Proposal:H.016770.6
Parish:Lafourche
Routes:LA 1
Description:LA 1: LA 182 - ST. PATRICK BRIDGE
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$10,324,286.43
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $8,832,171.00 |
| 2 | 62139 | Huey P. Stockstill, LLC | $10,599,995.18 |
| 3 | 73475 | Madden Gulf Coast, LLC | $11,964,328.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | - 3 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.538 | LUMP | 95,000.00 | 95,000.00 | 118,000.00 | 118,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 22,100.00 | 22,100.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement Removal of Guard Rail Pads | 1,119 | SQYD | 7.50 | 8,392.50 | 12.00 | 13,428.00 | 18.00 | 20,142.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 99 | LNFT | 75.00 | 7,425.00 | 8.00 | 792.00 | 7.25 | 717.75 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 248 | SQYD | 121.00 | 30,008.00 | 27.50 | 6,820.00 | 25.00 | 6,200.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 628 | LNFT | 25.00 | 15,700.00 | 7.25 | 4,553.00 | 6.95 | 4,364.60 | | 0007 | 202-02-14500 | Removal of Guard Rail | 1,270 | LNFT | 10.45 | 13,271.50 | 11.00 | 13,970.00 | 6.50 | 8,255.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 5 | EACH | 25.25 | 126.25 | 26.00 | 130.00 | 200.00 | 1,000.00 | | 0009 | 202-02-38300 | Removal of Sign and U-Channel Post | 9 | EACH | 30.25 | 272.25 | 32.00 | 288.00 | 300.00 | 2,700.00 | | 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,308 | CUYD | 19.00 | 24,852.00 | 55.00 | 71,940.00 | 181.00 | 236,748.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 37,910.4 | TON | 122.00 | 4,625,068.80 | 138.00 | 5,231,635.20 | 132.00 | 5,004,172.80 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,935.4 | TON | 169.00 | 327,082.60 | 220.00 | 425,788.00 | 232.00 | 449,012.80 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 353,155 | SQYD | 2.50 | 882,887.50 | 2.35 | 829,914.25 | 3.75 | 1,324,331.25 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -14,717 | CUYD | 11.50 | -169,245.50 | 0.01 | -147.17 | 0.01 | -147.17 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,866 | SQYD | 109.00 | 203,394.00 | 115.00 | 214,590.00 | 175.50 | 327,483.00 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,273 | SQYD | 135.00 | 711,855.00 | 180.00 | 949,140.00 | 201.00 | 1,059,873.00 | | 0017 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 7,008 | LNFT | 2.00 | 14,016.00 | 2.00 | 14,016.00 | 2.25 | 15,768.00 | | 0018 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,570 | LNFT | 2.00 | 5,140.00 | 2.00 | 5,140.00 | 2.25 | 5,782.50 | | 0019 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 9,578 | LNFT | 0.85 | 8,141.30 | 1.00 | 9,578.00 | 1.50 | 14,367.00 | | 0020 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 2,344 | INLF | 2.00 | 4,688.00 | 2.25 | 5,274.00 | 2.25 | 5,274.00 | | 0021 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 376 | LNFT | 187.00 | 70,312.00 | 385.00 | 144,760.00 | 340.00 | 127,840.00 | | 0022 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 80 | LNFT | 256.00 | 20,480.00 | 400.00 | 32,000.00 | 350.00 | 28,000.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 456 | LNFT | 1.00 | 456.00 | 29.00 | 13,224.00 | 29.00 | 13,224.00 | | 0024 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 9,100.00 | 9,100.00 | 8,500.00 | 8,500.00 | 7,525.00 | 7,525.00 | | 0025 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 3,025.00 | 18,150.00 | 3,200.00 | 19,200.00 | 3,000.00 | 18,000.00 | | 0026 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 3,225.00 | 19,350.00 | 5,000.00 | 30,000.00 | 4,500.00 | 27,000.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 681.4 | LNFT | 25.25 | 17,205.35 | 26.00 | 17,716.40 | 34.00 | 23,167.60 | | 0028 | 704-03-00205 | Blocked Out Guard Rail - 31", (18.75" Post Spacing) | 75 | LNFT | 75.50 | 5,662.50 | 80.00 | 6,000.00 | 125.00 | 9,375.00 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 101.00 | 10,100.00 | 105.00 | 10,500.00 | 120.00 | 12,000.00 | | 0030 | 704-07-00300 | Guard Rail Transitions (Full Post to Quarter Post) | 50 | LNFT | 75.00 | 3,750.00 | 80.00 | 4,000.00 | 100.00 | 5,000.00 | | 0031 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,525.00 | 10,575.00 | 3,850.00 | 11,550.00 | 3,425.00 | 10,275.00 | | 0032 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 5 | EACH | 3,525.00 | 17,625.00 | 3,850.00 | 19,250.00 | 3,100.00 | 15,500.00 | | 0033 | 706-01-00100 | Concrete Walk (4" Thick) | 293.1 | SQYD | 85.50 | 25,060.05 | 75.00 | 21,982.50 | 70.50 | 20,663.55 | | 0034 | 706-04-00110 | Curb Ramps Type 3 | 153.9 | SQYD | 252.00 | 38,782.80 | 110.00 | 16,929.00 | 100.00 | 15,390.00 | | 0035 | 706-04-00110 | Curb Ramps Type 4 | 35.8 | SQYD | 252.00 | 9,021.60 | 110.00 | 3,938.00 | 100.00 | 3,580.00 | | 0036 | 706-04-00110 | Curb Ramps Type 5 | 57.3 | SQYD | 252.00 | 14,439.60 | 110.00 | 6,303.00 | 100.00 | 5,730.00 | | 0037 | 706-04-00110 | Curb Ramps Type 6 | 13.7 | SQYD | 252.00 | 3,452.40 | 110.00 | 1,507.00 | 100.00 | 1,370.00 | | 0038 | 707-01-00100 | Concrete Curb | 586 | LNFT | 35.00 | 20,510.00 | 11.00 | 6,446.00 | 25.00 | 14,650.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 99 | LNFT | 75.50 | 7,474.50 | 27.50 | 2,722.50 | 50.00 | 4,950.00 | | 0040 | 711-02-00300 | Riprap (30 lb) | 38 | CUYD | 202.00 | 7,676.00 | 400.00 | 15,200.00 | 340.00 | 12,920.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 87 | SQYD | 2.50 | 217.50 | 22.00 | 1,914.00 | 20.00 | 1,740.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 578,000.00 | 578,000.00 | 443,445.00 | 443,445.00 | 957,000.00 | 957,000.00 | | 0043 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,288 | LNFT | 0.15 | 643.20 | 0.15 | 643.20 | 0.20 | 857.60 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 3,862 | LNFT | 0.25 | 965.50 | 0.25 | 965.50 | 0.50 | 1,931.00 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 29.134 | MILE | 635.00 | 18,500.09 | 175.00 | 5,098.45 | 450.00 | 13,110.30 | | 0046 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.457 | MILE | 700.00 | 12,219.90 | 700.00 | 12,219.90 | 750.00 | 13,092.75 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 84.183 | MILE | 900.00 | 75,764.70 | 900.00 | 75,764.70 | 1,000.00 | 84,183.00 | | 0048 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 54 | EACH | 25.00 | 1,350.00 | 25.00 | 1,350.00 | 50.00 | 2,700.00 | | 0049 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 14 | EACH | 25.00 | 350.00 | 25.00 | 350.00 | 50.00 | 700.00 | | 0050 | 716-01-00100 | Mulch (Vegetative) | 4.1 | TON | 990.00 | 4,059.00 | 750.00 | 3,075.00 | 950.00 | 3,895.00 | | 0051 | 717-01-00100 | Seeding | 138 | LB | 10.75 | 1,483.50 | 8.50 | 1,173.00 | 11.00 | 1,518.00 | | 0052 | 718-01-00100 | Fertilizer | 2,311 | LB | 0.98 | 2,264.78 | 0.50 | 1,155.50 | 0.95 | 2,195.45 | | 0053 | 726-01-00100 | Bedding Material | 86.8 | CUYD | 1.00 | 86.80 | 215.00 | 18,662.00 | 205.00 | 17,794.00 | | 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 375,000.00 | 375,000.00 | 1,000,000.00 | 1,000,000.00 | 1,200,000.00 | 1,200,000.00 | | 0055 | 729-16-00300 | Object Marker Assembly (Type 3) | 26 | EACH | 101.00 | 2,626.00 | 100.00 | 2,600.00 | 85.00 | 2,210.00 | | 0056 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,260.00 | 1,260.00 | 1,250.00 | 1,250.00 | 3,500.00 | 3,500.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,476 | EACH | 4.55 | 20,365.80 | 4.75 | 21,261.00 | 7.50 | 33,570.00 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,072 | LNFT | 4.05 | 4,341.60 | 4.50 | 4,824.00 | 3.50 | 3,752.00 | | 0059 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,609 | LNFT | 15.00 | 24,135.00 | 17.00 | 27,353.00 | 17.50 | 28,157.50 | | 0060 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 322 | LNFT | 15.00 | 4,830.00 | 17.00 | 5,474.00 | 20.00 | 6,440.00 | | 0061 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 42.092 | MILE | 4,550.00 | 191,518.60 | 5,000.00 | 210,460.00 | 5,500.00 | 231,506.00 | | 0062 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.729 | MILE | 1,205.00 | 10,518.45 | 1,250.00 | 10,911.25 | 1,250.00 | 10,911.25 | | 0063 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.203 | MILE | 9,100.00 | 1,847.30 | 9,000.00 | 1,827.00 | 5,000.00 | 1,015.00 | | 0064 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 27 | EACH | 352.00 | 9,504.00 | 400.00 | 10,800.00 | 300.00 | 8,100.00 | | 0065 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 455.00 | 3,185.00 | 500.00 | 3,500.00 | 300.00 | 2,100.00 | | 0066 | 732-05-00100 | Removal of Existing Markings | 0.03 | MILE | 30,000.00 | 900.00 | 30,000.00 | 900.00 | 7,500.00 | 225.00 | | 0067 | 735-01-00100 | Mailboxes | 741 | EACH | 1.00 | 741.00 | 55.00 | 40,755.00 | 1.00 | 741.00 | | 0068 | 735-02-00100 | Mailbox Supports (Single) | 579 | EACH | 222.00 | 128,538.00 | 200.00 | 115,800.00 | 273.00 | 158,067.00 | | 0069 | 735-03-00100 | Mailbox Supports (Double) | 81 | EACH | 282.00 | 22,842.00 | 250.00 | 20,250.00 | 273.00 | 22,113.00 | | 0070 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 14.50 | 290.00 | 17.75 | 355.00 | 17.00 | 340.00 | | 0071 | 736-09-00100 | Loop Detector | 692 | LNFT | 35.65 | 24,669.80 | 28.00 | 19,376.00 | 27.26 | 18,863.92 | | 0072 | 736-10-00500 | Underground Junction Box (Type H) | 3 | EACH | 2,750.00 | 8,250.00 | 4,150.00 | 12,450.00 | 4,115.00 | 12,345.00 | | 0073 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 19.05 | 381.00 | 2.00 | 40.00 | 2.00 | 40.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,724.48 | 11,724.48 | 55,000.00 | 55,000.00 | 35,000.00 | 35,000.00 | | 0075 | 741-35-00100 | Adjust Valve or Meter Box | 7 | EACH | 2,220.00 | 15,540.00 | 345.00 | 2,415.00 | 330.00 | 2,310.00 | | 0076 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 4 | EACH | 30,250.00 | 121,000.00 | 32,500.00 | 130,000.00 | 29,500.00 | 118,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,832,171.00 | | 10,599,995.18 | | 11,964,328.45 |
|