Proposal:H.016110.6
Parish:St. Martin
Routes:LA 31
Description:LA 31: LA 94 - LA 341
Type Construction:DRAINAGE STRUCTURES, LIME TREATMENT, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH (COMPLETE ROADWAY SYSTEM), EPOXY-URETHANE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,982,036.00
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $7,033,194.79 |
| 2 | 34356 | Prairie Contractors LLC | $7,698,478.25 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $9,536,932.47 |
| 4 | 33663 | Glenn Lege Construction LLC | $9,772,891.76 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 34,122.85 | 34,122.85 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 2,962 | SQYD | 15.00 | 44,430.00 | 5.00 | 14,810.00 | 25.00 | 74,050.00 | 21.97 | 65,075.14 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 91.8 | SQYD | 34.00 | 3,121.20 | 100.00 | 9,180.00 | 35.00 | 3,213.00 | 33.06 | 3,034.91 | | 0004 | 202-02-04540 | Removal of Bridge Component | 1 | EACH | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | 6,500.00 | 6,500.00 | 13,938.00 | 13,938.00 | | 0005 | 202-02-04560 | Removal of Bridge Joint (Performed Silicone) | 560 | LNFT | 2.00 | 1,120.00 | 35.00 | 19,600.00 | 25.00 | 14,000.00 | 37.81 | 21,173.60 | | 0006 | 202-02-04560 | Removal of Bridge Joint (Poured) | 135 | LNFT | 6.00 | 810.00 | 35.00 | 4,725.00 | 25.00 | 3,375.00 | 37.81 | 5,104.35 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,139 | SQYD | 30.00 | 34,170.00 | 40.00 | 45,560.00 | 35.00 | 39,865.00 | 26.68 | 30,388.52 | | 0008 | 202-02-14500 | Removal of Guard Rail | 776 | LNFT | 16.50 | 12,804.00 | 16.00 | 12,416.00 | 8.50 | 6,596.00 | 10.99 | 8,528.24 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,022 | CUYD | 45.00 | 45,990.00 | 15.00 | 15,330.00 | 60.00 | 61,320.00 | 42.14 | 43,067.08 | | 0010 | 203-10-00100 | Cleaning Existing Ditches | 140 | LNFT | 30.00 | 4,200.00 | 25.00 | 3,500.00 | 30.00 | 4,200.00 | 43.41 | 6,077.40 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 150.00 | 1,500.00 | 150.00 | 1,500.00 | 140.00 | 1,400.00 | 232.30 | 2,323.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 870 | LNFT | 3.25 | 2,827.50 | 4.00 | 3,480.00 | 3.00 | 2,610.00 | 3.48 | 3,027.60 | | 0013 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 69,927 | SQYD | 11.50 | 804,160.50 | 12.50 | 874,087.50 | 13.00 | 909,051.00 | 12.55 | 877,583.85 | | 0014 | 303-02-00100 | Removal of Existing Patches | 1,000 | SQYD | 10.00 | 10,000.00 | 8.50 | 8,500.00 | 30.00 | 30,000.00 | 24.31 | 24,310.00 | | 0015 | 304-01-00100 | Lime | 137.77 | TON | 330.00 | 45,464.10 | 300.00 | 41,331.00 | 340.00 | 46,841.80 | 405.67 | 55,889.16 | | 0016 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 17,482 | SQYD | 5.00 | 87,410.00 | 4.52 | 79,018.64 | 6.00 | 104,892.00 | 6.96 | 121,674.72 | | 0017 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 69,927 | SQYD | 8.00 | 559,416.00 | 9.00 | 629,343.00 | 12.00 | 839,124.00 | 11.49 | 803,461.23 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,975 | CUYD | 60.00 | 178,500.00 | 39.00 | 116,025.00 | 115.00 | 342,125.00 | 89.89 | 267,422.75 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 645.7 | CUYD | 60.00 | 38,742.00 | 45.00 | 29,056.50 | 75.00 | 48,427.50 | 91.34 | 58,978.24 | | 0020 | 502-01-00100 | Asphalt Concrete | 20,075.3 | TON | 128.00 | 2,569,638.40 | 136.50 | 2,740,278.45 | 153.00 | 3,071,520.90 | 170.10 | 3,414,808.53 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,138.7 | TON | 185.00 | 395,659.50 | 60.00 | 128,322.00 | 195.00 | 417,046.50 | 232.79 | 497,867.97 | | 0022 | 509-01-00100 | Milling Asphalt Pavement | 62,481 | SQYD | 3.00 | 187,443.00 | 3.50 | 218,683.50 | 7.25 | 452,987.25 | 3.50 | 218,683.50 | | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,901 | CUYD | 0.01 | -39.01 | 0.01 | -39.01 | 0.00 | 0.00 | 0.01 | -39.01 | | 0024 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 172 | SQYD | 225.00 | 38,700.00 | 192.00 | 33,024.00 | 210.00 | 36,120.00 | 216.58 | 37,251.76 | | 0025 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 104 | LNFT | 11.00 | 1,144.00 | 30.00 | 3,120.00 | 25.00 | 2,600.00 | 77.95 | 8,106.80 | | 0026 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 104 | LNFT | 6.00 | 624.00 | 15.00 | 1,560.00 | 15.00 | 1,560.00 | 8.72 | 906.88 | | 0027 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 24 | LNFT | 225.00 | 5,400.00 | 220.00 | 5,280.00 | 450.00 | 10,800.00 | 103.23 | 2,477.52 | | 0028 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 24 | LNFT | 250.00 | 6,000.00 | 210.00 | 5,040.00 | 475.00 | 11,400.00 | 129.65 | 3,111.60 | | 0029 | 701-04-02040 | Storm Drain Pipe Arch (Outfall) (24" Equiv. CMPA) | 64 | LNFT | 200.00 | 12,800.00 | 525.00 | 33,600.00 | 500.00 | 32,000.00 | 157.97 | 10,110.08 | | 0030 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 8 | LNFT | 325.00 | 2,600.00 | 525.00 | 4,200.00 | 540.00 | 4,320.00 | 252.77 | 2,022.16 | | 0031 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 12 | LNFT | 350.00 | 4,200.00 | 550.00 | 6,600.00 | 720.00 | 8,640.00 | 225.70 | 2,708.40 | | 0032 | 701-14-00100 | Cleaning Existing Pipes (24" RCP) | 111 | LNFT | 45.00 | 4,995.00 | 55.00 | 6,105.00 | 70.00 | 7,770.00 | 78.41 | 8,703.51 | | 0033 | 701-14-00100 | Cleaning Existing Pipes (30" RCP) | 318 | LNFT | 50.00 | 15,900.00 | 60.00 | 19,080.00 | 75.00 | 23,850.00 | 78.41 | 24,934.38 | | 0034 | 701-14-00100 | Cleaning Existing Pipes (36" RCP) | 410 | LNFT | 60.00 | 24,600.00 | 70.00 | 28,700.00 | 80.00 | 32,800.00 | 78.41 | 32,148.10 | | 0035 | 701-15-00100 | Concrete Collar | 5 | EACH | 3,000.00 | 15,000.00 | 3,000.00 | 15,000.00 | 5,000.00 | 25,000.00 | 1,537.73 | 7,688.65 | | 0036 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 112 | LNFT | 20.00 | 2,240.00 | 15.00 | 1,680.00 | 20.00 | 2,240.00 | 32.68 | 3,660.16 | | 0037 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 6,500.00 | 19,500.00 | 8,000.00 | 24,000.00 | 9,000.00 | 27,000.00 | 5,784.78 | 17,354.34 | | 0038 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 4,000.00 | 4,000.00 | 4,250.00 | 4,250.00 | 7,500.00 | 7,500.00 | 2,269.98 | 2,269.98 | | 0039 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 185 | LNFT | 48.00 | 8,880.00 | 100.00 | 18,500.00 | 48.00 | 8,880.00 | 49.94 | 9,238.90 | | 0040 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 231.3 | LNFT | 38.00 | 8,789.40 | 45.00 | 10,408.50 | 38.00 | 8,789.40 | 49.79 | 11,516.43 | | 0041 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 135.00 | 20,250.00 | 225.00 | 33,750.00 | 130.00 | 19,500.00 | 175.74 | 26,361.00 | | 0042 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,950.00 | 4,950.00 | 8,000.00 | 8,000.00 | 500.00 | 500.00 | 6,590.25 | 6,590.25 | | 0043 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 3,740.00 | 22,440.00 | 5,500.00 | 33,000.00 | 3,800.00 | 22,800.00 | 4,979.30 | 29,875.80 | | 0044 | 706-02-00200 | Concrete Drive (6" Thick) | 949.3 | SQYD | 120.00 | 113,916.00 | 155.00 | 147,141.50 | 190.00 | 180,367.00 | 96.81 | 91,901.73 | | 0045 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 5.3 | SQYD | 175.00 | 927.50 | 300.00 | 1,590.00 | 1,800.00 | 9,540.00 | 524.00 | 2,777.20 | | 0046 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 39 | SQYD | 275.00 | 10,725.00 | 220.00 | 8,580.00 | 250.00 | 9,750.00 | 272.99 | 10,646.61 | | 0047 | 711-04-00100 | Geotextile Fabric | 39 | SQYD | 10.00 | 390.00 | 8.00 | 312.00 | 5.00 | 195.00 | 18.78 | 732.42 | | 0048 | 712-02-00100 | Sacked Concrete Revetment | 4 | SQYD | 600.00 | 2,400.00 | 800.00 | 3,200.00 | 1,000.00 | 4,000.00 | 1,519.42 | 6,077.68 | | 0049 | 712-04-00100 | Flexible Revetment | 6 | SQYD | 600.00 | 3,600.00 | 800.00 | 4,800.00 | 1,300.00 | 7,800.00 | 1,012.94 | 6,077.64 | | 0050 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | 460,000.00 | 460,000.00 | 460,705.34 | 460,705.34 | | 0051 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.584 | MILE | 860.00 | 15,122.24 | 800.00 | 14,067.20 | 325.00 | 5,714.80 | 696.90 | 12,254.29 | | 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.276 | MILE | 700.00 | 7,893.20 | 1.00 | 11.28 | 660.00 | 7,442.16 | 696.90 | 7,858.24 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 53.792 | MILE | 880.00 | 47,336.96 | 1.00 | 53.79 | 880.00 | 47,336.96 | 929.20 | 49,983.53 | | 0054 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 26,068.10 | 26,068.10 | | 0055 | 724-01-00100 | Rumble Strips (Centerline) | 4.129 | MILE | 1,100.00 | 4,541.90 | 1,250.00 | 5,161.25 | 400.00 | 1,651.60 | 1,161.50 | 4,795.83 | | 0056 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.259 | MILE | 1,100.00 | 9,084.90 | 1,250.00 | 10,323.75 | 400.00 | 3,303.60 | 1,161.50 | 9,592.83 | | 0057 | 726-01-00100 | Bedding Material | 19.3 | CUYD | 150.00 | 2,895.00 | 220.00 | 4,246.00 | 185.00 | 3,570.50 | 187.33 | 3,615.47 | | 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 820,000.00 | 820,000.00 | 950,000.00 | 950,000.00 | 730,092.79 | 730,092.79 | | 0059 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 90.00 | 2,160.00 | 90.00 | 2,160.00 | 88.00 | 2,112.00 | 92.92 | 2,230.08 | | 0060 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 105.00 | 1,470.00 | 150.00 | 2,100.00 | 104.00 | 1,456.00 | 110.34 | 1,544.76 | | 0061 | 731-02-00100 | Reflectorized Raised Pavement Markers | 788 | EACH | 5.50 | 4,334.00 | 7.00 | 5,516.00 | 6.00 | 4,728.00 | 5.81 | 4,578.28 | | 0062 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.448 | MILE | 4,840.00 | 65,088.32 | 6,000.00 | 80,688.00 | 4,900.00 | 65,895.20 | 5,110.60 | 68,727.35 | | 0063 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.819 | MILE | 1,320.00 | 3,721.08 | 1,600.00 | 4,510.40 | 1,200.00 | 3,382.80 | 1,393.80 | 3,929.12 | | 0064 | 732-05-00100 | Removal of Existing Markings | 0.252 | MILE | 8,800.00 | 2,217.60 | 10,000.00 | 2,520.00 | 8,800.00 | 2,217.60 | 9,292.00 | 2,341.58 | | 0065 | 735-01-00100 | Mailboxes | 134 | EACH | 35.00 | 4,690.00 | 10.00 | 1,340.00 | 33.00 | 4,422.00 | 29.04 | 3,891.36 | | 0066 | 735-02-00100 | Mailbox Supports (Single) | 106 | EACH | 285.00 | 30,210.00 | 325.00 | 34,450.00 | 280.00 | 29,680.00 | 336.84 | 35,705.04 | | 0067 | 735-03-00100 | Mailbox Supports (Double) | 14 | EACH | 395.00 | 5,530.00 | 325.00 | 4,550.00 | 400.00 | 5,600.00 | 377.49 | 5,284.86 | | 0068 | 739-01-00100 | Hydro-Seeding | 3.01 | ACRE | 2,750.00 | 8,277.50 | 3,500.00 | 10,535.00 | 2,700.00 | 8,127.00 | 3,252.20 | 9,789.12 | | 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 40,000.00 | 40,000.00 | 287,042.00 | 287,042.00 | | 0070 | 815-03-00200 | Joint Seal (Preformed Silicone) | 56 | LNFT | 250.00 | 14,000.00 | 185.00 | 10,360.00 | 300.00 | 16,800.00 | 290.75 | 16,282.00 | | 0071 | 815-03-00300 | Joint Seal (Poured) | 48 | LNFT | 50.00 | 2,400.00 | 50.00 | 2,400.00 | 175.00 | 8,400.00 | 121.64 | 5,838.72 | | 0072 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 62,473 | SQYD | 8.00 | 499,784.00 | 9.00 | 562,257.00 | 8.30 | 518,525.90 | 10.74 | 670,960.02 | | 0073 | NS-700-00830 | Impact Attenuator (Reusable, Test Level 2) | 1 | EACH | 32,600.00 | 32,600.00 | 50,000.00 | 50,000.00 | 32,000.00 | 32,000.00 | 34,409.44 | 34,409.44 | | 0074 | NS-830-00900 | Epoxy-Urethane Overlay | 39,000 | SQFT | 7.50 | 292,500.00 | 9.00 | 351,000.00 | 7.30 | 284,700.00 | 9.58 | 373,620.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,033,194.79 | | 7,698,478.25 | | 9,536,932.47 | | 9,772,891.76 |
|