Proposal:H.014803.6
Parish:St. Helena
Routes:LA 16
Description:LA 16: LA 63 TO LM 9.852
Type Construction:BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CULVERT REHABILITATION, AND RELATED WORK.
Estimated Construction Cost:$6,533,801.40
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $4,109,860.99 |
| 2 | 73475 | Madden Gulf Coast, LLC | $4,323,988.02 |
| 3 | 12031 | R.J. Daigle & Sons Contractors, Inc | $4,403,952.40 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $5,043,952.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - R.J. Daigle & Sons Contractors, Inc | - 4 - Barber Bros. Contracting Co., L.L.C | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 2,500.00 | 2,500.00 | 66,000.00 | 66,000.00 | 3,000.00 | 3,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 505.8 | SQYD | 9.40 | 4,754.52 | 20.00 | 10,116.00 | 4.55 | 2,301.39 | 20.00 | 10,116.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 588 | LNFT | 8.50 | 4,998.00 | 10.00 | 5,880.00 | 9.00 | 5,292.00 | 12.00 | 7,056.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 65.00 | 260.00 | 40.00 | 160.00 | 70.00 | 280.00 | 40.00 | 160.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,318 | CUYD | 10.00 | 13,180.00 | 87.00 | 114,666.00 | 11.75 | 15,486.50 | 45.00 | 59,310.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 1,400 | LNFT | 5.00 | 7,000.00 | 8.50 | 11,900.00 | 12.00 | 16,800.00 | 9.00 | 12,600.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 28 | EACH | 159.00 | 4,452.00 | 175.00 | 4,900.00 | 175.00 | 4,900.00 | 160.00 | 4,480.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,100 | LNFT | 3.00 | 3,300.00 | 2.25 | 2,475.00 | 3.25 | 3,575.00 | 3.50 | 3,850.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 21,480.5 | TON | 110.00 | 2,362,855.00 | 94.00 | 2,019,167.00 | 103.10 | 2,214,639.55 | 115.00 | 2,470,257.50 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 737.4 | TON | 175.00 | 129,045.00 | 185.00 | 136,419.00 | 103.10 | 76,025.94 | 210.00 | 154,854.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 97,822 | SQYD | 1.15 | 112,495.30 | 2.25 | 220,099.50 | 1.85 | 180,970.70 | 4.00 | 391,288.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,608 | CUYD | 0.01 | -46.08 | 0.01 | -46.08 | 0.01 | -46.08 | 0.00 | 0.00 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 360 | SQYD | 105.00 | 37,800.00 | 142.00 | 51,120.00 | 116.25 | 41,850.00 | 140.00 | 50,400.00 | | 0014 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 445 | SQYD | 120.00 | 53,400.00 | 165.00 | 73,425.00 | 135.50 | 60,297.50 | 160.00 | 71,200.00 | | 0015 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 720 | INLF | 1.00 | 720.00 | 2.00 | 1,440.00 | 1.15 | 828.00 | 1.00 | 720.00 | | 0016 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 416 | LNFT | 270.00 | 112,320.00 | 221.00 | 91,936.00 | 350.00 | 145,600.00 | 235.00 | 97,760.00 | | 0017 | 701-01-01081 | Cross Drain Pipe (48" RCP) | 472 | LNFT | 290.00 | 136,880.00 | 246.00 | 116,112.00 | 470.00 | 221,840.00 | 260.00 | 122,720.00 | | 0018 | 701-01-01100 | Cross Drain Pipe (54" RCP) | 100 | LNFT | 480.00 | 48,000.00 | 304.00 | 30,400.00 | 620.00 | 62,000.00 | 325.00 | 32,500.00 | | 0019 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 272 | LNFT | 540.00 | 146,880.00 | 332.00 | 90,304.00 | 500.00 | 136,000.00 | 355.00 | 96,560.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 580 | LNFT | 1.00 | 580.00 | 20.00 | 11,600.00 | 19.00 | 11,020.00 | 3.00 | 1,740.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 125 | LNFT | 33.50 | 4,187.50 | 25.00 | 3,125.00 | 35.00 | 4,375.00 | 28.00 | 3,500.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 120.00 | 12,000.00 | 85.00 | 8,500.00 | 130.00 | 13,000.00 | 90.00 | 9,000.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,400.00 | 13,600.00 | 3,500.00 | 14,000.00 | 3,550.00 | 14,200.00 | 3,700.00 | 14,800.00 | | 0024 | 707-04-00100 | Asphalt Concrete Curb | 54 | LNFT | 92.50 | 4,995.00 | 200.00 | 10,800.00 | 126.00 | 6,804.00 | 70.00 | 3,780.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 131,000.00 | 131,000.00 | 148,000.00 | 148,000.00 | 160,000.00 | 160,000.00 | 115,000.00 | 115,000.00 | | 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 840 | LNFT | 1.00 | 840.00 | 0.50 | 420.00 | 0.55 | 462.00 | 0.50 | 420.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.228 | MILE | 100.00 | 1,122.80 | 450.00 | 5,052.60 | 450.00 | 5,052.60 | 300.00 | 3,368.40 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.076 | MILE | 605.00 | 4,885.98 | 600.00 | 4,845.60 | 680.00 | 5,491.68 | 600.00 | 4,845.60 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 32.487 | MILE | 805.00 | 26,152.04 | 800.00 | 25,989.60 | 900.00 | 29,238.30 | 800.00 | 25,989.60 | | 0030 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 4,900.00 | 9,800.00 | 4,500.00 | 9,000.00 | 5,750.00 | 11,500.00 | 3,000.00 | 6,000.00 | | 0031 | 724-01-00100 | Rumble Strips (Centerline) | 3.743 | MILE | 300.00 | 1,122.90 | 1,000.00 | 3,743.00 | 340.00 | 1,272.62 | 350.00 | 1,310.05 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.485 | MILE | 300.00 | 2,245.50 | 1,000.00 | 7,485.00 | 340.00 | 2,544.90 | 350.00 | 2,619.75 | | 0033 | 726-01-00100 | Bedding Material | 172.4 | CUYD | 1.00 | 172.40 | 121.50 | 20,946.60 | 185.00 | 31,894.00 | 130.00 | 22,412.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 161,000.00 | 161,000.00 | 232,000.00 | 232,000.00 | 245,000.00 | 245,000.00 | 350,000.00 | 350,000.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 76.00 | 1,672.00 | 75.00 | 1,650.00 | 85.00 | 1,870.00 | 80.00 | 1,760.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 100.00 | 400.00 | 90.00 | 360.00 | 110.00 | 440.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 728 | EACH | 5.00 | 3,640.00 | 5.00 | 3,640.00 | 5.25 | 3,822.00 | 5.30 | 3,858.40 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 280 | LNFT | 14.50 | 4,060.00 | 14.50 | 4,060.00 | 16.00 | 4,480.00 | 16.00 | 4,480.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.829 | MILE | 4,400.00 | 47,647.60 | 4,400.00 | 47,647.60 | 4,900.00 | 53,062.10 | 4,600.00 | 49,813.40 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.692 | MILE | 1,115.00 | 3,001.58 | 1,100.00 | 2,961.20 | 1,200.00 | 3,230.40 | 1,200.00 | 3,230.40 | | 0041 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.147 | MILE | 6,050.00 | 889.35 | 6,000.00 | 882.00 | 6,900.00 | 1,014.30 | 6,100.00 | 896.70 | | 0042 | 735-01-00100 | Mailboxes | 46 | EACH | 35.00 | 1,610.00 | 50.00 | 2,300.00 | 34.00 | 1,564.00 | 55.00 | 2,530.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 46 | EACH | 260.00 | 11,960.00 | 250.00 | 11,500.00 | 290.00 | 13,340.00 | 260.00 | 11,960.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 10.988 | ACRE | 2,700.00 | 29,667.60 | 2,800.00 | 30,766.40 | 3,000.00 | 32,964.00 | 2,800.00 | 30,766.40 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,200.00 | 4,200.00 | 15,000.00 | 15,000.00 | 18,500.00 | 18,500.00 | 30,000.00 | 30,000.00 | | 0046 | NS-701-00020 | Culvert Rehabilitation by Spray Applied Lining (60" CMP) | 400 | LNFT | 584.00 | 233,600.00 | 880.00 | 352,000.00 | 660.00 | 264,000.00 | 900.00 | 360,000.00 | | 0047 | NS-701-00020 | Culvert Rehabilitation by Spray Applied Lining (84" CMP) | 279 | LNFT | 665.00 | 185,535.00 | 1,300.00 | 362,700.00 | 750.00 | 209,250.00 | 1,400.00 | 390,600.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,109,860.99 | | 4,323,988.02 | | 4,403,952.40 | | 5,043,952.20 |
|