Proposal:H.015909.6
Parish:Madison, Richland
Routes:US 80
Description:US 80: BAYOU MACON BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF STEEL I-BEAM BRIDGE, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, RIP RAP, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$9,626,971.20
| Rank | License | Bidder | Construction Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $8,749,129.67 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $8,889,765.60 |
| 3 | 39613 | Baker Pile Driving and Site Work, LLC | $9,481,087.87 |
| 4 | 49239 | WL Bass Construction Inc. | $11,571,109.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - Gilchrist Construction Company, LLC | - 3 - Baker Pile Driving and Site Work, LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.08 | LUMP | 600,000.00 | 600,000.00 | 900,000.00 | 900,000.00 | 257,040.46 | 257,040.46 | 130,000.00 | 130,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 951 | SQYD | 8.00 | 7,608.00 | 20.00 | 19,020.00 | 44.51 | 42,329.01 | 4.00 | 3,804.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 350 | SQYD | 26.00 | 9,100.00 | 14.00 | 4,900.00 | 35.40 | 12,390.00 | 5.00 | 1,750.00 | | 0004 | 202-02-04501 | Removal of Bridge (RECALL NO. 023280, 33.5' X 423.0' STEEL I-BEAM (ROLLED)) | 14,171 | LUMP | 1,000,000.00 | 1,000,000.00 | 625,000.00 | 625,000.00 | 1,054,969.63 | 1,054,969.63 | 1,313,300.00 | 1,313,300.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 1,306 | LNFT | 6.00 | 7,836.00 | 7.00 | 9,142.00 | 97.66 | 127,543.96 | 11.00 | 14,366.00 | | 0006 | 202-02-32000 | Removal of Paved Ditches | 87 | SQYD | 60.00 | 5,220.00 | 80.00 | 6,960.00 | 56.32 | 4,899.84 | 10.00 | 870.00 | | 0007 | 202-02-38300 | Removal of Sign and U-Channel Post | 2 | EACH | 50.00 | 100.00 | 35.00 | 70.00 | 228.87 | 457.74 | 200.00 | 400.00 | | 0008 | 202-03-38000 | Relocation of Sign | 7 | EACH | 50.00 | 350.00 | 25.00 | 175.00 | 98.18 | 687.26 | 1,200.00 | 8,400.00 | | 0009 | 203-02-00100 | Drainage Excavation | 1,917 | CUYD | 24.00 | 46,008.00 | 28.00 | 53,676.00 | 37.35 | 71,599.95 | 32.00 | 61,344.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 55,000.00 | 55,000.00 | 250,000.00 | 250,000.00 | 56,409.28 | 56,409.28 | 60,000.00 | 60,000.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,764 | LNFT | 8.00 | 14,112.00 | 3.00 | 5,292.00 | 5.37 | 9,472.68 | 3.00 | 5,292.00 | | 0012 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 413.4 | SQYD | 90.00 | 37,206.00 | 75.00 | 31,005.00 | 208.00 | 85,987.20 | 90.00 | 37,206.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 96.6 | CUYD | 180.00 | 17,388.00 | 160.00 | 15,456.00 | 222.00 | 21,445.20 | 220.00 | 21,252.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 583 | TON | 240.00 | 139,920.00 | 250.00 | 145,750.00 | 511.89 | 298,431.87 | 240.00 | 139,920.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 168.7 | TON | 275.00 | 46,392.50 | 250.00 | 42,175.00 | 513.00 | 86,543.10 | 275.00 | 46,392.50 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 2,134 | SQYD | 10.00 | 21,340.00 | 9.00 | 19,206.00 | 34.77 | 74,199.18 | 22.00 | 46,948.00 | | 0017 | 510-01-00001 | Pavement Patching 14" Minimum Thickness | 36 | SQYD | 360.00 | 12,960.00 | 400.00 | 14,400.00 | 583.91 | 21,020.76 | 310.00 | 11,160.00 | | 0018 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 36 | SQYD | 380.00 | 13,680.00 | 400.00 | 14,400.00 | 583.91 | 21,020.76 | 310.00 | 11,160.00 | | 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 5,980 | INLF | 1.25 | 7,475.00 | 3.00 | 17,940.00 | 5.84 | 34,923.20 | 2.50 | 14,950.00 | | 0020 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 168 | LNFT | 50.00 | 8,400.00 | 25.00 | 4,200.00 | 31.36 | 5,268.48 | 5.00 | 840.00 | | 0021 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 280 | LNFT | 5.00 | 1,400.00 | 25.00 | 7,000.00 | 15.61 | 4,370.80 | 1.00 | 280.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 50.00 | 7,500.00 | 34.00 | 5,100.00 | 36.86 | 5,529.00 | 35.00 | 5,250.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 150.00 | 15,000.00 | 115.00 | 11,500.00 | 187.26 | 18,726.00 | 135.00 | 13,500.00 | | 0024 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,500.00 | 14,000.00 | 3,400.00 | 13,600.00 | 3,820.86 | 15,283.44 | 4,150.00 | 16,600.00 | | 0025 | 711-02-00400 | Riprap (55 lb) | 3,141 | CUYD | 160.00 | 502,560.00 | 150.00 | 471,150.00 | 157.11 | 493,482.51 | 101.00 | 317,241.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 1,654 | SQYD | 8.00 | 13,232.00 | 7.00 | 11,578.00 | 7.44 | 12,305.76 | 4.00 | 6,616.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 274,905.31 | 274,905.31 | 200,000.00 | 200,000.00 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 0.117 | MILE | 1,400.00 | 163.80 | 1,000.00 | 117.00 | 4,750.00 | 555.75 | 350.00 | 40.95 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.234 | MILE | 350.00 | 81.90 | 1,000.00 | 234.00 | 2,005.00 | 469.17 | 350.00 | 81.90 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 850,000.00 | 850,000.00 | 840,000.00 | 840,000.00 | 857,418.55 | 857,418.55 | 1,157,000.00 | 1,157,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 15 | SQFT | 25.00 | 375.00 | 35.00 | 525.00 | 35.87 | 538.05 | 50.00 | 750.00 | | 0032 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 25.00 | 50.00 | 15.00 | 30.00 | 228.87 | 457.74 | 50.00 | 100.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 100.00 | 400.00 | 234.92 | 939.68 | 135.00 | 540.00 | | 0034 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 7 | EACH | 300.00 | 2,100.00 | 350.00 | 2,450.00 | 224.40 | 1,570.80 | 150.00 | 1,050.00 | | 0035 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,363 | EACH | 10.00 | 13,630.00 | 10.00 | 13,630.00 | 11.74 | 16,001.62 | 10.00 | 13,630.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 58 | EACH | 25.00 | 1,450.00 | 25.00 | 1,450.00 | 35.00 | 2,030.00 | 25.00 | 1,450.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.87 | MILE | 7,500.00 | 6,525.00 | 7,500.00 | 6,525.00 | 9,027.00 | 7,853.49 | 7,500.00 | 6,525.00 | | 0038 | 739-01-00100 | Hydro-Seeding | 1.1 | ACRE | 4,400.00 | 4,840.00 | 2,800.00 | 3,080.00 | 7,687.10 | 8,455.81 | 5,100.00 | 5,610.00 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 200,000.00 | 200,000.00 | 262,261.72 | 262,261.72 | 150,000.00 | 150,000.00 | | 0040 | 804-01-00600 | Precast Concrete Piles (24") | 1,704 | LNFT | 240.00 | 408,960.00 | 256.00 | 436,224.00 | 279.54 | 476,336.16 | 360.00 | 613,440.00 | | 0041 | 804-01-00800 | Precast Concrete Piles (36") | 1,584 | LNFT | 420.00 | 665,280.00 | 485.00 | 768,240.00 | 582.06 | 921,983.04 | 2,200.00 | 3,484,800.00 | | 0042 | 804-10-00600 | Precast Concrete Indicator Piles (24") | 1 | EACH | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 129,580.81 | 129,580.81 | 150,000.00 | 150,000.00 | | 0043 | 804-10-00800 | Precast Concrete Indicator Piles (36") | 1 | EACH | 270,000.00 | 270,000.00 | 200,000.00 | 200,000.00 | 143,203.33 | 143,203.33 | 250,000.00 | 250,000.00 | | 0044 | 804-14-00100 | Dynamic Monitoring Assistance | 12 | EACH | 1,500.00 | 18,000.00 | 7,000.00 | 84,000.00 | 5,011.74 | 60,140.88 | 2,500.00 | 30,000.00 | | 0045 | 805-01-00200 | Class A1 Concrete (Deck) | 554.82 | CUYD | 1,400.00 | 776,748.00 | 1,500.00 | 832,230.00 | 1,531.00 | 849,429.42 | 350.00 | 194,187.00 | | 0046 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 187.84 | CUYD | 2,200.00 | 413,248.00 | 2,400.00 | 450,816.00 | 2,716.00 | 510,173.44 | 350.00 | 65,744.00 | | 0047 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 2,238 | LNFT | 650.00 | 1,454,700.00 | 440.00 | 984,720.00 | 439.30 | 983,153.40 | 750.00 | 1,678,500.00 | | 0048 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 6,570 | SQFT | 1.25 | 8,212.50 | 3.00 | 19,710.00 | 3.23 | 21,221.10 | 1.00 | 6,570.00 | | 0049 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 6,570 | SQFT | 1.25 | 8,212.50 | 3.00 | 19,710.00 | 3.34 | 21,943.80 | 1.00 | 6,570.00 | | 0050 | 806-01-00100 | Deformed Reinforcing Steel | 164,983 | LB | 1.60 | 263,972.80 | 1.20 | 197,979.60 | 1.50 | 247,474.50 | 3.00 | 494,949.00 | | 0051 | 807-01-00800 | Structural Metalwork (Grade A) | 428 | LUMP | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | 73,403.68 | 73,403.68 | 15,000.00 | 15,000.00 | | 0052 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 40 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 31,234.26 | 31,234.26 | 5,000.00 | 5,000.00 | | 0053 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 972 | LNFT | 140.00 | 136,080.00 | 175.00 | 170,100.00 | 213.15 | 207,181.80 | 190.00 | 184,680.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 100.00 | 320,000.00 | 126.00 | 403,200.00 | 120.52 | 385,664.00 | 120.00 | 384,000.00 | | 0055 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 547 | SFIN | 117.61 | 64,332.67 | 100.00 | 54,700.00 | 138.83 | 75,940.01 | 150.00 | 82,050.00 | | 0056 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 120 | LNFT | 500.00 | 60,000.00 | 700.00 | 84,000.00 | 359.86 | 43,183.20 | 500.00 | 60,000.00 | | 0057 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 6,000.00 | 24,000.00 | 18,000.00 | 72,000.00 | 7,511.57 | 30,046.28 | 10,000.00 | 40,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,749,129.67 | | 8,889,765.60 | | 9,481,087.87 | | 11,571,109.35 |
|