Proposal:H.015491.6
Parish:Calcasieu
Description:BANKENS ROAD OVER BAYOU ARCENEAUX
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$944,908.95
| Rank | License | Bidder | Construction Bid |
| 1 | 68543 | Empire Dirtworks LLC | $743,723.05 |
| 2 | 67770 | Reliant Industrial Solutions L.L.C. | $761,732.30 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $783,776.27 |
| 4 | 46716 | BRUDD CONSTRUCTION CO., LLC | $820,238.55 |
| 5 | 00044 | Guinn Construction, LLC | $911,759.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Empire Dirtworks LLC | - 2 - Reliant Industrial Solutions L.L.C. | - 3 - SIEMA CONSTRUCTION, LLC | - 4 - BRUDD CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 11,150.00 | 11,150.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 18,300.00 | 18,300.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,435.00 | 7,435.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 3,076.00 | 3,076.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 991 | SQYD | 12.50 | 12,387.50 | 14.00 | 13,874.00 | 17.00 | 16,847.00 | 6.65 | 6,590.15 | | 0004 | 202-02-04501 | Removal of Bridge (23.8' X 25' Timber Bridge with Timber Pile and Headwall) | 595 | LUMP | 18,600.00 | 18,600.00 | 15,000.00 | 15,000.00 | 16,500.00 | 16,500.00 | 16,500.00 | 16,500.00 | | 0005 | 202-02-12000 | Removal of Fence | 130 | LNFT | 4.00 | 520.00 | 10.00 | 1,300.00 | 6.35 | 825.50 | 8.21 | 1,067.30 | | 0006 | 202-02-38200 | Removal of Signs | 4 | EACH | 135.00 | 540.00 | 103.50 | 414.00 | 181.50 | 726.00 | 60.88 | 243.52 | | 0007 | 203-01-00100 | General Excavation | 886 | CUYD | 9.10 | 8,062.60 | 27.50 | 24,365.00 | 19.60 | 17,365.60 | 8.40 | 7,442.40 | | 0008 | 203-03-00100 | Embankment | 517 | CUYD | 41.50 | 21,455.50 | 40.00 | 20,680.00 | 58.00 | 29,986.00 | 57.00 | 29,469.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 430.00 | 1,720.00 | 155.00 | 620.00 | 161.50 | 646.00 | 181.00 | 724.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 770 | LNFT | 5.00 | 3,850.00 | 4.00 | 3,080.00 | 5.50 | 4,235.00 | 4.32 | 3,326.40 | | 0011 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 1,285.9 | SQYD | 53.00 | 68,152.70 | 45.00 | 57,865.50 | 54.00 | 69,438.60 | 46.50 | 59,794.35 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 1,285.9 | SQYD | 6.00 | 7,715.40 | 27.50 | 35,362.25 | 7.30 | 9,387.07 | 28.40 | 36,519.56 | | 0013 | 502-01-00100 | Asphalt Concrete | 283 | TON | 214.00 | 60,562.00 | 257.00 | 72,731.00 | 265.00 | 74,995.00 | 345.00 | 97,635.00 | | 0014 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 419 | INLF | 2.35 | 984.65 | 3.80 | 1,592.20 | 2.85 | 1,194.15 | 7.36 | 3,083.84 | | 0015 | 705-01-00100 | Barbed Wire Fence | 170 | LNFT | 20.00 | 3,400.00 | 17.00 | 2,890.00 | 15.25 | 2,592.50 | 15.00 | 2,550.00 | | 0016 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 675.00 | 5,400.00 | 480.00 | 3,840.00 | 125.00 | 1,000.00 | 767.00 | 6,136.00 | | 0017 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 335.00 | 2,680.00 | 275.00 | 2,200.00 | 205.00 | 1,640.00 | 236.00 | 1,888.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 180 | SQYD | 85.00 | 15,300.00 | 130.00 | 23,400.00 | 77.50 | 13,950.00 | 98.00 | 17,640.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 180 | SQYD | 7.00 | 1,260.00 | 10.00 | 1,800.00 | 9.25 | 1,665.00 | 6.31 | 1,135.80 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,250.00 | 14,250.00 | 29,500.00 | 29,500.00 | 26,850.00 | 26,850.00 | 20,000.00 | 20,000.00 | | 0021 | 717-01-00100 | Seeding | 10 | LB | 34.50 | 345.00 | 55.00 | 550.00 | 53.00 | 530.00 | 60.00 | 600.00 | | 0022 | 718-01-00100 | Fertilizer | 343 | LB | 3.15 | 1,080.45 | 3.80 | 1,303.40 | 1.75 | 600.25 | 4.07 | 1,396.01 | | 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 922 | SQYD | 2.70 | 2,489.40 | 1.60 | 1,475.20 | 5.50 | 5,071.00 | 1.72 | 1,585.84 | | 0024 | 726-01-00100 | Bedding Material | 36 | CUYD | 205.00 | 7,380.00 | 140.00 | 5,040.00 | 170.00 | 6,120.00 | 157.00 | 5,652.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 72,268.00 | 72,268.00 | 73,000.00 | 73,000.00 | 75,000.00 | 75,000.00 | 74,000.00 | 74,000.00 | | 0026 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 41.00 | 738.00 | 48.00 | 864.00 | 41.00 | 738.00 | 59.00 | 1,062.00 | | 0027 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 18.00 | 36.00 | 95.00 | 190.00 | 17.50 | 35.00 | 41.30 | 82.60 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 140.00 | 560.00 | 106.00 | 424.00 | 118.00 | 472.00 | | 0029 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 300.00 | 600.00 | 365.00 | 730.00 | 295.00 | 590.00 | 390.00 | 780.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 23 | EACH | 18.00 | 414.00 | 16.50 | 379.50 | 18.00 | 414.00 | 18.00 | 414.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.341 | MILE | 11,100.00 | 3,785.10 | 10,450.00 | 3,563.45 | 11,150.00 | 3,802.15 | 11,210.00 | 3,822.61 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 34,800.00 | 34,800.00 | 25,000.00 | 25,000.00 | 12,200.00 | 12,200.00 | 5,400.00 | 5,400.00 | | 0033 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 104 | LNFT | 2,210.00 | 229,840.00 | 2,250.00 | 234,000.00 | 2,355.00 | 244,920.00 | 2,418.00 | 251,472.00 | | 0034 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Quantity of Steel = 1,273 lbs., Quantity of Concrete = 18.23 Cubic Yards per Each) | 2 | EACH | 60,000.00 | 120,000.00 | 42,500.00 | 85,000.00 | 45,300.00 | 90,600.00 | 64,000.00 | 128,000.00 | | 0035 | 304-01-00100 | Lime | 18.23 | TON | 225.00 | 4,101.75 | 360.00 | 6,562.80 | 515.00 | 9,388.45 | 679.00 | 12,378.17 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 743,723.05 | | 761,732.30 | | 783,776.27 | | 820,238.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Guinn Construction, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 40,000.00 | 40,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 991 | SQYD | 15.00 | 14,865.00 | | 0004 | 202-02-04501 | Removal of Bridge (23.8' X 25' Timber Bridge with Timber Pile and Headwall) | 595 | LUMP | 15,000.00 | 15,000.00 | | 0005 | 202-02-12000 | Removal of Fence | 130 | LNFT | 10.00 | 1,300.00 | | 0006 | 202-02-38200 | Removal of Signs | 4 | EACH | 100.00 | 400.00 | | 0007 | 203-01-00100 | General Excavation | 886 | CUYD | 30.00 | 26,580.00 | | 0008 | 203-03-00100 | Embankment | 517 | CUYD | 75.00 | 38,775.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 500.00 | 2,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 770 | LNFT | 3.00 | 2,310.00 | | 0011 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 1,285.9 | SQYD | 65.00 | 83,583.50 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 1,285.9 | SQYD | 10.00 | 12,859.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 283 | TON | 350.00 | 99,050.00 | | 0014 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 419 | INLF | 5.00 | 2,095.00 | | 0015 | 705-01-00100 | Barbed Wire Fence | 170 | LNFT | 20.00 | 3,400.00 | | 0016 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 1,000.00 | 8,000.00 | | 0017 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 300.00 | 2,400.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 180 | SQYD | 135.00 | 24,300.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 180 | SQYD | 5.00 | 900.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | | 0021 | 717-01-00100 | Seeding | 10 | LB | 50.00 | 500.00 | | 0022 | 718-01-00100 | Fertilizer | 343 | LB | 2.00 | 686.00 | | 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 922 | SQYD | 3.00 | 2,766.00 | | 0024 | 726-01-00100 | Bedding Material | 36 | CUYD | 250.00 | 9,000.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | | 0026 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 100.00 | 1,800.00 | | 0027 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 250.00 | 500.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 200.00 | 800.00 | | 0029 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 500.00 | 1,000.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 23 | EACH | 50.00 | 1,150.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.341 | MILE | 25,000.00 | 8,525.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,500.00 | 13,500.00 | | 0033 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 104 | LNFT | 2,400.00 | 249,600.00 | | 0034 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Quantity of Steel = 1,273 lbs., Quantity of Concrete = 18.23 Cubic Yards per Each) | 2 | EACH | 50,000.00 | 100,000.00 | | 0035 | 304-01-00100 | Lime | 18.23 | TON | 500.00 | 9,115.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 911,759.50 |
|