Proposal:H.014786.6
Parish:Washington
Routes:LA 38
Description:LA 38: TANGI PL - LA 438
Type Construction:DRAINAGE STRUCTURES, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,633,842.18
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $2,574,400.55 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,923,873.79 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 8,100.00 | 8,100.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,534 | SQYD | 2.40 | 3,681.60 | 19.50 | 29,913.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 495 | LNFT | 9.00 | 4,455.00 | 9.75 | 4,826.25 | | 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 6 | EACH | 35.00 | 210.00 | 37.75 | 226.50 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,952 | CUYD | 36.00 | 142,272.00 | 59.50 | 235,144.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 200 | LNFT | 12.00 | 2,400.00 | 20.00 | 4,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 175.00 | 1,400.00 | 175.00 | 1,400.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 41,830 | LNFT | 1.75 | 73,202.50 | 1.00 | 41,830.00 | | 0009 | 303-02-00100 | Removal of Existing Patches | 1,069 | SQYD | 7.50 | 8,017.50 | 1.00 | 1,069.00 | | 0010 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 57,986.1 | SQYD | 9.50 | 550,867.95 | 9.30 | 539,270.73 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 104 | CUYD | 62.00 | 6,448.00 | 50.00 | 5,200.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 218 | CUYD | 50.00 | 10,900.00 | 1.00 | 218.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 11,318.3 | TON | 98.00 | 1,109,193.40 | 118.00 | 1,335,559.40 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 822.3 | TON | 175.00 | 143,902.50 | 100.00 | 82,230.00 | | 0015 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 400 | INLF | 1.50 | 600.00 | 2.50 | 1,000.00 | | 0016 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 88 | LNFT | 420.00 | 36,960.00 | 640.00 | 56,320.00 | | 0017 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 44 | LNFT | 10.00 | 440.00 | 1.00 | 44.00 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 180 | LNFT | 110.00 | 19,800.00 | 119.00 | 21,420.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 156.3 | LNFT | 34.00 | 5,314.20 | 38.00 | 5,939.40 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,125.00 | 12,500.00 | 3,300.00 | 13,200.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 158,800.00 | 158,800.00 | 200,000.00 | 200,000.00 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 288 | LNFT | 0.45 | 129.60 | 0.50 | 144.00 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.88 | MILE | 450.00 | 5,346.00 | 345.00 | 4,098.60 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.885 | MILE | 1.00 | 0.89 | 863.00 | 763.76 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 46.611 | MILE | 1.00 | 46.61 | 1.00 | 46.61 | | 0026 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,500.00 | 7,000.00 | 6,500.00 | 13,000.00 | | 0027 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0028 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.63 | MILE | 1,000.00 | 7,630.00 | 323.00 | 2,464.49 | | 0029 | 726-01-00100 | Bedding Material 6" THICKNESS | 14.3 | CUYD | 130.00 | 1,859.00 | 162.00 | 2,316.60 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 170,000.00 | 170,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 80.00 | 160.00 | 86.00 | 172.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 102.00 | 408.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,085 | EACH | 4.00 | 8,340.00 | 4.35 | 9,069.75 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 96 | LNFT | 14.00 | 1,344.00 | 15.10 | 1,449.60 | | 0035 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 664 | LNFT | 2.00 | 1,328.00 | 2.20 | 1,460.80 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.537 | MILE | 4,400.00 | 68,362.80 | 4,750.00 | 73,800.75 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.295 | MILE | 1,200.00 | 354.00 | 1,300.00 | 383.50 | | 0038 | 732-05-00100 | Removal of Existing Markings | 0.008 | MILE | 25,000.00 | 200.00 | 27,000.00 | 216.00 | | 0039 | 735-01-00100 | Mailboxes | 23 | EACH | 30.00 | 690.00 | 32.35 | 744.05 | | 0040 | 735-02-00100 | Mailbox Supports (Single) | 23 | EACH | 255.00 | 5,865.00 | 275.00 | 6,325.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 5 | ACRE | 2,800.00 | 14,000.00 | 3,020.00 | 15,100.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,574,400.55 | | 2,923,873.79 |
|