Search


Bid Tabulations for the Letting of 7/8/2026 LA DOTD Headquarters

Proposal:H.015909.6
Parish:Madison, Richland
Routes:US 80
Description:US 80: BAYOU MACON BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF STEEL I-BEAM BRIDGE, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, RIP RAP, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$9,626,971.20
Rank License BidderConstruction Bid
139462JB JAMES CONSTRUCTION LLC$8,749,129.67
212312Gilchrist Construction Company, LLC$8,889,765.60
339613Baker Pile Driving and Site Work, LLC$9,481,087.87
449239WL Bass Construction Inc.$11,571,109.35


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
JB JAMES CONSTRUCTION LLC
- 2 -
Gilchrist Construction Company, LLC
- 3 -
Baker Pile Driving and Site Work, LLC
- 4 -
WL Bass Construction Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1.08  LUMP600,000.00600,000.00900,000.00900,000.00257,040.46257,040.46130,000.00130,000.00
0002202-02-02020Removal of Asphalt Pavement 951     SQYD8.007,608.0020.0019,020.0044.5142,329.014.003,804.00
0003202-02-03030Removal of Pavement Structure 350     SQYD26.009,100.0014.004,900.0035.4012,390.005.001,750.00
0004202-02-04501Removal of Bridge (RECALL NO. 023280, 33.5' X 423.0' STEEL I-BEAM (ROLLED))14,171     LUMP1,000,000.001,000,000.00625,000.00625,000.001,054,969.631,054,969.631,313,300.001,313,300.00
0005202-02-14500Removal of Guard Rail 1,306     LNFT6.007,836.007.009,142.0097.66127,543.9611.0014,366.00
0006202-02-32000Removal of Paved Ditches 87     SQYD60.005,220.0080.006,960.0056.324,899.8410.00870.00
0007202-02-38300Removal of Sign and U-Channel Post 2     EACH50.00100.0035.0070.00228.87457.74200.00400.00
0008202-03-38000Relocation of Sign 7     EACH50.00350.0025.00175.0098.18687.261,200.008,400.00
0009203-02-00100Drainage Excavation 1,917     CUYD24.0046,008.0028.0053,676.0037.3571,599.9532.0061,344.00
0010203-05-00100Excavation and Embankment 1     LUMP55,000.0055,000.00250,000.00250,000.0056,409.2856,409.2860,000.0060,000.00
0011204-06-00100Temporary Silt Fencing 1,764     LNFT8.0014,112.003.005,292.005.379,472.683.005,292.00
0012302-02-06030Class II Base Course (6" Thick) (Asphalt Concrete Base) 413.4   SQYD90.0037,206.0075.0031,005.00208.0085,987.2090.0037,206.00
0013401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 96.6   CUYD180.0017,388.00160.0015,456.00222.0021,445.20220.0021,252.00
0014502-01-00100Asphalt Concrete 583     TON240.00139,920.00250.00145,750.00511.89298,431.87240.00139,920.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 168.7   TON275.0046,392.50250.0042,175.00513.0086,543.10275.0046,392.50
0016509-01-00100Milling Asphalt Pavement 2,134     SQYD10.0021,340.009.0019,206.0034.7774,199.1822.0046,948.00
0017510-01-00001Pavement Patching 14" Minimum Thickness36     SQYD360.0012,960.00400.0014,400.00583.9121,020.76310.0011,160.00
0018510-01-00001Pavement Patching 14.5" Minimum Thickness36     SQYD380.0013,680.00400.0014,400.00583.9121,020.76310.0011,160.00
0019511-01-00100Saw Cutting Asphalt Concrete Pavement 5,980     INLF1.257,475.003.0017,940.005.8434,923.202.5014,950.00
0020511-03-00100Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 168     LNFT50.008,400.0025.004,200.0031.365,268.485.00840.00
0021511-04-00100Sawcuts in Asphalt Concrete Lifts 280     LNFT5.001,400.0025.007,000.0015.614,370.801.00280.00
0022704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 150     LNFT50.007,500.0034.005,100.0036.865,529.0035.005,250.00
0023704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT150.0015,000.00115.0011,500.00187.2618,726.00135.0013,500.00
0024704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH3,500.0014,000.003,400.0013,600.003,820.8615,283.444,150.0016,600.00
0025711-02-00400Riprap (55 lb) 3,141     CUYD160.00502,560.00150.00471,150.00157.11493,482.51101.00317,241.00
0026711-04-00100Geotextile Fabric 1,654     SQYD8.0013,232.007.0011,578.007.4412,305.764.006,616.00
0027713-01-00100Temporary Signs and Barricades 1     LUMP100,000.00100,000.00125,000.00125,000.00274,905.31274,905.31200,000.00200,000.00
0028724-01-00100Rumble Strips (Centerline) 0.117 MILE1,400.00163.801,000.00117.004,750.00555.75350.0040.95
0029724-02-00100Rumble Strips (Shoulder/Edge) 0.234 MILE350.0081.901,000.00234.002,005.00469.17350.0081.90
0030727-01-00100Mobilization 1     LUMP850,000.00850,000.00840,000.00840,000.00857,418.55857,418.551,157,000.001,157,000.00
0031729-01-00100Sign (Type A) 15     SQFT25.00375.0035.00525.0035.87538.0550.00750.00
0032729-01-00200Mounting of Sign (Type A) 2     EACH25.0050.0015.0030.00228.87457.7450.00100.00
0033729-16-00300Object Marker Assembly (Type 3) 4     EACH95.00380.00100.00400.00234.92939.68135.00540.00
0034729-22-00200Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor 7     EACH300.002,100.00350.002,450.00224.401,570.80150.001,050.00
0035731-01-00100Nonreflectorized Raised Pavement Markers 1,363     EACH10.0013,630.0010.0013,630.0011.7416,001.6210.0013,630.00
0036731-02-00100Reflectorized Raised Pavement Markers 58     EACH25.001,450.0025.001,450.0035.002,030.0025.001,450.00
0037732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.87  MILE7,500.006,525.007,500.006,525.009,027.007,853.497,500.006,525.00
0038739-01-00100Hydro-Seeding 1.1   ACRE4,400.004,840.002,800.003,080.007,687.108,455.815,100.005,610.00
0039740-01-00100Construction Layout 1     LUMP50,000.0050,000.00200,000.00200,000.00262,261.72262,261.72150,000.00150,000.00
0040804-01-00600Precast Concrete Piles (24") 1,704     LNFT240.00408,960.00256.00436,224.00279.54476,336.16360.00613,440.00
0041804-01-00800Precast Concrete Piles (36") 1,584     LNFT420.00665,280.00485.00768,240.00582.06921,983.042,200.003,484,800.00
0042804-10-00600Precast Concrete Indicator Piles (24") 1     EACH200,000.00200,000.00200,000.00200,000.00129,580.81129,580.81150,000.00150,000.00
0043804-10-00800Precast Concrete Indicator Piles (36") 1     EACH270,000.00270,000.00200,000.00200,000.00143,203.33143,203.33250,000.00250,000.00
0044804-14-00100Dynamic Monitoring Assistance 12     EACH1,500.0018,000.007,000.0084,000.005,011.7460,140.882,500.0030,000.00
0045805-01-00200Class A1 Concrete (Deck) 554.82  CUYD1,400.00776,748.001,500.00832,230.001,531.00849,429.42350.00194,187.00
0046805-01-00300Class A1 Concrete (Bent Cap) 187.84  CUYD2,200.00413,248.002,400.00450,816.002,716.00510,173.44350.0065,744.00
0047805-08-01300Precast-Prestressed Concrete Girders (Type LG-45) 2,238     LNFT650.001,454,700.00440.00984,720.00439.30983,153.40750.001,678,500.00
0048805-18-00100Concrete Finish (Class 2 Rubbed Finish) 6,570     SQFT1.258,212.503.0019,710.003.2321,221.101.006,570.00
0049805-18-00200Concrete Finish (Class 3 Special Finish) 6,570     SQFT1.258,212.503.0019,710.003.3421,943.801.006,570.00
0050806-01-00100Deformed Reinforcing Steel 164,983     LB1.60263,972.801.20197,979.601.50247,474.503.00494,949.00
0051807-01-00800Structural Metalwork (Grade A)428     LUMP12,000.0012,000.005,000.005,000.0073,403.6873,403.6815,000.0015,000.00
0052807-02-00100Structural Metalwork (Anchor Bolts) 40     LUMP12,000.0012,000.0015,000.0015,000.0031,234.2631,234.265,000.005,000.00
0053810-01-00120Concrete Bridge Railing (36 inch Height) 972     LNFT140.00136,080.00175.00170,100.00213.15207,181.80190.00184,680.00
0054813-01-00100Concrete Approach Slabs (Cast-in-Place) 3,200     SQFT100.00320,000.00126.00403,200.00120.52385,664.00120.00384,000.00
0055814-02-00100Elastomeric Bearing Pads (Reinforced) 547     SFIN117.6164,332.67100.0054,700.00138.8375,940.01150.0082,050.00
0056815-02-00100Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) 120     LNFT500.0060,000.00700.0084,000.00359.8643,183.20500.0060,000.00
0057816-02-00100Bridge End Drain System (Open Drain) 4     EACH6,000.0024,000.0018,000.0072,000.007,511.5730,046.2810,000.0040,000.00
             
  CONTRACTOR TOTAL   8,749,129.67 8,889,765.60 9,481,087.87 11,571,109.35