Proposal:H.012048.6
Parish:LaSalle, Winn
Routes:US 84
Description:US 84: CASTOR CREEK AND RELIEF BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF I-BEAM BRIDGES, GRADING, DRAINAGE STRUCTURES, MILLING OF ASPHALT AND CONCRETE PAVEMENTS, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, DRILLED SHAFTS, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$31,579,879.03
| Rank | License | Bidder | Construction Bid |
| 1 | 79463 | Denley Brown Contractors, LLC | $26,892,918.56 |
| 2 | 49239 | WL Bass Construction Inc. | $26,936,199.70 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $27,464,894.91 |
| 4 | 12312 | Gilchrist Construction Company, LLC | $28,684,566.60 |
| 5 | 27239 | Apeck Construction, LLC | $35,998,403.83 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Denley Brown Contractors, LLC | - 2 - WL Bass Construction Inc. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 26 | LUMP | 2,750,000.00 | 2,750,000.00 | 125,000.00 | 125,000.00 | 420,000.00 | 420,000.00 | 800,000.00 | 800,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 45,000.00 | 45,000.00 | 5,000.00 | 5,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,591 | SQYD | 5.00 | 22,955.00 | 3.00 | 13,773.00 | 10.00 | 45,910.00 | 10.00 | 45,910.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 10,525 | SQYD | 14.00 | 147,350.00 | 3.00 | 31,575.00 | 14.00 | 147,350.00 | 20.00 | 210,500.00 | | 0005 | 202-02-04501 | Removal of Bridge (28' x 423' WELDED I-BEAM WITH COMPOSITE DECK BRIDGE) | 14,644 | LUMP | 200,000.00 | 200,000.00 | 300,200.00 | 300,200.00 | 140,000.00 | 140,000.00 | 125,000.00 | 125,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (28' x 483' STEEL I-BEAM (ROLLED) BRIDGE) | 13,524 | LUMP | 235,000.00 | 235,000.00 | 314,500.00 | 314,500.00 | 160,000.00 | 160,000.00 | 125,000.00 | 125,000.00 | | 0007 | 202-02-12000 | Removal of Fence BARBED WIRE FENCE | 889 | LNFT | 5.00 | 4,445.00 | 2.00 | 1,778.00 | 5.00 | 4,445.00 | 6.00 | 5,334.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 956 | LNFT | 5.00 | 4,780.00 | 2.00 | 1,912.00 | 4.50 | 4,302.00 | 11.00 | 10,516.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 2,753.6 | LNFT | 8.00 | 22,028.80 | 8.00 | 22,028.80 | 8.00 | 22,028.80 | 7.00 | 19,275.20 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 32 | EACH | 45.00 | 1,440.00 | 300.00 | 9,600.00 | 100.00 | 3,200.00 | 35.00 | 1,120.00 | | 0011 | 202-08-00100 | Removal of Debris (Bird Maintenance) | 1 | LUMP | 50,000.00 | 50,000.00 | 7,000.00 | 7,000.00 | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | | 0012 | 203-01-00100 | General Excavation | 12,115 | CUYD | 10.00 | 121,150.00 | 12.00 | 145,380.00 | 20.00 | 242,300.00 | 15.00 | 181,725.00 | | 0013 | 203-02-00100 | Drainage Excavation | 6,152 | CUYD | 14.00 | 86,128.00 | 32.00 | 196,864.00 | 20.00 | 123,040.00 | 20.00 | 123,040.00 | | 0014 | 203-03-00100 | Embankment | 87,299 | CUYD | 16.00 | 1,396,784.00 | 21.00 | 1,833,279.00 | 24.00 | 2,095,176.00 | 29.00 | 2,531,671.00 | | 0015 | 203-11-00100 | Settlement Plate Installation and Monitoring | 11 | EACH | 4,000.00 | 44,000.00 | 1,100.00 | 12,100.00 | 1,600.00 | 17,600.00 | 1,800.00 | 19,800.00 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 160.00 | 1,760.00 | 125.00 | 1,375.00 | 160.00 | 1,760.00 | 160.00 | 1,760.00 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 9,893 | LNFT | 2.50 | 24,732.50 | 3.00 | 29,679.00 | 5.00 | 49,465.00 | 3.00 | 29,679.00 | | 0018 | 301-05-00100 | Base Drain Outlet | 22 | EACH | 1,000.00 | 22,000.00 | 2,000.00 | 44,000.00 | 1,400.00 | 30,800.00 | 1,600.00 | 35,200.00 | | 0019 | 302-02-06070 | Class II Base Course (6" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,589 | SQYD | 30.00 | 77,670.00 | 40.00 | 103,560.00 | 28.00 | 72,492.00 | 54.00 | 139,806.00 | | 0020 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 13,289.4 | SQYD | 50.00 | 664,470.00 | 70.00 | 930,258.00 | 48.00 | 637,891.20 | 54.00 | 717,627.60 | | 0021 | 304-01-00100 | Lime | 206.72 | TON | 375.00 | 77,520.00 | 460.00 | 95,091.20 | 400.00 | 82,688.00 | 340.00 | 70,284.80 | | 0022 | 304-05-00100 | Lime Treatment (Type E) | 15,879 | SQYD | 5.00 | 79,395.00 | 7.00 | 111,153.00 | 8.00 | 127,032.00 | 4.00 | 63,516.00 | | 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 116.5 | CUYD | 100.00 | 11,650.00 | 220.00 | 25,630.00 | 100.00 | 11,650.00 | 175.00 | 20,387.50 | | 0024 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 623.4 | CUYD | 100.00 | 62,340.00 | 120.00 | 74,808.00 | 100.00 | 62,340.00 | 100.00 | 62,340.00 | | 0025 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 14,012.286 | SQYD | 1.00 | 14,012.29 | 35.00 | 490,430.01 | 40.00 | 560,491.44 | 25.00 | 350,307.15 | | 0026 | 502-01-00100 | Asphalt Concrete | 4,378.2 | TON | 210.00 | 919,422.00 | 275.00 | 1,204,005.00 | 210.00 | 919,422.00 | 170.00 | 744,294.00 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 383.5 | TON | 275.00 | 105,462.50 | 320.00 | 122,720.00 | 275.00 | 105,462.50 | 350.00 | 134,225.00 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 439 | SQYD | 20.00 | 8,780.00 | 35.00 | 15,365.00 | 12.00 | 5,268.00 | 30.00 | 13,170.00 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -18.3 | CUYD | 0.01 | -0.18 | 1.00 | -18.30 | 0.01 | -0.18 | 1.00 | -18.30 | | 0030 | 510-01-00001 | Pavement Patching (13.5" Minimum Thickness) | 204 | SQYD | 240.00 | 48,960.00 | 250.00 | 51,000.00 | 265.00 | 54,060.00 | 190.00 | 38,760.00 | | 0031 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,730 | INLF | 1.00 | 1,730.00 | 1.00 | 1,730.00 | 1.00 | 1,730.00 | 3.00 | 5,190.00 | | 0032 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 480 | LNFT | 15.00 | 7,200.00 | 4.00 | 1,920.00 | 15.00 | 7,200.00 | 12.00 | 5,760.00 | | 0033 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 800 | LNFT | 1.60 | 1,280.00 | 2.00 | 1,600.00 | 1.50 | 1,200.00 | 6.00 | 4,800.00 | | 0034 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 14,940 | INLF | 1.60 | 23,904.00 | 4.00 | 59,760.00 | 1.50 | 22,410.00 | 2.00 | 29,880.00 | | 0035 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 76 | LNFT | 95.00 | 7,220.00 | 95.00 | 7,220.00 | 115.00 | 8,740.00 | 200.00 | 15,200.00 | | 0036 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 76 | LNFT | 120.00 | 9,120.00 | 120.00 | 9,120.00 | 120.00 | 9,120.00 | 205.00 | 15,580.00 | | 0037 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 76 | LNFT | 140.00 | 10,640.00 | 190.00 | 14,440.00 | 160.00 | 12,160.00 | 210.00 | 15,960.00 | | 0038 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 42 | LNFT | 170.00 | 7,140.00 | 250.00 | 10,500.00 | 190.00 | 7,980.00 | 300.00 | 12,600.00 | | 0040 | 701-06-00180 | Side Drain Pipe Arch (72" Equiv. RCPA) | 40 | LNFT | 800.00 | 32,000.00 | 700.00 | 28,000.00 | 820.00 | 32,800.00 | 650.00 | 26,000.00 | | 0041 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 950.00 | 49,400.00 | 300.00 | 15,600.00 | 550.00 | 28,600.00 | 310.00 | 16,120.00 | | 0042 | 701-10-01180 | Reinforced Concrete Pipe (Extension) (60") | 30 | LNFT | 1,000.00 | 30,000.00 | 500.00 | 15,000.00 | 1,000.00 | 30,000.00 | 450.00 | 13,500.00 | | 0043 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 | | 0044 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,500.00 | 6,500.00 | 4,000.00 | 4,000.00 | 6,500.00 | 6,500.00 | 9,000.00 | 9,000.00 | | 0045 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 200 | LNFT | 35.00 | 7,000.00 | 38.00 | 7,600.00 | 34.00 | 6,800.00 | 34.00 | 6,800.00 | | 0046 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 150.00 | 30,000.00 | 120.00 | 24,000.00 | 120.00 | 24,000.00 | | 0047 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,800.00 | 30,400.00 | 4,200.00 | 33,600.00 | 3,100.00 | 24,800.00 | 3,200.00 | 25,600.00 | | 0048 | 705-01-00100 | Barbed Wire Fence | 889 | LNFT | 15.00 | 13,335.00 | 15.00 | 13,335.00 | 15.00 | 13,335.00 | 15.00 | 13,335.00 | | 0049 | 705-04-00100 | Single Swinging Driveway Gates | 3 | EACH | 1,500.00 | 4,500.00 | 1,500.00 | 4,500.00 | 2,000.00 | 6,000.00 | 2,500.00 | 7,500.00 | | 0050 | 706-02-00200 | Concrete Drive (6" Thick) | 394.3 | SQYD | 90.00 | 35,487.00 | 130.00 | 51,259.00 | 115.00 | 45,344.50 | 130.00 | 51,259.00 | | 0051 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 720.00 | 9,360.00 | 200.00 | 2,600.00 | 700.00 | 9,100.00 | 725.00 | 9,425.00 | | 0052 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 200.00 | 2,600.00 | 300.00 | 3,900.00 | 200.00 | 2,600.00 | 225.00 | 2,925.00 | | 0053 | 711-02-00400 | Riprap (55 lb) | 3,870 | CUYD | 85.00 | 328,950.00 | 82.00 | 317,340.00 | 150.00 | 580,500.00 | 120.00 | 464,400.00 | | 0054 | 711-04-00100 | Geotextile Fabric | 7,739 | SQYD | 3.00 | 23,217.00 | 3.00 | 23,217.00 | 3.00 | 23,217.00 | 4.00 | 30,956.00 | | 0055 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 170,000.00 | 170,000.00 | 125,000.00 | 125,000.00 | 255,000.00 | 255,000.00 | 332,500.00 | 332,500.00 | | 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.3 | MILE | 1,100.00 | 330.00 | 10,000.00 | 3,000.00 | 1,100.00 | 330.00 | 1,200.00 | 360.00 | | 0057 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 9 | EACH | 25.00 | 225.00 | 20.00 | 180.00 | 25.00 | 225.00 | 9.00 | 81.00 | | 0058 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 29 | EACH | 1,100.00 | 31,900.00 | 600.00 | 17,400.00 | 2,500.00 | 72,500.00 | 1,000.00 | 29,000.00 | | 0059 | 716-01-00100 | Mulch (Vegetative) | 44 | TON | 470.00 | 20,680.00 | 750.00 | 33,000.00 | 470.00 | 20,680.00 | 500.00 | 22,000.00 | | 0060 | 717-01-00100 | Seeding | 660 | LB | 11.00 | 7,260.00 | 10.00 | 6,600.00 | 10.00 | 6,600.00 | 11.00 | 7,260.00 | | 0061 | 718-01-00100 | Fertilizer | 22,000 | LB | 1.00 | 22,000.00 | 1.00 | 22,000.00 | 1.00 | 22,000.00 | 1.00 | 22,000.00 | | 0062 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,130 | SQYD | 1.50 | 4,695.00 | 2.00 | 6,260.00 | 1.50 | 4,695.00 | 1.50 | 4,695.00 | | 0063 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,029 | SQYD | 1.50 | 1,543.50 | 2.00 | 2,058.00 | 1.50 | 1,543.50 | 1.50 | 1,543.50 | | 0064 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 200,000.00 | 200,000.00 | | 0065 | 724-01-00100 | Rumble Strips (Centerline) | 0.321 | MILE | 500.00 | 160.50 | 3,500.00 | 1,123.50 | 350.00 | 112.35 | 1,000.00 | 321.00 | | 0066 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.422 | MILE | 500.00 | 711.00 | 3,500.00 | 4,977.00 | 350.00 | 497.70 | 1,000.00 | 1,422.00 | | 0067 | 726-01-00100 | Bedding Material | 29.6 | CUYD | 120.00 | 3,552.00 | 220.00 | 6,512.00 | 100.00 | 2,960.00 | 160.00 | 4,736.00 | | 0068 | 727-01-00100 | Mobilization | 1 | LUMP | 2,625,000.00 | 2,625,000.00 | 2,693,600.00 | 2,693,600.00 | 2,700,000.00 | 2,700,000.00 | 2,700,000.00 | 2,700,000.00 | | 0069 | 729-01-00100 | Sign (Type A) | 129.5 | SQFT | 45.00 | 5,827.50 | 20.00 | 2,590.00 | 25.00 | 3,237.50 | 35.00 | 4,532.50 | | 0070 | 729-01-00200 | Mounting of Sign (Type A) | 20 | EACH | 40.00 | 800.00 | 20.00 | 400.00 | 100.00 | 2,000.00 | 15.00 | 300.00 | | 0071 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 130.00 | 1,040.00 | 150.00 | 1,200.00 | 100.00 | 800.00 | 100.00 | 800.00 | | 0072 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 20 | EACH | 150.00 | 3,000.00 | 175.00 | 3,500.00 | 200.00 | 4,000.00 | 250.00 | 5,000.00 | | 0073 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,180 | EACH | 8.00 | 25,440.00 | 10.00 | 31,800.00 | 8.00 | 25,440.00 | 8.00 | 25,440.00 | | 0074 | 731-02-00100 | Reflectorized Raised Pavement Markers | 42 | EACH | 6.00 | 252.00 | 25.00 | 1,050.00 | 6.00 | 252.00 | 6.00 | 252.00 | | 0075 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.422 | MILE | 6,000.00 | 8,532.00 | 10,000.00 | 14,220.00 | 6,000.00 | 8,532.00 | 6,000.00 | 8,532.00 | | 0076 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.711 | MILE | 3,100.00 | 2,204.10 | 12,000.00 | 8,532.00 | 3,000.00 | 2,133.00 | 3,000.00 | 2,133.00 | | 0077 | 735-01-00100 | Mailboxes | 2 | EACH | 10.00 | 20.00 | 10.00 | 20.00 | 30.00 | 60.00 | 25.00 | 50.00 | | 0078 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 250.00 | 500.00 | 260.00 | 520.00 | 275.00 | 550.00 | | 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 360,000.00 | 360,000.00 | 130,000.00 | 130,000.00 | 250,000.00 | 250,000.00 | 165,000.00 | 165,000.00 | | 0080 | 802-03-00100 | Temporary Sheeting (Steel) | 14,820 | SQFT | 49.00 | 726,180.00 | 38.00 | 563,160.00 | 50.00 | 741,000.00 | 50.00 | 741,000.00 | | 0081 | 803-01-00200 | Drilled Shaft (24" Diameter) | 240 | LNFT | 300.00 | 72,000.00 | 690.00 | 165,600.00 | 400.00 | 96,000.00 | 500.00 | 120,000.00 | | 0082 | 803-01-00500 | Drilled Shaft (42" Diameter) | 1,344 | LNFT | 1,000.00 | 1,344,000.00 | 990.00 | 1,330,560.00 | 850.00 | 1,142,400.00 | 900.00 | 1,209,600.00 | | 0083 | 803-01-00800 | Drilled Shaft (60" Diameter) | 2,763 | LNFT | 1,600.00 | 4,420,800.00 | 1,900.00 | 5,249,700.00 | 1,450.00 | 4,006,350.00 | 1,600.00 | 4,420,800.00 | | 0084 | 803-02-00500 | Test Shaft (42" Diameter) | 111 | LNFT | 1,600.00 | 177,600.00 | 1,700.00 | 188,700.00 | 1,400.00 | 155,400.00 | 2,000.00 | 222,000.00 | | 0085 | 803-02-00800 | Test Shaft (60" Diameter) | 98 | LNFT | 2,300.00 | 225,400.00 | 3,100.00 | 303,800.00 | 2,300.00 | 225,400.00 | 2,500.00 | 245,000.00 | | 0086 | 803-07-00500 | Bi-Directional Load Cell Test (42" Diameter) | 1 | EACH | 75,000.00 | 75,000.00 | 125,000.00 | 125,000.00 | 60,000.00 | 60,000.00 | 72,000.00 | 72,000.00 | | 0087 | 803-07-00800 | Bi-Directional Load Cell Test (60" Diameter) | 1 | EACH | 90,000.00 | 90,000.00 | 125,000.00 | 125,000.00 | 60,000.00 | 60,000.00 | 72,000.00 | 72,000.00 | | 0088 | 803-08-00500 | Crosshole Sonic Log Test (42" Diameter) | 13 | EACH | 3,300.00 | 42,900.00 | 12,700.00 | 165,100.00 | 10,000.00 | 130,000.00 | 12,000.00 | 156,000.00 | | 0089 | 803-08-00800 | Crosshole Sonic Log Test (60" Diameter) | 31 | EACH | 3,500.00 | 108,500.00 | 12,900.00 | 399,900.00 | 12,000.00 | 372,000.00 | 15,000.00 | 465,000.00 | | 0090 | 803-09-00500 | Non-Destructive Test (42" Diameter) (Thermal Integrity Profiling) | 13 | EACH | 4,500.00 | 58,500.00 | 3,200.00 | 41,600.00 | 2,400.00 | 31,200.00 | 2,500.00 | 32,500.00 | | 0091 | 803-09-00800 | Non-Destructive Test (60" Diameter) (Thermal Integrity Profiling) | 31 | EACH | 5,000.00 | 155,000.00 | 3,400.00 | 105,400.00 | 2,600.00 | 80,600.00 | 2,600.00 | 80,600.00 | | 0092 | 803-10-00800 | Permanent Casing (60" Diameter) | 570 | LNFT | 390.00 | 222,300.00 | 770.00 | 438,900.00 | 600.00 | 342,000.00 | 1,000.00 | 570,000.00 | | 0093 | 805-01-00200 | Class A1 Concrete (Deck) | 787.63 | CUYD | 1,300.00 | 1,023,919.00 | 350.00 | 275,670.50 | 1,400.00 | 1,102,682.00 | 1,400.00 | 1,102,682.00 | | 0094 | 805-01-00200 | Class A1 Concrete (Deck) (Internally Cured Concrete) | 651.65 | CUYD | 1,450.00 | 944,892.50 | 350.00 | 228,077.50 | 1,600.00 | 1,042,640.00 | 1,400.00 | 912,310.00 | | 0095 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 357.32 | CUYD | 1,650.00 | 589,578.00 | 350.00 | 125,062.00 | 1,950.00 | 696,774.00 | 1,700.00 | 607,444.00 | | 0096 | 805-01-00400 | Class A1 Concrete (Column) | 163.6 | CUYD | 1,450.00 | 237,220.00 | 350.00 | 57,260.00 | 1,900.00 | 310,840.00 | 1,600.00 | 261,760.00 | | 0097 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 166.98 | CUYD | 2,000.00 | 333,960.00 | 350.00 | 58,443.00 | 2,200.00 | 367,356.00 | 1,500.00 | 250,470.00 | | 0098 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 4,175 | LNFT | 390.00 | 1,628,250.00 | 545.00 | 2,275,375.00 | 570.00 | 2,379,750.00 | 400.00 | 1,670,000.00 | | 0099 | 805-08-01600 | Precast-Prestressed Concrete Girders (Type LG-72) | 1,674 | LNFT | 430.00 | 719,820.00 | 600.00 | 1,004,400.00 | 570.00 | 954,180.00 | 425.00 | 711,450.00 | | 0100 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 4' X 3' | 20 | LNFT | 800.00 | 16,000.00 | 1,700.00 | 34,000.00 | 2,000.00 | 40,000.00 | 2,000.00 | 40,000.00 | | 0101 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (QTY: STEEL 300 LBS CONCRETE 4 CU YDS) | 1 | EACH | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | | 0102 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 16,098 | SQFT | 2.00 | 32,196.00 | 1.00 | 16,098.00 | 1.30 | 20,927.40 | 3.00 | 48,294.00 | | 0103 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 16,098 | SQFT | 2.50 | 40,245.00 | 1.00 | 16,098.00 | 1.50 | 24,147.00 | 3.00 | 48,294.00 | | 0104 | 806-01-00100 | Deformed Reinforcing Steel | 491,259 | LB | 1.45 | 712,325.55 | 3.60 | 1,768,532.40 | 1.80 | 884,266.20 | 1.35 | 663,199.65 | | 0105 | 807-01-00100 | Structural Metalwork (Grade 36) | 1,071 | LUMP | 7,000.00 | 7,000.00 | 25,000.00 | 25,000.00 | 28,000.00 | 28,000.00 | 5,000.00 | 5,000.00 | | 0106 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 72 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | | 0107 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 2,384 | LNFT | 180.00 | 429,120.00 | 200.00 | 476,800.00 | 150.00 | 357,600.00 | 170.00 | 405,280.00 | | 0108 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 6,400 | SQFT | 110.00 | 704,000.00 | 135.00 | 864,000.00 | 120.00 | 768,000.00 | 130.00 | 832,000.00 | | 0109 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,257 | SFIN | 110.00 | 138,270.00 | 162.37 | 204,099.09 | 100.00 | 125,700.00 | 85.00 | 106,845.00 | | 0110 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 320 | LNFT | 350.00 | 112,000.00 | 110.00 | 35,200.00 | 450.00 | 144,000.00 | 4,090.00 | 1,308,800.00 | | 0111 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 10,000.00 | 40,000.00 | 10,000.00 | 40,000.00 | 10,000.00 | 40,000.00 | 18,000.00 | 72,000.00 | | 0112 | NS-602-00001 | Milling Concrete Pavement | 2,057 | SQYD | 36.00 | 74,052.00 | 15.00 | 30,855.00 | 22.00 | 45,254.00 | 30.00 | 61,710.00 | | 0113 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 6 | EACH | 13,000.00 | 78,000.00 | 10,000.00 | 60,000.00 | 9,500.00 | 57,000.00 | 10,000.00 | 60,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 26,892,918.56 | | 26,936,199.70 | | 27,464,894.91 | | 28,684,566.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Apeck Construction, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 26 | LUMP | 1,884,711.17 | 1,884,711.17 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,996.20 | 35,996.20 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,591 | SQYD | 14.74 | 67,671.34 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 10,525 | SQYD | 26.54 | 279,333.50 | | 0005 | 202-02-04501 | Removal of Bridge (28' x 423' WELDED I-BEAM WITH COMPOSITE DECK BRIDGE) | 14,644 | LUMP | 1,008,493.70 | 1,008,493.70 | | 0006 | 202-02-04501 | Removal of Bridge (28' x 483' STEEL I-BEAM (ROLLED) BRIDGE) | 13,524 | LUMP | 1,008,493.70 | 1,008,493.70 | | 0007 | 202-02-12000 | Removal of Fence BARBED WIRE FENCE | 889 | LNFT | 8.97 | 7,974.33 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 956 | LNFT | 8.97 | 8,575.32 | | 0009 | 202-02-14500 | Removal of Guard Rail | 2,753.6 | LNFT | 17.38 | 47,857.57 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 32 | EACH | 60.56 | 1,937.92 | | 0011 | 202-08-00100 | Removal of Debris (Bird Maintenance) | 1 | LUMP | 18,539.10 | 18,539.10 | | 0012 | 203-01-00100 | General Excavation | 12,115 | CUYD | 19.22 | 232,850.30 | | 0013 | 203-02-00100 | Drainage Excavation | 6,152 | CUYD | 38.45 | 236,544.40 | | 0014 | 203-03-00100 | Embankment | 87,299 | CUYD | 23.29 | 2,033,193.71 | | 0015 | 203-11-00100 | Settlement Plate Installation and Monitoring | 11 | EACH | 2,422.54 | 26,647.94 | | 0016 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 211.97 | 2,331.67 | | 0017 | 204-06-00100 | Temporary Silt Fencing | 9,893 | LNFT | 3.63 | 35,911.59 | | 0018 | 301-05-00100 | Base Drain Outlet | 22 | EACH | 3,576.51 | 78,683.22 | | 0019 | 302-02-06070 | Class II Base Course (6" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 2,589 | SQYD | 34.74 | 89,941.86 | | 0020 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 13,289.4 | SQYD | 57.15 | 759,489.21 | | 0021 | 304-01-00100 | Lime | 206.72 | TON | 519.07 | 107,302.15 | | 0022 | 304-05-00100 | Lime Treatment (Type E) | 15,879 | SQYD | 4.23 | 67,168.17 | | 0023 | 401-01-00100 | Aggregate Surface Course (Net Section) | 116.5 | CUYD | 155.96 | 18,169.34 | | 0024 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 623.4 | CUYD | 155.96 | 97,225.46 | | 0025 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 14,012.286 | SQYD | 50.31 | 704,958.11 | | 0026 | 502-01-00100 | Asphalt Concrete | 4,378.2 | TON | 197.64 | 865,307.45 | | 0027 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 383.5 | TON | 222.78 | 85,436.13 | | 0028 | 509-01-00100 | Milling Asphalt Pavement | 439 | SQYD | 7.57 | 3,323.23 | | 0029 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -18.3 | CUYD | 0.01 | -0.18 | | 0030 | 510-01-00001 | Pavement Patching (13.5" Minimum Thickness) | 204 | SQYD | 218.03 | 44,478.12 | | 0031 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,730 | INLF | 5.12 | 8,857.60 | | 0032 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 480 | LNFT | 18.46 | 8,860.80 | | 0033 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 800 | LNFT | 16.61 | 13,288.00 | | 0034 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 14,940 | INLF | 1.83 | 27,340.20 | | 0035 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 76 | LNFT | 105.37 | 8,008.12 | | 0036 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 76 | LNFT | 126.41 | 9,607.16 | | 0037 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 76 | LNFT | 146.04 | 11,099.04 | | 0038 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 42 | LNFT | 169.22 | 7,107.24 | | 0040 | 701-06-00180 | Side Drain Pipe Arch (72" Equiv. RCPA) | 40 | LNFT | 628.13 | 25,125.20 | | 0041 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 52 | LNFT | 227.51 | 11,830.52 | | 0042 | 701-10-01180 | Reinforced Concrete Pipe (Extension) (60") | 30 | LNFT | 479.38 | 14,381.40 | | 0043 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,883.50 | 5,767.00 | | 0044 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,304.80 | 6,304.80 | | 0045 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 200 | LNFT | 42.39 | 8,478.00 | | 0046 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 181.69 | 36,338.00 | | 0047 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 4,239.45 | 33,915.60 | | 0048 | 705-01-00100 | Barbed Wire Fence | 889 | LNFT | 19.38 | 17,228.82 | | 0049 | 705-04-00100 | Single Swinging Driveway Gates | 3 | EACH | 1,816.91 | 5,450.73 | | 0050 | 706-02-00200 | Concrete Drive (6" Thick) | 394.3 | SQYD | 120.39 | 47,469.78 | | 0051 | 708-01-00100 | Right-of-Way Monument | 13 | EACH | 1,332.40 | 17,321.20 | | 0052 | 708-02-00100 | Right-of-Way Monument Witness Post | 13 | EACH | 1,332.40 | 17,321.20 | | 0053 | 711-02-00400 | Riprap (55 lb) | 3,870 | CUYD | 140.95 | 545,476.50 | | 0054 | 711-04-00100 | Geotextile Fabric | 7,739 | SQYD | 1.95 | 15,091.05 | | 0055 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 72,676.23 | 72,676.23 | | 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.3 | MILE | 1,332.40 | 399.72 | | 0057 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 9 | EACH | 30.28 | 272.52 | | 0058 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 29 | EACH | 1,826.16 | 52,958.64 | | 0059 | 716-01-00100 | Mulch (Vegetative) | 44 | TON | 969.02 | 42,636.88 | | 0060 | 717-01-00100 | Seeding | 660 | LB | 30.28 | 19,984.80 | | 0061 | 718-01-00100 | Fertilizer | 22,000 | LB | 0.79 | 17,380.00 | | 0062 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 3,130 | SQYD | 2.42 | 7,574.60 | | 0063 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,029 | SQYD | 2.73 | 2,809.17 | | 0064 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 1,565,334.79 | 1,565,334.79 | | 0065 | 724-01-00100 | Rumble Strips (Centerline) | 0.321 | MILE | 1,328.26 | 426.37 | | 0066 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.422 | MILE | 1,330.52 | 1,892.00 | | 0067 | 726-01-00100 | Bedding Material | 29.6 | CUYD | 147.32 | 4,360.67 | | 0068 | 727-01-00100 | Mobilization | 1 | LUMP | 439,538.37 | 439,538.37 | | 0069 | 729-01-00100 | Sign (Type A) | 129.5 | SQFT | 30.28 | 3,921.26 | | 0070 | 729-01-00200 | Mounting of Sign (Type A) | 20 | EACH | 30.28 | 605.60 | | 0071 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 947.82 | 7,582.56 | | 0072 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 20 | EACH | 181.69 | 3,633.80 | | 0073 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,180 | EACH | 9.69 | 30,814.20 | | 0074 | 731-02-00100 | Reflectorized Raised Pavement Markers | 42 | EACH | 7.27 | 305.34 | | 0075 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.422 | MILE | 7,257.40 | 10,320.02 | | 0076 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.711 | MILE | 3,749.66 | 2,666.01 | | 0077 | 735-01-00100 | Mailboxes | 2 | EACH | 31.50 | 63.00 | | 0078 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 266.48 | 532.96 | | 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 107,582.74 | 107,582.74 | | 0080 | 802-03-00100 | Temporary Sheeting (Steel) | 14,820 | SQFT | 52.81 | 782,644.20 | | 0081 | 803-01-00200 | Drilled Shaft (24" Diameter) | 240 | LNFT | 569.83 | 136,759.20 | | 0082 | 803-01-00500 | Drilled Shaft (42" Diameter) | 1,344 | LNFT | 929.99 | 1,249,906.56 | | 0083 | 803-01-00800 | Drilled Shaft (60" Diameter) | 2,763 | LNFT | 1,809.35 | 4,999,234.05 | | 0084 | 803-02-00500 | Test Shaft (42" Diameter) | 111 | LNFT | 1,571.62 | 174,449.82 | | 0085 | 803-02-00800 | Test Shaft (60" Diameter) | 98 | LNFT | 2,345.95 | 229,903.10 | | 0086 | 803-07-00500 | Bi-Directional Load Cell Test (42" Diameter) | 1 | EACH | 93,267.82 | 93,267.82 | | 0087 | 803-07-00800 | Bi-Directional Load Cell Test (60" Diameter) | 1 | EACH | 93,267.82 | 93,267.82 | | 0088 | 803-08-00500 | Crosshole Sonic Log Test (42" Diameter) | 13 | EACH | 4,360.57 | 56,687.41 | | 0089 | 803-08-00800 | Crosshole Sonic Log Test (60" Diameter) | 31 | EACH | 5,087.34 | 157,707.54 | | 0090 | 803-09-00500 | Non-Destructive Test (42" Diameter) (Thermal Integrity Profiling) | 13 | EACH | 2,910.68 | 37,838.84 | | 0091 | 803-09-00800 | Non-Destructive Test (60" Diameter) (Thermal Integrity Profiling) | 31 | EACH | 3,091.16 | 95,825.96 | | 0092 | 803-10-00800 | Permanent Casing (60" Diameter) | 570 | LNFT | 926.62 | 528,173.40 | | 0093 | 805-01-00200 | Class A1 Concrete (Deck) | 787.63 | CUYD | 3,921.84 | 3,088,958.84 | | 0094 | 805-01-00200 | Class A1 Concrete (Deck) (Internally Cured Concrete) | 651.65 | CUYD | 3,100.38 | 2,020,362.63 | | 0095 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 357.32 | CUYD | 3,165.00 | 1,130,917.80 | | 0096 | 805-01-00400 | Class A1 Concrete (Column) | 163.6 | CUYD | 6,464.20 | 1,057,543.12 | | 0097 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 166.98 | CUYD | 3,208.24 | 535,711.92 | | 0098 | 805-08-01300 | Precast-Prestressed Concrete Girders (Type LG-45) | 4,175 | LNFT | 577.08 | 2,409,309.00 | | 0099 | 805-08-01600 | Precast-Prestressed Concrete Girders (Type LG-72) | 1,674 | LNFT | 670.22 | 1,121,948.28 | | 0100 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 4' X 3' | 20 | LNFT | 1,018.08 | 20,361.60 | | 0101 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (QTY: STEEL 300 LBS CONCRETE 4 CU YDS) | 1 | EACH | 21,372.13 | 21,372.13 | | 0102 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 16,098 | SQFT | 7.09 | 114,134.82 | | 0103 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 16,098 | SQFT | 7.09 | 114,134.82 | | 0104 | 806-01-00100 | Deformed Reinforcing Steel | 491,259 | LB | 1.53 | 751,626.27 | | 0105 | 807-01-00100 | Structural Metalwork (Grade 36) | 1,071 | LUMP | 12,940.38 | 12,940.38 | | 0106 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 72 | LUMP | 12,940.38 | 12,940.38 | | 0107 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 2,384 | LNFT | 223.30 | 532,347.20 | | 0108 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 6,400 | SQFT | 116.59 | 746,176.00 | | 0109 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 1,257 | SFIN | 130.09 | 163,523.13 | | 0110 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 320 | LNFT | 327.89 | 104,924.80 | | 0111 | 816-02-00100 | Bridge End Drain System (Open Drain) | 4 | EACH | 16,695.30 | 66,781.20 | | 0112 | NS-602-00001 | Milling Concrete Pavement | 2,057 | SQYD | 60.77 | 125,003.89 | | 0113 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 6 | EACH | 9,205.66 | 55,233.96 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 35,998,403.83 |
|