Proposal:H.010222.6
Parish:Acadia
Routes:LA 97
Description:LA 97: LA 98 - LA 368
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$10,451,553.57
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $10,421,663.99 |
| 2 | 51821 | Elliott Construction, LLC | $10,607,914.48 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $12,171,708.85 |
| 4 | 33663 | Glenn Lege Construction LLC | $14,230,630.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Elliott Construction, LLC | - 3 - Gilchrist Construction Company, LLC | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approx. 0.250 acres | 0.25 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 105,000.00 | 105,000.00 | 24,603.60 | 24,603.60 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 85,000.00 | 85,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 267,092.58 | 267,092.58 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 257 | SQYD | 60.00 | 15,420.00 | 50.00 | 12,850.00 | 50.00 | 12,850.00 | 47.28 | 12,150.96 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 109 | SQYD | 81.00 | 8,829.00 | 85.00 | 9,265.00 | 50.00 | 5,450.00 | 55.80 | 6,082.20 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 450 | CUYD | 30.00 | 13,500.00 | 55.00 | 24,750.00 | 100.00 | 45,000.00 | 52.24 | 23,508.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 10,520 | LNFT | 2.00 | 21,040.00 | 2.50 | 26,300.00 | 3.00 | 31,560.00 | 2.32 | 24,406.40 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 97,070 | SQYD | 13.00 | 1,261,910.00 | 12.25 | 1,189,107.50 | 11.00 | 1,067,770.00 | 14.61 | 1,418,192.70 | | 0008 | 303-02-00100 | Removal of Existing Patches | 600 | SQYD | 75.00 | 45,000.00 | 70.00 | 42,000.00 | 25.00 | 15,000.00 | 50.67 | 30,402.00 | | 0009 | 304-01-00100 | Lime | 573.34 | TON | 326.00 | 186,908.84 | 360.00 | 206,402.40 | 350.00 | 200,669.00 | 321.39 | 184,265.74 | | 0010 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 48,536 | SQYD | 4.50 | 218,412.00 | 5.00 | 242,680.00 | 10.00 | 485,360.00 | 9.05 | 439,250.80 | | 0011 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 97,070 | SQYD | 12.50 | 1,213,375.00 | 11.50 | 1,116,305.00 | 14.00 | 1,358,980.00 | 16.92 | 1,642,424.40 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 6,509 | CUYD | 12.50 | 81,362.50 | 65.00 | 423,085.00 | 50.00 | 325,450.00 | 83.94 | 546,365.46 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 357.3 | CUYD | 45.00 | 16,078.50 | 150.00 | 53,595.00 | 40.00 | 14,292.00 | 101.49 | 36,262.38 | | 0014 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 711 | SQYD | 15.00 | 10,665.00 | 135.00 | 95,985.00 | 100.00 | 71,100.00 | 97.69 | 69,457.59 | | 0015 | 502-01-00100 | Asphalt Concrete | 28,035.1 | TON | 136.00 | 3,812,773.60 | 145.00 | 4,065,089.50 | 175.00 | 4,906,142.50 | 188.16 | 5,275,084.42 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 547.4 | TON | 50.00 | 27,370.00 | 215.00 | 117,691.00 | 400.00 | 218,960.00 | 251.25 | 137,534.25 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 72,830 | SQYD | 4.90 | 356,867.00 | 4.50 | 327,735.00 | 3.00 | 218,490.00 | 7.04 | 512,723.20 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,174 | CUYD | 0.01 | -61.74 | 0.01 | -61.74 | 1.00 | -6,174.00 | 0.01 | -61.74 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 435 | SQYD | 300.00 | 130,500.00 | 200.00 | 87,000.00 | 225.00 | 97,875.00 | 201.12 | 87,487.20 | | 0020 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 46 | LNFT | 450.00 | 20,700.00 | 550.00 | 25,300.00 | 600.00 | 27,600.00 | 325.91 | 14,991.86 | | 0021 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 966 | LNFT | 375.00 | 362,250.00 | 400.00 | 386,400.00 | 600.00 | 579,600.00 | 341.06 | 329,463.96 | | 0022 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 150 | LNFT | 425.00 | 63,750.00 | 500.00 | 75,000.00 | 625.00 | 93,750.00 | 343.61 | 51,541.50 | | 0023 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 364 | LNFT | 375.00 | 136,500.00 | 600.00 | 218,400.00 | 635.00 | 231,140.00 | 413.02 | 150,339.28 | | 0024 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 120 | LNFT | 500.00 | 60,000.00 | 800.00 | 96,000.00 | 640.00 | 76,800.00 | 400.10 | 48,012.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,042 | LNFT | 10.00 | 10,420.00 | 25.00 | 26,050.00 | 20.00 | 20,840.00 | 36.61 | 38,147.62 | | 0026 | 706-02-00200 | Concrete Drive (6" Thick) | 108.5 | SQYD | 300.00 | 32,550.00 | 150.00 | 16,275.00 | 225.00 | 24,412.50 | 102.52 | 11,123.42 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 920,000.00 | 920,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 805,474.00 | 805,474.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 23.627 | MILE | 800.00 | 18,901.60 | 800.00 | 18,901.60 | 250.00 | 5,906.75 | 951.93 | 22,491.25 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.72 | MILE | 1.00 | 17.72 | 725.00 | 12,847.00 | 700.00 | 12,404.00 | 754.98 | 13,378.25 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 46.968 | MILE | 1.00 | 46.97 | 990.00 | 46,498.32 | 900.00 | 42,271.20 | 1,045.35 | 49,098.00 | | 0031 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 30,608.05 | 30,608.05 | | 0032 | 724-01-00100 | Rumble Strips (Centerline) | 5.857 | MILE | 1,250.00 | 7,321.25 | 1,100.00 | 6,442.70 | 1,200.00 | 7,028.40 | 1,464.50 | 8,577.58 | | 0033 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 11.839 | MILE | 1,250.00 | 14,798.75 | 1,100.00 | 13,022.90 | 1,200.00 | 14,206.80 | 1,464.50 | 17,338.22 | | 0034 | 726-01-00100 | Bedding Material | 207.3 | CUYD | 300.00 | 62,190.00 | 175.00 | 36,277.50 | 200.00 | 41,460.00 | 198.55 | 41,159.42 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,200,000.00 | 1,200,000.00 | 1,113,020.00 | 1,113,020.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 55 | EACH | 125.00 | 6,875.00 | 90.00 | 4,950.00 | 100.00 | 5,500.00 | 117.16 | 6,443.80 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 1 | EACH | 150.00 | 150.00 | 100.00 | 100.00 | 100.00 | 100.00 | 131.81 | 131.81 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 906 | EACH | 6.50 | 5,889.00 | 6.00 | 5,436.00 | 6.00 | 5,436.00 | 5.81 | 5,263.86 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 58 | LNFT | 16.00 | 928.00 | 15.00 | 870.00 | 14.00 | 812.00 | 15.10 | 875.80 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.656 | MILE | 6,750.00 | 105,678.00 | 6,160.00 | 96,440.96 | 5,700.00 | 89,239.20 | 6,504.40 | 101,832.89 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.851 | MILE | 3,000.00 | 14,553.00 | 2,585.00 | 12,539.84 | 2,500.00 | 12,127.50 | 2,729.53 | 13,240.95 | | 0042 | 735-01-00100 | Mailboxes | 13 | EACH | 65.00 | 845.00 | 33.00 | 429.00 | 50.00 | 650.00 | 34.85 | 453.05 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 325.00 | 4,225.00 | 285.00 | 3,705.00 | 300.00 | 3,900.00 | 296.18 | 3,850.34 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.25 | ACRE | 12,500.00 | 3,125.00 | 5,000.00 | 1,250.00 | 11,000.00 | 2,750.00 | 5,807.50 | 1,451.88 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | 615,090.00 | 615,090.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,421,663.99 | | 10,607,914.48 | | 12,171,708.85 | | 14,230,630.93 |
|