Proposal:H.014801.6
Parish:Tangipahoa
Routes:LA 443
Description:LA 443: US 190 - ROBERT RD
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,592,047.34
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $2,741,226.67 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,889,354.77 |
| 3 | 73475 | Madden Gulf Coast, LLC | $2,908,527.47 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $3,557,233.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Madden Gulf Coast, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.6 | LUMP | 14,000.00 | 14,000.00 | 9,200.00 | 9,200.00 | 18,000.00 | 18,000.00 | 15,000.00 | 15,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 9,200.00 | 9,200.00 | 6,950.00 | 6,950.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 143.7 | SQYD | 50.00 | 7,185.00 | 59.00 | 8,478.30 | 51.00 | 7,328.70 | 30.00 | 4,311.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 352 | SQYD | 25.00 | 8,800.00 | 66.50 | 23,408.00 | 25.00 | 8,800.00 | 30.00 | 10,560.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 447 | LNFT | 11.00 | 4,917.00 | 10.50 | 4,693.50 | 10.00 | 4,470.00 | 15.00 | 6,705.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 22 | EACH | 22.00 | 484.00 | 36.00 | 792.00 | 35.00 | 770.00 | 40.00 | 880.00 | | 0007 | 203-01-00100 | General Excavation | 39 | CUYD | 80.00 | 3,120.00 | 66.50 | 2,593.50 | 100.00 | 3,900.00 | 150.00 | 5,850.00 | | 0008 | 203-03-00100 | Embankment | 12 | CUYD | 30.00 | 360.00 | 77.00 | 924.00 | 200.00 | 2,400.00 | 175.00 | 2,100.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 872 | CUYD | 76.00 | 66,272.00 | 63.00 | 54,936.00 | 95.00 | 82,840.00 | 30.00 | 26,160.00 | | 0010 | 203-10-00100 | Cleaning Existing Ditches | 1,600 | LNFT | 16.50 | 26,400.00 | 7.50 | 12,000.00 | 15.00 | 24,000.00 | 15.00 | 24,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 75 | EACH | 165.00 | 12,375.00 | 150.00 | 11,250.00 | 145.00 | 10,875.00 | 175.00 | 13,125.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 35,355 | LNFT | 1.00 | 35,355.00 | 1.00 | 35,355.00 | 1.80 | 63,639.00 | 2.50 | 88,387.50 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 182 | CUYD | 82.00 | 14,924.00 | 77.00 | 14,014.00 | 106.00 | 19,292.00 | 85.00 | 15,470.00 | | 0014 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 184 | SQYD | 112.00 | 20,608.00 | 143.00 | 26,312.00 | 125.00 | 23,000.00 | 65.00 | 11,960.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 10,344 | TON | 112.00 | 1,158,528.00 | 121.00 | 1,251,624.00 | 109.00 | 1,127,496.00 | 130.00 | 1,344,720.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,267 | TON | 112.00 | 141,904.00 | 190.00 | 240,730.00 | 190.00 | 240,730.00 | 225.00 | 285,075.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 50,887 | SQYD | 2.75 | 139,939.25 | 1.80 | 91,596.60 | 2.50 | 127,217.50 | 4.75 | 241,713.25 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,143 | CUYD | 0.01 | -21.43 | 0.01 | -21.43 | 0.01 | -21.43 | 0.01 | -21.43 | | 0019 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 2,478 | SQYD | 62.00 | 153,636.00 | 80.00 | 198,240.00 | 75.00 | 185,850.00 | 110.00 | 272,580.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 329 | SQYD | 85.00 | 27,965.00 | 120.00 | 39,480.00 | 150.00 | 49,350.00 | 175.00 | 57,575.00 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,472 | INLF | 1.50 | 2,208.00 | 3.00 | 4,416.00 | 2.00 | 2,944.00 | 1.50 | 2,208.00 | | 0022 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 420 | LNFT | 7.50 | 3,150.00 | 7.00 | 2,940.00 | 22.00 | 9,240.00 | 15.00 | 6,300.00 | | 0023 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 530 | LNFT | 7.50 | 3,975.00 | 7.00 | 3,710.00 | 22.00 | 11,660.00 | 15.00 | 7,950.00 | | 0024 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 1.8 | SQYD | 900.00 | 1,620.00 | 5,100.00 | 9,180.00 | 600.00 | 1,080.00 | 1,000.00 | 1,800.00 | | 0025 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 109.7 | SQYD | 325.00 | 35,652.50 | 410.00 | 44,977.00 | 375.00 | 41,137.50 | 800.00 | 87,760.00 | | 0026 | 602-08-00100 | Diamond Grinding Concrete Pavement | 120 | SQYD | 5.00 | 600.00 | 55.00 | 6,600.00 | 50.00 | 6,000.00 | 20.00 | 2,400.00 | | 0027 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 276 | LNFT | 235.00 | 64,860.00 | 292.00 | 80,592.00 | 214.75 | 59,271.00 | 250.00 | 69,000.00 | | 0028 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 156 | LNFT | 215.00 | 33,540.00 | 292.00 | 45,552.00 | 195.75 | 30,537.00 | 225.00 | 35,100.00 | | 0029 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 140 | LNFT | 260.00 | 36,400.00 | 338.00 | 47,320.00 | 236.25 | 33,075.00 | 275.00 | 38,500.00 | | 0030 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,500.00 | 2,500.00 | 4,300.00 | 4,300.00 | 3,242.00 | 3,242.00 | 5,000.00 | 5,000.00 | | 0031 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 218 | LNFT | 195.00 | 42,510.00 | 113.00 | 24,634.00 | 110.00 | 23,980.00 | 125.00 | 27,250.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 112.5 | LNFT | 38.00 | 4,275.00 | 26.00 | 2,925.00 | 25.00 | 2,812.50 | 30.00 | 3,375.00 | | 0033 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,900.00 | 7,800.00 | 3,600.00 | 7,200.00 | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | | 0034 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,450.00 | 6,900.00 | 3,600.00 | 7,200.00 | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 352.2 | SQYD | 110.00 | 38,742.00 | 92.00 | 32,402.40 | 100.00 | 35,220.00 | 110.00 | 38,742.00 | | 0036 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 4 | SQYD | 385.00 | 1,540.00 | 128.00 | 512.00 | 150.00 | 600.00 | 100.00 | 400.00 | | 0037 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 68.1 | SQYD | 100.00 | 6,810.00 | 128.00 | 8,716.80 | 150.00 | 10,215.00 | 100.00 | 6,810.00 | | 0038 | 707-01-00100 | Concrete Curb | 114 | LNFT | 40.00 | 4,560.00 | 46.00 | 5,244.00 | 50.00 | 5,700.00 | 35.00 | 3,990.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 161 | LNFT | 80.00 | 12,880.00 | 77.00 | 12,397.00 | 100.00 | 16,100.00 | 45.00 | 7,245.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 200,000.00 | 200,000.00 | 135,000.00 | 135,000.00 | 205,000.00 | 205,000.00 | | 0041 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.044 | MILE | 185.00 | 1,858.14 | 320.00 | 3,214.08 | 450.00 | 4,519.80 | 125.00 | 1,255.50 | | 0042 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.419 | MILE | 660.00 | 4,896.54 | 1.00 | 7.42 | 600.00 | 4,451.40 | 150.00 | 1,112.85 | | 0043 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.908 | MILE | 900.00 | 26,017.20 | 1.00 | 28.91 | 800.00 | 23,126.40 | 175.00 | 5,058.90 | | 0044 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 15 | EACH | 28.00 | 420.00 | 1.00 | 15.00 | 25.00 | 375.00 | 50.00 | 750.00 | | 0045 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 9 | EACH | 28.00 | 252.00 | 1.00 | 9.00 | 25.00 | 225.00 | 50.00 | 450.00 | | 0046 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 12 | EACH | 38.00 | 456.00 | 1.00 | 12.00 | 35.00 | 420.00 | 50.00 | 600.00 | | 0047 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 55.00 | 330.00 | 1.00 | 6.00 | 50.00 | 300.00 | 50.00 | 300.00 | | 0048 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 10,500.00 | 21,000.00 | 8,400.00 | 16,800.00 | 3,000.00 | 6,000.00 | 7,500.00 | 15,000.00 | | 0049 | 724-01-00100 | Rumble Strips (Centerline) | 3.348 | MILE | 330.00 | 1,104.84 | 307.00 | 1,027.84 | 1,000.00 | 3,348.00 | 500.00 | 1,674.00 | | 0050 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.786 | MILE | 330.00 | 1,909.38 | 307.00 | 1,776.30 | 1,000.00 | 5,786.00 | 500.00 | 2,893.00 | | 0051 | 726-01-00100 | Bedding Material | 57.4 | CUYD | 135.00 | 7,749.00 | 1.00 | 57.40 | 121.50 | 6,974.10 | 175.00 | 10,045.00 | | 0052 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 140,000.00 | 140,000.00 | 260,000.00 | 260,000.00 | 350,000.00 | 350,000.00 | | 0053 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 40.00 | 720.00 | 10.00 | 180.00 | 10.00 | 180.00 | 25.00 | 450.00 | | 0054 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 82.00 | 1,476.00 | 77.00 | 1,386.00 | 75.00 | 1,350.00 | 80.00 | 1,440.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 102.00 | 408.00 | 100.00 | 400.00 | 125.00 | 500.00 | | 0056 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 215.00 | 430.00 | 154.00 | 308.00 | 150.00 | 300.00 | 200.00 | 400.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,497 | EACH | 4.50 | 6,736.50 | 4.10 | 6,137.70 | 4.00 | 5,988.00 | 5.00 | 7,485.00 | | 0058 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,360 | LNFT | 4.50 | 6,120.00 | 4.10 | 5,576.00 | 4.00 | 5,440.00 | 5.00 | 6,800.00 | | 0059 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,409 | LNFT | 15.50 | 21,839.50 | 14.50 | 20,430.50 | 14.00 | 19,726.00 | 15.00 | 21,135.00 | | 0060 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 523 | LNFT | 4.50 | 2,353.50 | 4.10 | 2,144.30 | 4.00 | 2,092.00 | 5.00 | 2,615.00 | | 0061 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.134 | MILE | 4,800.00 | 48,643.20 | 4,500.00 | 45,603.00 | 4,400.00 | 44,589.60 | 5,000.00 | 50,670.00 | | 0062 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.489 | MILE | 1,200.00 | 2,986.80 | 1,130.00 | 2,812.57 | 1,100.00 | 2,737.90 | 1,500.00 | 3,733.50 | | 0063 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.133 | MILE | 10,750.00 | 1,429.75 | 10,230.00 | 1,360.59 | 10,000.00 | 1,330.00 | 15,000.00 | 1,995.00 | | 0064 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 450.00 | 2,250.00 | 410.00 | 2,050.00 | 400.00 | 2,000.00 | 500.00 | 2,500.00 | | 0065 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 450.00 | 1,350.00 | 410.00 | 1,230.00 | 400.00 | 1,200.00 | 500.00 | 1,500.00 | | 0066 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 550.00 | 2,200.00 | 512.00 | 2,048.00 | 500.00 | 2,000.00 | 600.00 | 2,400.00 | | 0067 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,040.00 | 2,080.00 | 972.00 | 1,944.00 | 950.00 | 1,900.00 | 1,000.00 | 2,000.00 | | 0068 | 732-05-00100 | Removal of Existing Markings | 0.138 | MILE | 11,000.00 | 1,518.00 | 10,230.00 | 1,411.74 | 10,000.00 | 1,380.00 | 15,000.00 | 2,070.00 | | 0069 | 735-01-00100 | Mailboxes | 85 | EACH | 22.00 | 1,870.00 | 51.00 | 4,335.00 | 50.00 | 4,250.00 | 75.00 | 6,375.00 | | 0070 | 735-02-00100 | Mailbox Supports (Single) | 85 | EACH | 250.00 | 21,250.00 | 230.00 | 19,550.00 | 225.00 | 19,125.00 | 235.00 | 19,975.00 | | 0071 | 737-05-00002 | Painted Curbs | 171 | LNFT | 2.20 | 376.20 | 2.25 | 384.75 | 2.00 | 342.00 | 5.00 | 855.00 | | 0072 | 737-06-00002 | Painted Islands | 69 | SQYD | 14.00 | 966.00 | 13.00 | 897.00 | 12.50 | 862.50 | 15.00 | 1,035.00 | | 0073 | 739-01-00100 | Hydro-Seeding | 3.56 | ACRE | 3,080.00 | 10,964.80 | 2,900.00 | 10,324.00 | 3,050.00 | 10,858.00 | 3,000.00 | 10,680.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 15,000.00 | 15,000.00 | | 0075 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 1 | EACH | 500.00 | 500.00 | 256.00 | 256.00 | 250.00 | 250.00 | 500.00 | 500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,741,226.67 | | 2,889,354.77 | | 2,908,527.47 | | 3,557,233.07 |
|