Proposal:H.015816.6
Parish:Terrebonne
Routes:LA 3087
Description:LA 3087: LA 24 - INTRACOASTAL BRIDGE
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$677,258.02
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $699,198.99 |
| 2 | 62139 | Huey P. Stockstill, LLC | $779,984.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions SIGNAL POLE FOUNDATION | 1 | LUMP | 110.70 | 110.70 | 6,500.00 | 6,500.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 30 | LNFT | 65.12 | 1,953.60 | 8.00 | 240.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 480 | LNFT | 65.12 | 31,257.60 | 8.00 | 3,840.00 | | 0004 | 203-01-00100 | General Excavation | 14.9 | CUYD | 338.74 | 5,047.23 | 200.00 | 2,980.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 51 | CUYD | 194.37 | 9,912.87 | 100.00 | 5,100.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 919.1 | TON | 185.36 | 170,364.38 | 172.00 | 158,085.20 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 17.8 | TON | 261.33 | 4,651.67 | 400.00 | 7,120.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 8,063 | SQYD | 6.21 | 50,071.23 | 4.00 | 32,252.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -448 | CUYD | 0.04 | -17.92 | 0.01 | -4.48 | | 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,210 | SQYD | 120.23 | 145,478.30 | 167.00 | 202,070.00 | | 0011 | 510-05-00100 | Pavement Widening 10" THICK | 29.6 | TON | 186.36 | 5,516.26 | 250.00 | 7,400.00 | | 0012 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,360 | LNFT | 2.25 | 7,560.00 | 3.50 | 11,760.00 | | 0013 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 2,566 | LNFT | 2.25 | 5,773.50 | 3.50 | 8,981.00 | | 0014 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 5,926 | LNFT | 1.00 | 5,926.00 | 1.25 | 7,407.50 | | 0015 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 11,472.05 | 11,472.05 | 5,750.00 | 5,750.00 | | 0016 | 707-01-00100 | Concrete Curb | 472 | LNFT | 80.65 | 38,066.80 | 25.00 | 11,800.00 | | 0017 | 707-03-00100 | Combination Concrete Curb and Gutter | 170 | LNFT | 110.21 | 18,735.70 | 45.00 | 7,650.00 | | 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 68,630.60 | 68,630.60 | 165,000.00 | 165,000.00 | | 0019 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 580 | LNFT | 1.15 | 667.00 | 1.00 | 580.00 | | 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,891 | LNFT | 1.70 | 3,214.70 | 1.50 | 2,836.50 | | 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 448 | LNFT | 2.25 | 1,008.00 | 2.00 | 896.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.396 | MILE | 2.18 | 3.04 | 350.00 | 488.60 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.866 | MILE | 1,127.15 | 976.11 | 1,000.00 | 866.00 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.84 | MILE | 2,254.30 | 4,147.91 | 2,000.00 | 3,680.00 | | 0025 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 8 | EACH | 56.11 | 448.88 | 50.00 | 400.00 | | 0026 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 4 | EACH | 84.16 | 336.64 | 50.00 | 200.00 | | 0027 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 56.11 | 785.54 | 50.00 | 700.00 | | 0028 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 56.11 | 224.44 | 50.00 | 200.00 | | 0029 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 56.11 | 1,346.64 | 50.00 | 1,200.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 8,005.41 | 2,401.62 | 4,000.00 | 1,200.00 | | 0031 | 717-01-00100 | Seeding | 3 | LB | 115.32 | 345.96 | 100.00 | 300.00 | | 0032 | 718-01-00100 | Fertilizer | 145 | LB | 4.52 | 655.40 | 5.00 | 725.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 63,562.48 | 63,562.48 | 76,000.00 | 76,000.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 304 | EACH | 11.02 | 3,350.08 | 11.00 | 3,344.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 687 | LNFT | 3.91 | 2,686.17 | 4.00 | 2,748.00 | | 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 36 | LNFT | 22.04 | 793.44 | 22.00 | 792.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 188 | LNFT | 28.05 | 5,273.40 | 30.00 | 5,640.00 | | 0038 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 290 | LNFT | 2.25 | 652.50 | 2.25 | 652.50 | | 0039 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 87 | LNFT | 3.91 | 340.17 | 3.75 | 326.25 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.92 | MILE | 8,373.14 | 7,703.29 | 8,500.00 | 7,820.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.433 | MILE | 2,248.56 | 973.63 | 2,250.00 | 974.25 | | 0042 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.098 | MILE | 5,810.76 | 569.45 | 5,500.00 | 539.00 | | 0043 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 5 | EACH | 340.65 | 1,703.25 | 350.00 | 1,750.00 | | 0044 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 446.86 | 893.72 | 500.00 | 1,000.00 | | 0045 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 340.65 | 2,725.20 | 350.00 | 2,800.00 | | 0046 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 335.65 | 671.30 | 350.00 | 700.00 | | 0047 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 335.65 | 4,699.10 | 350.00 | 4,900.00 | | 0048 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 22,843.03 | 1,142.15 | 20,000.00 | 1,000.00 | | 0049 | 735-01-00100 | Mailboxes | 3 | EACH | 115.22 | 345.66 | 40.00 | 120.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 106.68 | 106.68 | 275.00 | 275.00 | | 0051 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 177.62 | 177.62 | 400.00 | 400.00 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,757.25 | 3,757.25 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 699,198.99 | | 779,984.32 |
|