Bid Tabulations for the Letting of 6/30/2026 LA DOTD Headquarters

Proposal:H.015526.6
Parish:East Baton Rouge
Routes:LA 3164
Description:CHIPPEWA ST PUMP STATION IMP PHASE 1
Type Construction:ELECTRICAL SYSTEMS (PUMP STATION), INTELLIGENT TRANSPORTATION SYSTEM SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$947,424.43
Rank License BidderConstruction Bid
155724Grady Crawford Const. Co., Inc. of Baton Rouge$1,409,540.42
205473Jack B. Harper Electrical LLC$1,589,271.33


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Grady Crawford Const. Co., Inc. of Baton Rouge
- 2 -
Jack B. Harper Electrical LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001713-01-00100Temporary Signs and Barricades 1     LUMP58,169.2658,169.2645,470.7745,470.77
0002727-01-00100Mobilization 1     LUMP159,275.00159,275.00103,184.62103,184.62
0003729-01-00100Sign (Type A) 96     SQFT46.004,416.0059.855,745.60
0004729-01-00200Mounting of Sign (Type A) 6     EACH377.172,263.02196.921,181.52
0005729-08-00200Sign Support (3 1/2" Size Post) 2     EACH3,101.306,202.604,290.778,581.54
0006736-04-00001Signal Pole (Pedestal Pole) 4     EACH3,200.0012,800.001,838.467,353.84
0007736-15-02400Signal Support (Foundation, 24 inch Minimum Diameter) 4     EACH8,625.0034,500.002,053.858,215.40
0008740-01-00100Construction Layout 1     LUMP26,000.0026,000.0012,830.7712,830.77
0009805-01-00500Class A1 Concrete (Footing) 4.36  CUYD4,059.8117,700.776,185.4926,968.74
0010806-01-00100Deformed Reinforcing Steel 1,148     LB9.1710,527.166.227,140.56
0011NS-ITS-01121CCTV Camera Assembly, Furnish and Install with PTZ, Digital 2     EACH5,991.8311,983.6638,935.6677,871.32
0012NS-ITS-04000Fiber Optic Marker 8     EACH180.001,440.00136.921,095.36
0013NS-ITS-04005Tracer Wire (THWN #10 AWG Green Copper Conductor) 3,000     LNFT1.985,940.001.344,020.00
0014NS-ITS-04020Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers 3,750     LNFT3.8314,362.504.4016,500.00
0015NS-ITS-04180Fiber Optic Connection, Install, Splice 3     EACH48.00144.0045.38136.14
0016NS-ITS-04200Fiber Optic Connection, Termination, Furnish & Install 5     EACH48.00240.0068.46342.30
0017NS-ITS-04420Fiber Optic Connection Patch Panel, Indoor, Furnish & Install 1     EACH27.9027.90790.77790.77
0018NS-ITS-06020Pullbox, In-ground, Furnish & Install 7     EACH2,339.2416,374.687,183.7550,286.25
0019NS-ITS-09080Local Ethernet Switch, Furnish & Install 1     EACH1,955.001,955.004,795.384,795.38
0020NS-ITS-13200As-Builts 1     LUMP10,500.0010,500.003,169.233,169.23
0021TS-729-00040Flashing Beacon Assembly on Pedestal Pole 4     EACH7,864.1631,456.648,261.5433,046.16
0022TS-822-09100Electrical System (Pump Station)1     LUMP983,262.23983,262.231,170,545.061,170,545.06
         
  CONTRACTOR TOTAL   1,409,540.42 1,589,271.33