Proposal:H.015526.6
Parish:East Baton Rouge
Routes:LA 3164
Description:CHIPPEWA ST PUMP STATION IMP PHASE 1
Type Construction:ELECTRICAL SYSTEMS (PUMP STATION), INTELLIGENT TRANSPORTATION SYSTEM SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$947,424.43
| Rank | License | Bidder | Construction Bid |
| 1 | 55724 | Grady Crawford Const. Co., Inc. of Baton Rouge | $1,409,540.42 |
| 2 | 05473 | Jack B. Harper Electrical LLC | $1,589,271.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Grady Crawford Const. Co., Inc. of Baton Rouge | - 2 - Jack B. Harper Electrical LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 58,169.26 | 58,169.26 | 45,470.77 | 45,470.77 | | 0002 | 727-01-00100 | Mobilization | 1 | LUMP | 159,275.00 | 159,275.00 | 103,184.62 | 103,184.62 | | 0003 | 729-01-00100 | Sign (Type A) | 96 | SQFT | 46.00 | 4,416.00 | 59.85 | 5,745.60 | | 0004 | 729-01-00200 | Mounting of Sign (Type A) | 6 | EACH | 377.17 | 2,263.02 | 196.92 | 1,181.52 | | 0005 | 729-08-00200 | Sign Support (3 1/2" Size Post) | 2 | EACH | 3,101.30 | 6,202.60 | 4,290.77 | 8,581.54 | | 0006 | 736-04-00001 | Signal Pole (Pedestal Pole) | 4 | EACH | 3,200.00 | 12,800.00 | 1,838.46 | 7,353.84 | | 0007 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 4 | EACH | 8,625.00 | 34,500.00 | 2,053.85 | 8,215.40 | | 0008 | 740-01-00100 | Construction Layout | 1 | LUMP | 26,000.00 | 26,000.00 | 12,830.77 | 12,830.77 | | 0009 | 805-01-00500 | Class A1 Concrete (Footing) | 4.36 | CUYD | 4,059.81 | 17,700.77 | 6,185.49 | 26,968.74 | | 0010 | 806-01-00100 | Deformed Reinforcing Steel | 1,148 | LB | 9.17 | 10,527.16 | 6.22 | 7,140.56 | | 0011 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 2 | EACH | 5,991.83 | 11,983.66 | 38,935.66 | 77,871.32 | | 0012 | NS-ITS-04000 | Fiber Optic Marker | 8 | EACH | 180.00 | 1,440.00 | 136.92 | 1,095.36 | | 0013 | NS-ITS-04005 | Tracer Wire (THWN #10 AWG Green Copper Conductor) | 3,000 | LNFT | 1.98 | 5,940.00 | 1.34 | 4,020.00 | | 0014 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 3,750 | LNFT | 3.83 | 14,362.50 | 4.40 | 16,500.00 | | 0015 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 3 | EACH | 48.00 | 144.00 | 45.38 | 136.14 | | 0016 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 5 | EACH | 48.00 | 240.00 | 68.46 | 342.30 | | 0017 | NS-ITS-04420 | Fiber Optic Connection Patch Panel, Indoor, Furnish & Install | 1 | EACH | 27.90 | 27.90 | 790.77 | 790.77 | | 0018 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install | 7 | EACH | 2,339.24 | 16,374.68 | 7,183.75 | 50,286.25 | | 0019 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 1 | EACH | 1,955.00 | 1,955.00 | 4,795.38 | 4,795.38 | | 0020 | NS-ITS-13200 | As-Builts | 1 | LUMP | 10,500.00 | 10,500.00 | 3,169.23 | 3,169.23 | | 0021 | TS-729-00040 | Flashing Beacon Assembly on Pedestal Pole | 4 | EACH | 7,864.16 | 31,456.64 | 8,261.54 | 33,046.16 | | 0022 | TS-822-09100 | Electrical System (Pump Station) | 1 | LUMP | 983,262.23 | 983,262.23 | 1,170,545.06 | 1,170,545.06 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,409,540.42 | | 1,589,271.33 |
|