Proposal:H.015803.6
Parish:Plaquemines
Routes:LA 23
Description:LA 23: 970' N FLOODWALL - JESUIT BEND
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, MILLING CONCRETE PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,133,504.60
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $4,408,385.11 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $4,565,707.33 |
| 3 | 73475 | Madden Gulf Coast, LLC | $5,564,354.29 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Boh Bros. Construction Co., LLC. | - 3 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.04 | LUMP | 5,250.00 | 5,250.00 | 6,000.00 | 6,000.00 | 5,225.00 | 5,225.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,053 | CUYD | 5.00 | 10,265.00 | 50.00 | 102,650.00 | 50.00 | 102,650.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 15,762.9 | TON | 130.35 | 2,054,694.02 | 135.00 | 2,127,991.50 | 123.00 | 1,938,836.70 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 743.3 | TON | 176.00 | 130,820.80 | 265.00 | 196,974.50 | 225.00 | 167,242.50 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 61,211 | SQYD | 4.00 | 244,844.00 | 4.00 | 244,844.00 | 4.00 | 244,844.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,286 | CUYD | 0.01 | -32.86 | 0.10 | -328.60 | 0.01 | -32.86 | | 0007 | 510-01-00001 | Pavement Patching 4" MIN THICKNESS | 309 | SQYD | 51.00 | 15,759.00 | 65.00 | 20,085.00 | 100.00 | 30,900.00 | | 0008 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 234 | SQYD | 127.00 | 29,718.00 | 175.00 | 40,950.00 | 162.00 | 37,908.00 | | 0009 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 76,818 | LNFT | 1.75 | 134,431.50 | 1.50 | 115,227.00 | 2.00 | 153,636.00 | | 0010 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 30,727 | LNFT | 1.75 | 53,772.25 | 1.50 | 46,090.50 | 2.00 | 61,454.00 | | 0011 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 107,545 | LNFT | 0.75 | 80,658.75 | 1.00 | 107,545.00 | 1.25 | 134,431.25 | | 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 18,685 | LNFT | 2.50 | 46,712.50 | 2.50 | 46,712.50 | 3.75 | 70,068.75 | | 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 22,422 | LNFT | 2.50 | 56,055.00 | 2.50 | 56,055.00 | 3.95 | 88,566.90 | | 0014 | 602-03-00100 | Cleaning and Sealing Random Cracks | 19,100 | LNFT | 3.50 | 66,850.00 | 3.75 | 71,625.00 | 3.95 | 75,445.00 | | 0015 | 602-10-00100 | Longitudinal Shoulder Joints | 37,370 | LNFT | 1.75 | 65,397.50 | 2.00 | 74,740.00 | 3.25 | 121,452.50 | | 0016 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching 9" THICK | 1,179.6 | SQYD | 530.00 | 625,188.00 | 445.00 | 524,922.00 | 800.00 | 943,680.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 362,000.00 | 362,000.00 | 225,000.00 | 225,000.00 | 545,000.00 | 545,000.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.699 | MILE | 359.29 | 3,484.75 | 400.00 | 3,879.60 | 450.00 | 4,364.55 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.699 | MILE | 750.00 | 7,274.25 | 700.00 | 6,789.30 | 700.00 | 6,789.30 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.398 | MILE | 1,250.00 | 24,247.50 | 950.00 | 18,428.10 | 1,200.00 | 23,277.60 | | 0021 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 50.00 | 200.00 | 25.00 | 100.00 | 25.00 | 100.00 | | 0022 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 50.00 | 200.00 | 25.00 | 100.00 | 25.00 | 100.00 | | 0023 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 9,000.00 | 18,000.00 | 4,500.00 | 9,000.00 | 6,000.00 | 12,000.00 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 6.3 | TON | 799.86 | 5,039.12 | 825.00 | 5,197.50 | 900.00 | 5,670.00 | | 0025 | 717-01-00100 | Seeding | 190 | LB | 12.16 | 2,310.40 | 12.50 | 2,375.00 | 10.00 | 1,900.00 | | 0026 | 718-01-00100 | Fertilizer | 3,167 | LB | 0.99 | 3,135.33 | 1.00 | 3,167.00 | 0.75 | 2,375.25 | | 0027 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.699 | MILE | 300.00 | 2,909.70 | 325.00 | 3,152.18 | 1,000.00 | 9,699.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 212,300.00 | 212,300.00 | 345,000.00 | 345,000.00 | 555,000.00 | 555,000.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 725 | EACH | 8.00 | 5,800.00 | 6.50 | 4,712.50 | 5.00 | 3,625.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 150 | LNFT | 3.50 | 525.00 | 3.00 | 450.00 | 5.00 | 750.00 | | 0031 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 361 | LNFT | 17.50 | 6,317.50 | 10.00 | 3,610.00 | 20.00 | 7,220.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.699 | MILE | 5,500.00 | 53,344.50 | 5,250.00 | 50,919.75 | 5,000.00 | 48,495.00 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.85 | MILE | 1,500.00 | 7,275.00 | 2,100.00 | 10,185.00 | 1,300.00 | 6,305.00 | | 0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.041 | MILE | 5,000.00 | 205.00 | 10,500.00 | 430.50 | 12,500.00 | 512.50 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 | 600.00 | 1,200.00 | | 0036 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 | 600.00 | 1,200.00 | | 0037 | 735-01-00100 | Mailboxes | 143 | EACH | 50.00 | 7,150.00 | 50.00 | 7,150.00 | 30.00 | 4,290.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 103 | EACH | 195.00 | 20,085.00 | 225.00 | 23,175.00 | 255.00 | 26,265.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 20 | EACH | 225.00 | 4,500.00 | 235.00 | 4,700.00 | 355.00 | 7,100.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,200.00 | 4,200.00 | 20,000.00 | 20,000.00 | 82,000.00 | 82,000.00 | | 0041 | NS-602-00001 | Milling Concrete Pavement | 1,396.1 | SQYD | 26.00 | 36,298.60 | 25.00 | 34,902.50 | 23.50 | 32,808.35 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,408,385.11 | | 4,565,707.33 | | 5,564,354.29 |
|