Proposal:H.015458.6
Parish:Morehouse
Description:OSCAR LUM ROAD OVER WILLIAMSON CREEK
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,579,281.55
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $1,246,997.42 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,406,413.19 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $1,633,302.70 |
| 4 | 00044 | Guinn Construction, LLC | $1,668,077.00 |
| 5 | 49239 | WL Bass Construction Inc. | $1,693,375.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 24,000.00 | 24,000.00 | 35,000.00 | 35,000.00 | 160,000.00 | 160,000.00 | 40,000.00 | 40,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 21,000.00 | 21,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,094 | SQYD | 10.00 | 10,940.00 | 8.50 | 9,299.00 | 8.00 | 8,752.00 | 20.00 | 21,880.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 105+86, Recall No. 400698, 11' x 30' Timber Concrete) | 330 | LUMP | 16,000.00 | 16,000.00 | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 20,000.00 | 20,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 840 | CUYD | 21.00 | 17,640.00 | 15.00 | 12,600.00 | 25.00 | 21,000.00 | 25.00 | 21,000.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 48,000.00 | 48,000.00 | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 230.00 | 1,840.00 | 175.00 | 1,400.00 | 175.00 | 1,400.00 | 250.00 | 2,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,307 | LNFT | 5.00 | 6,535.00 | 2.00 | 2,614.00 | 6.00 | 7,842.00 | 4.00 | 5,228.00 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,531.5 | SQYD | 64.00 | 98,016.00 | 120.00 | 183,780.00 | 50.00 | 76,575.00 | 75.00 | 114,862.50 | | 0010 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 1,100.00 | 8,800.00 | 1,600.00 | 12,800.00 | 2,000.00 | 16,000.00 | 2,500.00 | 20,000.00 | | 0011 | 304-01-00100 | Lime | 21.72 | TON | 1.00 | 21.72 | 405.00 | 8,796.60 | 400.00 | 8,688.00 | 1,000.00 | 21,720.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 1,532 | SQYD | 1.00 | 1,532.00 | 6.25 | 9,575.00 | 6.00 | 9,192.00 | 18.00 | 27,576.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 35 | CUYD | 265.00 | 9,275.00 | 210.00 | 7,350.00 | 150.00 | 5,250.00 | 250.00 | 8,750.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 315.1 | TON | 225.00 | 70,897.50 | 180.00 | 56,718.00 | 300.00 | 94,530.00 | 350.00 | 110,285.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 92.8 | TON | 245.00 | 22,736.00 | 290.00 | 26,912.00 | 400.00 | 37,120.00 | 400.00 | 37,120.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 42 | INLF | 10.00 | 420.00 | 40.00 | 1,680.00 | 0.65 | 27.30 | 35.00 | 1,470.00 | | 0017 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 160 | LNFT | 109.00 | 17,440.00 | 75.00 | 12,000.00 | 140.00 | 22,400.00 | 115.00 | 18,400.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 40.00 | 4,000.00 | 36.00 | 3,600.00 | 10.00 | 1,000.00 | 40.00 | 4,000.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 155.00 | 7,750.00 | 136.00 | 6,800.00 | 250.00 | 12,500.00 | 145.00 | 7,250.00 | | 0020 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 4,300.00 | 17,200.00 | 3,750.00 | 15,000.00 | 3,000.00 | 12,000.00 | 4,250.00 | 17,000.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 600.00 | 8,400.00 | 600.00 | 8,400.00 | 600.00 | 8,400.00 | 800.00 | 11,200.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 250.00 | 3,500.00 | 200.00 | 2,800.00 | 200.00 | 2,800.00 | 400.00 | 5,600.00 | | 0023 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 177 | SQYD | 99.00 | 17,523.00 | 145.00 | 25,665.00 | 110.00 | 19,470.00 | 150.00 | 26,550.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 177 | SQYD | 4.00 | 708.00 | 2.25 | 398.25 | 6.00 | 1,062.00 | 5.00 | 885.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0026 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 3,500.00 | 7,000.00 | 900.00 | 1,800.00 | 900.00 | 1,800.00 | 4,000.00 | 8,000.00 | | 0027 | 717-01-00100 | Seeding | 30 | LB | 34.00 | 1,020.00 | 35.00 | 1,050.00 | 35.00 | 1,050.00 | 50.00 | 1,500.00 | | 0028 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.50 | 1,500.00 | 1.00 | 1,000.00 | 1.00 | 1,000.00 | 2.00 | 2,000.00 | | 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 654 | SQYD | 4.00 | 2,616.00 | 3.50 | 2,289.00 | 3.50 | 2,289.00 | 3.00 | 1,962.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 138,000.00 | 138,000.00 | 140,000.00 | 140,000.00 | 160,000.00 | 160,000.00 | 175,000.00 | 175,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 155.00 | 620.00 | 135.00 | 540.00 | 150.00 | 600.00 | 200.00 | 800.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 21,000.00 | 21,000.00 | 70,000.00 | 70,000.00 | 27,000.00 | 27,000.00 | 20,000.00 | 20,000.00 | | 0033 | 804-01-00300 | Precast Concrete Piles (16") | 1,440 | LNFT | 156.00 | 224,640.00 | 145.00 | 208,800.00 | 190.00 | 273,600.00 | 160.00 | 230,400.00 | | 0034 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 1,750.00 | 178,360.00 | 1,318.25 | 134,356.04 | 1,500.00 | 152,880.00 | 2,800.00 | 285,376.00 | | 0035 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.14 | CUYD | 2,600.00 | 70,564.00 | 2,800.00 | 75,992.00 | 3,000.00 | 81,420.00 | 3,250.00 | 88,205.00 | | 0036 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 969 | SQFT | 4.00 | 3,876.00 | 3.25 | 3,149.25 | 1.50 | 1,453.50 | 3.00 | 2,907.00 | | 0037 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 969 | SQFT | 4.00 | 3,876.00 | 3.75 | 3,633.75 | 2.50 | 2,422.50 | 3.00 | 2,907.00 | | 0038 | 806-01-00100 | Deformed Reinforcing Steel | 27,282 | LB | 1.60 | 43,651.20 | 1.65 | 45,015.30 | 1.70 | 46,379.40 | 1.75 | 47,743.50 | | 0039 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 230.00 | 18,400.00 | 215.00 | 17,200.00 | 250.00 | 20,000.00 | 300.00 | 24,000.00 | | 0040 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 230.00 | 18,400.00 | 265.00 | 21,200.00 | 120.00 | 9,600.00 | 300.00 | 24,000.00 | | 0041 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 580 | SQFT | 130.00 | 75,400.00 | 90.00 | 52,200.00 | 130.00 | 75,400.00 | 125.00 | 72,500.00 | | 0042 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 20.00 | 2,400.00 | 75.00 | 9,000.00 | 20.00 | 2,400.00 | 25.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,246,997.42 | | 1,406,413.19 | | 1,633,302.70 | | 1,668,077.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - WL Bass Construction Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 102,000.00 | 102,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 250.00 | 250.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,094 | SQYD | 2.00 | 2,188.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 105+86, Recall No. 400698, 11' x 30' Timber Concrete) | 330 | LUMP | 75,000.00 | 75,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 840 | CUYD | 15.00 | 12,600.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 300.00 | 2,400.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,307 | LNFT | 4.00 | 5,228.00 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 1,531.5 | SQYD | 60.00 | 91,890.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 8 | EACH | 2,000.00 | 16,000.00 | | 0011 | 304-01-00100 | Lime | 21.72 | TON | 320.00 | 6,950.40 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 1,532 | SQYD | 8.00 | 12,256.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 35 | CUYD | 180.00 | 6,300.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 315.1 | TON | 300.00 | 94,530.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 92.8 | TON | 300.00 | 27,840.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 42 | INLF | 1.00 | 42.00 | | 0017 | 701-05-02045 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW) | 160 | LNFT | 125.00 | 20,000.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 100 | LNFT | 10.00 | 1,000.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 250.00 | 12,500.00 | | 0020 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 3,000.00 | 12,000.00 | | 0021 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 600.00 | 8,400.00 | | 0022 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 200.00 | 2,800.00 | | 0023 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 177 | SQYD | 130.00 | 23,010.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 177 | SQYD | 4.00 | 708.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | | 0026 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,200.00 | 2,400.00 | | 0027 | 717-01-00100 | Seeding | 30 | LB | 20.00 | 600.00 | | 0028 | 718-01-00100 | Fertilizer | 1,000 | LB | 2.00 | 2,000.00 | | 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 654 | SQYD | 2.00 | 1,308.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 169,000.00 | 169,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | | 0033 | 804-01-00300 | Precast Concrete Piles (16") | 1,440 | LNFT | 275.00 | 396,000.00 | | 0034 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 350.00 | 35,672.00 | | 0035 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.14 | CUYD | 350.00 | 9,499.00 | | 0036 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 969 | SQFT | 2.00 | 1,938.00 | | 0037 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 969 | SQFT | 2.00 | 1,938.00 | | 0038 | 806-01-00100 | Deformed Reinforcing Steel | 27,282 | LB | 4.00 | 109,128.00 | | 0039 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 250.00 | 20,000.00 | | 0040 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 300.00 | 24,000.00 | | 0041 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 580 | SQFT | 270.00 | 156,600.00 | | 0042 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 15.00 | 1,800.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,693,375.40 |
|