Proposal:H.015463.6
Parish:Union
Description:WHITE OAK LANE OVER EDMONDS CREEK
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$784,285.55
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $576,557.65 |
| 2 | 46716 | BRUDD CONSTRUCTION CO., LLC | $611,147.02 |
| 3 | 64116 | Descant's Excavating & Construction Services, LLC | $680,601.40 |
| 4 | 14788 | Louisiana Bridge, Inc. | $720,020.30 |
| 5 | 49239 | WL Bass Construction Inc. | $746,289.30 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $1,073,161.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - BRUDD CONSTRUCTION CO., LLC | - 3 - Descant's Excavating & Construction Services, LLC | - 4 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 30,000.00 | 30,000.00 | 16,300.00 | 16,300.00 | 75,000.00 | 75,000.00 | 45,000.00 | 45,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 6,530.00 | 6,530.00 | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 755.5 | SQYD | 12.00 | 9,066.00 | 4.11 | 3,105.11 | 15.00 | 11,332.50 | 25.00 | 18,887.50 | | 0004 | 202-02-12000 | Removal of Fence | 189 | LNFT | 3.00 | 567.00 | 3.11 | 587.79 | 1.00 | 189.00 | 6.00 | 1,134.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (54" Equiv. CMPA) | 192 | LNFT | 34.00 | 6,528.00 | 34.00 | 6,528.00 | 25.00 | 4,800.00 | 48.00 | 9,216.00 | | 0006 | 203-02-00100 | Drainage Excavation | 222 | CUYD | 40.00 | 8,880.00 | 32.00 | 7,104.00 | 40.00 | 8,880.00 | 47.00 | 10,434.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 65,000.00 | 65,000.00 | 21,337.00 | 21,337.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | | 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 2,800.00 | 2,800.00 | 547.00 | 547.00 | 500.00 | 500.00 | 2,100.00 | 2,100.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 710 | LNFT | 5.50 | 3,905.00 | 2.36 | 1,675.60 | 3.50 | 2,485.00 | 6.00 | 4,260.00 | | 0010 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 867.1 | SQYD | 38.00 | 32,949.80 | 57.22 | 49,615.46 | 60.00 | 52,026.00 | 67.00 | 58,095.70 | | 0011 | 302-03-00100 | Base Drain Outlet | 3 | EACH | 1,150.00 | 3,450.00 | 1,044.60 | 3,133.80 | 500.00 | 1,500.00 | 1,600.00 | 4,800.00 | | 0012 | 304-01-00100 | Lime | 12.3 | TON | 360.00 | 4,428.00 | 708.00 | 8,708.40 | 712.00 | 8,757.60 | 511.00 | 6,285.30 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 867.1 | SQYD | 8.50 | 7,370.35 | 24.00 | 20,810.40 | 13.00 | 11,272.30 | 17.00 | 14,740.70 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 39 | CUYD | 125.00 | 4,875.00 | 254.00 | 9,906.00 | 60.00 | 2,340.00 | 197.00 | 7,683.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 125.00 | 6,250.00 | 175.00 | 8,750.00 | 60.00 | 3,000.00 | 149.00 | 7,450.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 143.3 | TON | 225.00 | 32,242.50 | 443.00 | 63,481.90 | 250.00 | 35,825.00 | 225.00 | 32,242.50 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 35.8 | TON | 225.00 | 8,055.00 | 650.00 | 23,270.00 | 265.00 | 9,487.00 | 245.00 | 8,771.00 | | 0018 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 602 | INLF | 1.50 | 903.00 | 2.55 | 1,535.10 | 1.00 | 602.00 | 4.00 | 2,408.00 | | 0019 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 356 | LNFT | 450.00 | 160,200.00 | 462.00 | 164,472.00 | 630.00 | 224,280.00 | 540.00 | 192,240.00 | | 0020 | 701-05-01081 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CMP) | 38 | LNFT | 160.00 | 6,080.00 | 253.00 | 9,614.00 | 300.00 | 11,400.00 | 165.00 | 6,270.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 90 | LNFT | 1.00 | 90.00 | 40.00 | 3,600.00 | 50.00 | 4,500.00 | 1.00 | 90.00 | | 0022 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 15,000.00 | 15,000.00 | 9,285.00 | 9,285.00 | 8,500.00 | 8,500.00 | 9,500.00 | 9,500.00 | | 0023 | 705-01-00100 | Barbed Wire Fence | 136 | LNFT | 45.00 | 6,120.00 | 20.00 | 2,720.00 | 15.00 | 2,040.00 | 40.00 | 5,440.00 | | 0024 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 50 | LNFT | 55.00 | 2,750.00 | 30.00 | 1,500.00 | 20.00 | 1,000.00 | 46.00 | 2,300.00 | | 0025 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 625.00 | 8,125.00 | 708.00 | 9,204.00 | 600.00 | 7,800.00 | 600.00 | 7,800.00 | | 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 225.00 | 2,925.00 | 236.00 | 3,068.00 | 200.00 | 2,600.00 | 300.00 | 3,900.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 320 | SQYD | 105.00 | 33,600.00 | 84.00 | 26,880.00 | 125.00 | 40,000.00 | 100.00 | 32,000.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 320 | SQYD | 2.40 | 768.00 | 3.00 | 960.00 | 6.50 | 2,080.00 | 5.00 | 1,600.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,500.00 | 16,500.00 | 21,305.00 | 21,305.00 | 15,000.00 | 15,000.00 | 23,000.00 | 23,000.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 1.1 | TON | 4,500.00 | 4,950.00 | 1,003.00 | 1,103.30 | 125.00 | 137.50 | 4,600.00 | 5,060.00 | | 0031 | 717-01-00100 | Seeding | 17 | LB | 30.00 | 510.00 | 36.00 | 612.00 | 10.00 | 170.00 | 35.00 | 595.00 | | 0032 | 718-01-00100 | Fertilizer | 550 | LB | 2.00 | 1,100.00 | 1.18 | 649.00 | 1.25 | 687.50 | 3.00 | 1,650.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 314 | SQYD | 4.00 | 1,256.00 | 3.54 | 1,111.56 | 1.00 | 314.00 | 5.00 | 1,570.00 | | 0034 | 726-01-00100 | Bedding Material | 278.8 | CUYD | 155.00 | 43,214.00 | 162.00 | 45,165.60 | 170.00 | 47,396.00 | 152.00 | 42,377.60 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 51,000.00 | 51,000.00 | 40,000.00 | 40,000.00 | 91,000.00 | 91,000.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | 118.00 | 472.00 | 200.00 | 800.00 | 155.00 | 620.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 5,500.00 | 5,500.00 | 12,900.00 | 12,900.00 | 32,000.00 | 32,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 576,557.65 | | 611,147.02 | | 680,601.40 | | 720,020.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | - 6 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 500.00 | 500.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 755.5 | SQYD | 2.00 | 1,511.00 | 10.00 | 7,555.00 | | 0004 | 202-02-12000 | Removal of Fence | 189 | LNFT | 3.00 | 567.00 | 6.15 | 1,162.35 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (54" Equiv. CMPA) | 192 | LNFT | 75.00 | 14,400.00 | 100.00 | 19,200.00 | | 0006 | 203-02-00100 | Drainage Excavation | 222 | CUYD | 20.00 | 4,440.00 | 40.00 | 8,880.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 37,000.00 | 37,000.00 | 60,000.00 | 60,000.00 | | 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 400.00 | 400.00 | 4,000.00 | 4,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 710 | LNFT | 3.00 | 2,130.00 | 5.00 | 3,550.00 | | 0010 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 867.1 | SQYD | 60.00 | 52,026.00 | 50.00 | 43,355.00 | | 0011 | 302-03-00100 | Base Drain Outlet | 3 | EACH | 1,500.00 | 4,500.00 | 1,500.00 | 4,500.00 | | 0012 | 304-01-00100 | Lime | 12.3 | TON | 325.00 | 3,997.50 | 300.00 | 3,690.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 867.1 | SQYD | 8.00 | 6,936.80 | 8.00 | 6,936.80 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 39 | CUYD | 140.00 | 5,460.00 | 150.00 | 5,850.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 130.00 | 6,500.00 | 160.00 | 8,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 143.3 | TON | 300.00 | 42,990.00 | 375.00 | 53,737.50 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 35.8 | TON | 300.00 | 10,740.00 | 550.00 | 19,690.00 | | 0018 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 602 | INLF | 1.00 | 602.00 | 1.00 | 602.00 | | 0019 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 356 | LNFT | 700.00 | 249,200.00 | 1,100.00 | 391,600.00 | | 0020 | 701-05-01081 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CMP) | 38 | LNFT | 135.00 | 5,130.00 | 250.00 | 9,500.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 90 | LNFT | 120.00 | 10,800.00 | 1.00 | 90.00 | | 0022 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 15,000.00 | 15,000.00 | 24,000.00 | 24,000.00 | | 0023 | 705-01-00100 | Barbed Wire Fence | 136 | LNFT | 17.00 | 2,312.00 | 17.00 | 2,312.00 | | 0024 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 50 | LNFT | 25.00 | 1,250.00 | 25.00 | 1,250.00 | | 0025 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 600.00 | 7,800.00 | 600.00 | 7,800.00 | | 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 200.00 | 2,600.00 | 200.00 | 2,600.00 | | 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 320 | SQYD | 100.00 | 32,000.00 | 120.00 | 38,400.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 320 | SQYD | 5.00 | 1,600.00 | 4.00 | 1,280.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 1.1 | TON | 850.00 | 935.00 | 850.00 | 935.00 | | 0031 | 717-01-00100 | Seeding | 17 | LB | 30.00 | 510.00 | 30.00 | 510.00 | | 0032 | 718-01-00100 | Fertilizer | 550 | LB | 1.00 | 550.00 | 1.00 | 550.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 314 | SQYD | 3.00 | 942.00 | 3.00 | 942.00 | | 0034 | 726-01-00100 | Bedding Material | 278.8 | CUYD | 200.00 | 55,760.00 | 180.00 | 50,184.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 74,600.00 | 74,600.00 | 100,000.00 | 100,000.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | 125.00 | 500.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 746,289.30 | | 1,073,161.65 |
|