 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 120 | SQYD | 20.00 | 2,400.00 | 1.59 | 190.80 | 3.00 | 360.00 | 20.00 | 2,400.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 85,000.00 | 85,000.00 | 85,800.00 | 85,800.00 | 91,500.00 | 91,500.00 | 95,000.00 | 95,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 200.00 | 800.00 | 25.00 | 100.00 | 85.00 | 340.00 | 110.00 | 440.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 9,000.00 | 9,000.00 | 85,000.00 | 85,000.00 | 23,800.00 | 23,800.00 | | 0028 | 804-01-00200 | Precast Concrete Piles (14") | 1,120 | LNFT | 145.00 | 162,400.00 | 112.00 | 125,440.00 | 100.00 | 112,000.00 | 213.00 | 238,560.00 | | 0029 | 805-01-00100 | Class A1 Concrete (Slab Span) | 66.24 | CUYD | 1,750.00 | 115,920.00 | 1,971.50 | 130,592.16 | 1,650.00 | 109,296.00 | 2,200.00 | 145,728.00 | | 0030 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 20.1 | CUYD | 2,400.00 | 48,240.00 | 2,870.00 | 57,687.00 | 2,750.00 | 55,275.00 | 3,100.00 | 62,310.00 | | 0031 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 720 | SQFT | 3.00 | 2,160.00 | 9.00 | 6,480.00 | 3.55 | 2,556.00 | 1.00 | 720.00 | | 0032 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 720 | SQFT | 3.00 | 2,160.00 | 2.00 | 1,440.00 | 3.55 | 2,556.00 | 1.00 | 720.00 | | 0033 | 806-01-00100 | Deformed Reinforcing Steel | 19,063 | LB | 1.75 | 33,360.25 | 2.00 | 38,126.00 | 1.55 | 29,547.65 | 1.40 | 26,688.20 | | 0034 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 300.00 | 24,000.00 | 206.00 | 16,480.00 | 125.00 | 10,000.00 | 250.00 | 20,000.00 | | 0035 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 40 | LNFT | 300.00 | 12,000.00 | 207.50 | 8,300.00 | 415.00 | 16,600.00 | 250.00 | 10,000.00 | | 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 100.00 | 50,000.00 | 77.00 | 38,500.00 | 95.00 | 47,500.00 | 100.00 | 50,000.00 | | 0037 | 815-03-00300 | Joint Seal (Poured) | 100 | LNFT | 15.00 | 1,500.00 | 13.30 | 1,330.00 | 15.00 | 1,500.00 | 40.00 | 4,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 804,059.25 | | 858,901.41 | | 954,964.15 | | 992,667.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Command Construction Industries LLC | - 6 - SIEMA CONSTRUCTION, LLC | - 7 - Coastal Contractors, LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 155,000.00 | 155,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 1,200.00 | 1,200.00 | 9,500.00 | 9,500.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-04501 | Removal of Bridge (Sta. 102+18, 20' x 38' Timber Bridge) | 760 | LUMP | 100,000.00 | 100,000.00 | 9,800.00 | 9,800.00 | 86,000.00 | 86,000.00 | 200,000.00 | 200,000.00 | | 0004 | 202-02-12000 | Removal of Fence | 274 | LNFT | 3.00 | 822.00 | 4.00 | 1,096.00 | 5.00 | 1,370.00 | 4.00 | 1,096.00 | | 0005 | 203-02-00100 | Drainage Excavation | 143 | CUYD | 100.00 | 14,300.00 | 55.00 | 7,865.00 | 48.00 | 6,864.00 | 32.00 | 4,576.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 14,433.00 | 14,433.00 | 55,000.00 | 55,000.00 | 42,000.00 | 42,000.00 | 50,000.00 | 50,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 150.00 | 1,200.00 | 270.00 | 2,160.00 | 181.00 | 1,448.00 | 140.00 | 1,120.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 674 | LNFT | 5.00 | 3,370.00 | 3.00 | 2,022.00 | 4.00 | 2,696.00 | 8.00 | 5,392.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 188 | CUYD | 180.00 | 33,840.00 | 81.50 | 15,322.00 | 172.00 | 32,336.00 | 140.00 | 26,320.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 30.00 | 1,500.00 | 40.00 | 2,000.00 | 28.00 | 1,400.00 | 25.00 | 1,250.00 | | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 150.00 | 15,000.00 | 143.00 | 14,300.00 | 100.00 | 10,000.00 | 120.00 | 12,000.00 | | 0012 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,000.00 | 12,000.00 | 4,000.00 | 16,000.00 | 2,750.00 | 11,000.00 | 2,500.00 | 10,000.00 | | 0013 | 705-01-00100 | Barbed Wire Fence | 243 | LNFT | 15.00 | 3,645.00 | 20.00 | 4,860.00 | 20.00 | 4,860.00 | 18.00 | 4,374.00 | | 0014 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 600.00 | 6,000.00 | 460.00 | 4,600.00 | 700.00 | 7,000.00 | 600.00 | 6,000.00 | | 0015 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 200.00 | 2,000.00 | 460.00 | 4,600.00 | 225.00 | 2,250.00 | 200.00 | 2,000.00 | | 0016 | 711-03-00500 | Riprap (130 lb) | 91.7 | TON | 250.00 | 22,925.00 | 100.00 | 9,170.00 | 265.00 | 24,300.50 | 400.00 | 36,680.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 550 | SQYD | 5.00 | 2,750.00 | 4.50 | 2,475.00 | 6.00 | 3,300.00 | 4.00 | 2,200.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0019 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 1,000.00 | 2,000.00 | 1,020.00 | 2,040.00 | 4,500.00 | 9,000.00 | 8,000.00 | 16,000.00 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 0.44 | TON | 4,000.00 | 1,760.00 | 4,565.00 | 2,008.60 | 4,500.00 | 1,980.00 | 4,000.00 | 1,760.00 | | 0021 | 717-01-00100 | Seeding | 9 | LB | 50.00 | 450.00 | 32.00 | 288.00 | 30.00 | 270.00 | 28.00 | 252.00 | | 0022 | 718-01-00100 | Fertilizer | 220 | LB | 5.00 | 1,100.00 | 2.50 | 550.00 | 2.50 | 550.00 | 2.30 | 506.00 | | 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 930 | SQYD | 1.00 | 930.00 | 2.85 | 2,650.50 | 2.00 | 1,860.00 | 1.60 | 1,488.00 | | 0024 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 120 | SQYD | 1.00 | 120.00 | 2.50 | 300.00 | 2.00 | 240.00 | 1.60 | 192.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 105,000.00 | 105,000.00 | 110,000.00 | 110,000.00 | 110,000.00 | 110,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 50.00 | 200.00 | 1,020.00 | 4,080.00 | 30.00 | 120.00 | 25.00 | 100.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | | 0028 | 804-01-00200 | Precast Concrete Piles (14") | 1,120 | LNFT | 100.00 | 112,000.00 | 280.00 | 313,600.00 | 139.00 | 155,680.00 | 170.00 | 190,400.00 | | 0029 | 805-01-00100 | Class A1 Concrete (Slab Span) | 66.24 | CUYD | 2,000.00 | 132,480.00 | 1,700.00 | 112,608.00 | 3,000.00 | 198,720.00 | 1,600.00 | 105,984.00 | | 0030 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 20.1 | CUYD | 4,000.00 | 80,400.00 | 3,700.00 | 74,370.00 | 3,250.00 | 65,325.00 | 2,700.00 | 54,270.00 | | 0031 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 720 | SQFT | 4.00 | 2,880.00 | 3.25 | 2,340.00 | 3.00 | 2,160.00 | 3.00 | 2,160.00 | | 0032 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 720 | SQFT | 4.00 | 2,880.00 | 5.85 | 4,212.00 | 4.00 | 2,880.00 | 3.00 | 2,160.00 | | 0033 | 806-01-00100 | Deformed Reinforcing Steel | 19,063 | LB | 2.00 | 38,126.00 | 1.75 | 33,360.25 | 1.50 | 28,594.50 | 1.50 | 28,594.50 | | 0034 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 300.00 | 24,000.00 | 300.00 | 24,000.00 | 275.00 | 22,000.00 | 300.00 | 24,000.00 | | 0035 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 40 | LNFT | 300.00 | 12,000.00 | 300.00 | 12,000.00 | 275.00 | 11,000.00 | 165.00 | 6,600.00 | | 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 75.00 | 37,500.00 | 73.00 | 36,500.00 | 110.00 | 55,000.00 | 130.00 | 65,000.00 | | 0037 | 815-03-00300 | Joint Seal (Poured) | 100 | LNFT | 35.00 | 3,500.00 | 9.00 | 900.00 | 45.00 | 4,500.00 | 22.00 | 2,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,011,111.00 | | 1,058,277.35 | | 1,111,204.00 | | 1,160,674.50 |
|