Proposal:H.016109.6
Parish:St. Charles
Routes:LA 3127
Description:LA 3127 WESTBOUND: ST. JOHN P/L - I-310
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, MILLING CONCRETE PAVEMENT, ASPHALT CONCRETE OVERLAY, PAVEMENT PATCHING, COFFERDAMS, AND RELATED WORK.
Estimated Construction Cost:$9,957,783.75
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $7,479,171.00 |
| 2 | 73475 | Madden Gulf Coast, LLC | $9,288,544.63 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $9,447,277.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 177.3 | SQYD | 25.00 | 4,432.50 | 25.00 | 4,432.50 | 25.00 | 4,432.50 | | 0002 | 202-02-14500 | Removal of Guard Rail | 2,100.4 | LNFT | 10.65 | 22,369.26 | 6.00 | 12,602.40 | 15.00 | 31,506.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 56" x 39" CMPA (48" EQUIV. CMPA) | 576 | LNFT | 50.50 | 29,088.00 | 30.00 | 17,280.00 | 35.00 | 20,160.00 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 23 | EACH | 20.25 | 465.75 | 65.00 | 1,495.00 | 25.00 | 575.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,200 | CUYD | 23.50 | 98,700.00 | 25.00 | 105,000.00 | 30.00 | 126,000.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 42,495.1 | TON | 115.00 | 4,886,936.50 | 118.00 | 5,014,421.80 | 135.00 | 5,736,838.50 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,771.5 | TON | 1.00 | 2,771.50 | 50.00 | 138,575.00 | 230.00 | 637,445.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 233,391 | SQYD | 2.00 | 466,782.00 | 3.00 | 700,173.00 | 3.50 | 816,868.50 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -13,172 | CUYD | 0.01 | -131.72 | 0.01 | -131.72 | 0.10 | -1,317.20 | | 0010 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 3,500 | SQYD | 101.00 | 353,500.00 | 120.00 | 420,000.00 | 175.00 | 612,500.00 | | 0011 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 576 | LNFT | 425.00 | 244,800.00 | 375.00 | 216,000.00 | 450.00 | 259,200.00 | | 0012 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 192 | LNFT | 1.00 | 192.00 | 25.00 | 4,800.00 | 1.00 | 192.00 | | 0013 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,175.2 | LNFT | 30.25 | 35,549.80 | 34.00 | 39,956.80 | 30.00 | 35,256.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 101.00 | 20,200.00 | 120.00 | 24,000.00 | 115.00 | 23,000.00 | | 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,550.00 | 28,400.00 | 3,150.00 | 25,200.00 | 3,750.00 | 30,000.00 | | 0016 | 711-02-00300 | Riprap (30 lb) | 30 | CUYD | 252.00 | 7,560.00 | 175.00 | 5,250.00 | 200.00 | 6,000.00 | | 0017 | 711-04-00100 | Geotextile Fabric | 45 | SQYD | 3.00 | 135.00 | 3.00 | 135.00 | 1.00 | 45.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 380,000.00 | 380,000.00 | 500,000.00 | 500,000.00 | 470,000.00 | 470,000.00 | | 0019 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 5,655 | LNFT | 0.35 | 1,979.25 | 0.35 | 1,979.25 | 0.10 | 565.50 | | 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.552 | MILE | 684.00 | 18,161.57 | 450.00 | 11,948.40 | 350.00 | 9,293.20 | | 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 26.552 | MILE | 700.00 | 18,586.40 | 700.00 | 18,586.40 | 725.00 | 19,250.20 | | 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 60.03 | MILE | 1,200.00 | 72,036.00 | 1,200.00 | 72,036.00 | 925.00 | 55,527.75 | | 0023 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 3 | EACH | 25.00 | 75.00 | 25.00 | 75.00 | 25.00 | 75.00 | | 0024 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 21 | EACH | 25.00 | 525.00 | 25.00 | 525.00 | 25.00 | 525.00 | | 0025 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 3 | EACH | 25.00 | 75.00 | 25.00 | 75.00 | 25.00 | 75.00 | | 0026 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 25.00 | 75.00 | 25.00 | 75.00 | 25.00 | 75.00 | | 0027 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 126 | EACH | 375.00 | 47,250.00 | 550.00 | 69,300.00 | 400.00 | 50,400.00 | | 0028 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 252 | EACH | 425.00 | 107,100.00 | 220.00 | 55,440.00 | 80.00 | 20,160.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 20 | TON | 675.00 | 13,500.00 | 675.00 | 13,500.00 | 700.00 | 14,000.00 | | 0030 | 717-01-00100 | Seeding | 600 | LB | 9.75 | 5,850.00 | 975.00 | 585,000.00 | 10.00 | 6,000.00 | | 0031 | 718-01-00100 | Fertilizer | 9,500 | LB | 0.88 | 8,360.00 | 0.90 | 8,550.00 | 1.00 | 9,500.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.08 | MILE | 302.00 | 4,554.16 | 1,000.00 | 15,080.00 | 325.00 | 4,901.00 | | 0033 | 726-01-00100 | Bedding Material | 195.9 | CUYD | 1.00 | 195.90 | 120.00 | 23,508.00 | 125.00 | 24,487.50 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 380,000.00 | 380,000.00 | 825,000.00 | 825,000.00 | 225,000.00 | 225,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 23 | EACH | 101.00 | 2,323.00 | 100.00 | 2,300.00 | 100.00 | 2,300.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,597 | EACH | 5.00 | 7,985.00 | 5.00 | 7,985.00 | 6.50 | 10,380.50 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,885 | LNFT | 4.05 | 7,634.25 | 4.00 | 7,540.00 | 3.25 | 6,126.25 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 96 | LNFT | 20.00 | 1,920.00 | 20.00 | 1,920.00 | 12.50 | 1,200.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.01 | MILE | 5,050.00 | 101,050.50 | 5,000.00 | 100,050.00 | 5,250.00 | 105,052.50 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.851 | MILE | 1,320.00 | 11,683.32 | 1,300.00 | 11,506.30 | 2,250.00 | 19,914.75 | | 0041 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.307 | MILE | 10,650.00 | 3,269.55 | 10,500.00 | 3,223.50 | 11,000.00 | 3,377.00 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 405.00 | 405.00 | 400.00 | 400.00 | 250.00 | 250.00 | | 0043 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 7 | EACH | 405.00 | 2,835.00 | 400.00 | 2,800.00 | 250.00 | 1,750.00 | | 0044 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 1 | EACH | 755.00 | 755.00 | 750.00 | 750.00 | 250.00 | 250.00 | | 0045 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 655.00 | 655.00 | 650.00 | 650.00 | 250.00 | 250.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.091 | MILE | 20,000.00 | 1,820.00 | 20,000.00 | 1,820.00 | 6,500.00 | 591.50 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 29,552.81 | 29,552.81 | 137,000.00 | 137,000.00 | 15,000.00 | 15,000.00 | | 0048 | 817-03-00100 | Cofferdams | 1 | LUMP | 28,500.00 | 28,500.00 | 25,000.00 | 25,000.00 | 17,500.00 | 17,500.00 | | 0049 | NS-602-00001 | Milling Concrete Pavement | 886.6 | SQYD | 19.50 | 17,288.70 | 20.00 | 17,732.00 | 15.00 | 13,299.00 | | 0050 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 4 | EACH | 355.00 | 1,420.00 | 9,500.00 | 38,000.00 | 375.00 | 1,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,479,171.00 | | 9,288,544.63 | | 9,447,277.95 |
|