Proposal:H.014112.6
Parish:Tangipahoa
Routes:LA 16
Description:LA 16: E. OF DUNCAN AVE TO LA 445
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$9,649,620.76
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $7,647,038.89 |
| 2 | 73475 | Madden Gulf Coast, LLC | $7,647,857.53 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of 4' X 2' X 2' Concrete Bridge End Block | 12 | EACH | 3,550.00 | 42,600.00 | 3,500.00 | 42,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 1,766.3 | SQYD | 6.40 | 11,304.32 | 18.00 | 31,793.40 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 122.2 | SQYD | 25.50 | 3,116.10 | 15.00 | 1,833.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,513 | LNFT | 6.60 | 9,985.80 | 6.50 | 9,834.50 | | 0005 | 203-01-00100 | General Excavation | 223.79 | CUYD | 32.50 | 7,273.18 | 20.00 | 4,475.80 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 330 | CUYD | 450.00 | 148,500.00 | 214.00 | 70,620.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 2,465.3 | LNFT | 2.00 | 4,930.60 | 2.50 | 6,163.25 | | 0008 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 300 | CUYD | 1.00 | 300.00 | 50.00 | 15,000.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 42,776.3 | TON | 114.00 | 4,876,498.20 | 100.00 | 4,277,630.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,236.9 | TON | 265.00 | 327,778.50 | 238.00 | 294,382.20 | | 0011 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 130,711 | GAL | 2.55 | 333,313.05 | 4.30 | 562,057.30 | | 0012 | 507-02-00200 | Aggregate (S2) | 192,222 | SQYD | 1.25 | 240,277.50 | 2.13 | 409,432.86 | | 0013 | 507-02-00300 | Aggregate (S3) | 192,222 | SQYD | 1.00 | 192,222.00 | 1.67 | 321,010.74 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 198,949 | SQYD | 1.85 | 368,055.65 | 1.80 | 358,108.20 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -8,372 | CUYD | 0.01 | -83.72 | 0.01 | -83.72 | | 0016 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 1,164 | SQYD | 71.00 | 82,644.00 | 95.50 | 111,162.00 | | 0017 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 975 | SQYD | 143.00 | 139,425.00 | 169.00 | 164,775.00 | | 0018 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 1,554 | INLF | 1.50 | 2,331.00 | 1.80 | 2,797.20 | | 0019 | 704-03-00100 | Blocked Out Guard rail | 93.9 | LNFT | 34.00 | 3,192.60 | 34.00 | 3,192.60 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 493.9 | LNFT | 34.00 | 16,792.60 | 34.00 | 16,792.60 | | 0021 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 18.9 | LNFT | 190.00 | 3,591.00 | 190.00 | 3,591.00 | | 0022 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 150 | LNFT | 50.00 | 7,500.00 | 50.00 | 7,500.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 118.00 | 35,400.00 | 118.00 | 35,400.00 | | 0024 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,200.00 | 3,200.00 | 3,200.00 | 3,200.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,100.00 | 24,800.00 | 3,100.00 | 24,800.00 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 122.2 | SQYD | 120.00 | 14,664.00 | 110.00 | 13,442.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 220,000.00 | 220,000.00 | 221,000.00 | 221,000.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 480 | LNFT | 0.46 | 220.80 | 0.45 | 216.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.77 | MILE | 323.00 | 2,832.71 | 450.00 | 3,946.50 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.84 | MILE | 810.00 | 51,710.40 | 800.00 | 51,072.00 | | 0031 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 25.00 | 100.00 | 25.00 | 100.00 | | 0032 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 9,100.00 | 18,200.00 | 6,000.00 | 12,000.00 | | 0034 | 724-01-00100 | Rumble Strips (Centerline) | 7.875 | MILE | 300.00 | 2,362.50 | 1,000.00 | 7,875.00 | | 0035 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.648 | MILE | 300.00 | 4,694.40 | 1,000.00 | 15,648.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 185,000.00 | 185,000.00 | 280,000.00 | 280,000.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 13 | EACH | 96.00 | 1,248.00 | 95.00 | 1,235.00 | | 0038 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,713 | EACH | 9.00 | 15,417.00 | 9.00 | 15,417.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,277 | EACH | 4.00 | 9,108.00 | 4.00 | 9,108.00 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 140 | LNFT | 5.00 | 700.00 | 5.00 | 700.00 | | 0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 681.5 | LNFT | 15.00 | 10,222.50 | 15.00 | 10,222.50 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 240 | LNFT | 15.00 | 3,600.00 | 15.00 | 3,600.00 | | 0043 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 1,232 | LNFT | 2.05 | 2,525.60 | 2.00 | 2,464.00 | | 0044 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 280 | LNFT | 4.05 | 1,134.00 | 4.00 | 1,120.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 31.92 | MILE | 4,400.00 | 140,448.00 | 4,400.00 | 140,448.00 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.933 | MILE | 1,215.00 | 1,133.60 | 1,200.00 | 1,119.60 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 455.00 | 910.00 | 450.00 | 900.00 | | 0048 | 735-01-00100 | Mailboxes | 211 | EACH | 35.00 | 7,385.00 | 1.00 | 211.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 211 | EACH | 225.00 | 47,475.00 | 245.00 | 51,695.00 | | 0050 | 739-01-00100 | Hydro-Seeding | 3 | ACRE | 4,500.00 | 13,500.00 | 2,950.00 | 8,850.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 18,000.00 | 18,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,647,038.89 | | 7,647,857.53 |
|