Proposal:H.016438.6
Parish:Caddo
Routes:US 171
Description:US 171: PED IMPROVEMENTS (SHREVEPORT)
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, TREATED SUBGRADE, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, CONCRETE WALKS AND CURB RAMPS, TRAFFIC SIGNALIZATION, VIDEO RADAR VEHICLE TRACKING AND DETECTION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$1,436,095.63
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $2,768,264.08 |
| 2 | 17464 | Benton & Brown, LLC. | $3,160,396.30 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $3,729,018.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - Benton & Brown, LLC. | - 3 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03030 | Removal of Pavement Structure | 1,213.6 | SQYD | 60.00 | 72,816.00 | 48.00 | 58,252.80 | 104.00 | 126,214.40 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 152 | SQYD | 34.50 | 5,244.00 | 36.00 | 5,472.00 | 70.00 | 10,640.00 | | 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | 37 | SQYD | 71.00 | 2,627.00 | 60.00 | 2,220.00 | 100.00 | 3,700.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,473.00 | 3,473.00 | 20,550.00 | 20,550.00 | 23,000.00 | 23,000.00 | | 0005 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 7,575.00 | 7,575.00 | 20,000.00 | 20,000.00 | 2,000.00 | 2,000.00 | | 0006 | 203-01-00100 | General Excavation | 224 | CUYD | 80.00 | 17,920.00 | 48.00 | 10,752.00 | 220.00 | 49,280.00 | | 0007 | 203-03-00100 | Embankment | 153 | CUYD | 120.00 | 18,360.00 | 78.00 | 11,934.00 | 400.00 | 61,200.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 4 | EACH | 96.50 | 386.00 | 60.00 | 240.00 | 50.00 | 200.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 1,200 | LNFT | 5.00 | 6,000.00 | 4.80 | 5,760.00 | 15.00 | 18,000.00 | | 0010 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,214.7 | SQYD | 135.00 | 163,984.50 | 66.00 | 80,170.20 | 105.00 | 127,543.50 | | 0011 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 1,216 | SQYD | 100.00 | 121,600.00 | 48.00 | 58,368.00 | 300.00 | 364,800.00 | | 0012 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 156.6 | SQYD | 125.00 | 19,575.00 | 60.00 | 9,396.00 | 90.00 | 14,094.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 611.6 | TON | 375.00 | 229,350.00 | 400.00 | 244,640.00 | 300.00 | 183,480.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 5,528 | SQYD | 10.00 | 55,280.00 | 25.00 | 138,200.00 | 11.00 | 60,808.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -230 | CUYD | 0.01 | -2.30 | 0.01 | -2.30 | 0.01 | -2.30 | | 0016 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 975.4 | SQYD | 200.00 | 195,080.00 | 222.00 | 216,538.80 | 500.00 | 487,700.00 | | 0017 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 1,550 | INLF | 7.00 | 10,850.00 | 6.00 | 9,300.00 | 1.30 | 2,015.00 | | 0018 | 602-05-02140 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8-1/2" Thick) | 250 | SQYD | 650.00 | 162,500.00 | 330.00 | 82,500.00 | 700.00 | 175,000.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 8 | LNFT | 690.00 | 5,520.00 | 900.00 | 7,200.00 | 1,500.00 | 12,000.00 | | 0020 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 11,896.00 | 11,896.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | | 0021 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 6,997.00 | 6,997.00 | 9,000.00 | 9,000.00 | 20,000.00 | 20,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 226.7 | SQYD | 177.50 | 40,239.25 | 120.00 | 27,204.00 | 200.00 | 45,340.00 | | 0023 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 24.9 | SQYD | 223.75 | 5,571.38 | 180.00 | 4,482.00 | 400.00 | 9,960.00 | | 0024 | 706-04-00110 | Curb Ramps Type 1 | 7.5 | SQYD | 689.00 | 5,167.50 | 420.00 | 3,150.00 | 500.00 | 3,750.00 | | 0025 | 706-04-00110 | Curb Ramps Type 3 | 40.4 | SQYD | 879.00 | 35,511.60 | 420.00 | 16,968.00 | 400.00 | 16,160.00 | | 0026 | 706-04-00110 | Curb Ramps Type 4 | 82.9 | SQYD | 319.00 | 26,445.10 | 420.00 | 34,818.00 | 200.00 | 16,580.00 | | 0027 | 706-04-00110 | Curb Ramps Type 6 | 62.4 | SQYD | 348.00 | 21,715.20 | 420.00 | 26,208.00 | 200.00 | 12,480.00 | | 0028 | 707-01-00100 | Concrete Curb | 1,476.6 | LNFT | 42.00 | 62,017.20 | 48.00 | 70,876.80 | 20.00 | 29,532.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 395,000.00 | 395,000.00 | 550,000.00 | 550,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,251 | LNFT | 0.60 | 2,550.60 | 0.60 | 2,550.60 | 0.50 | 2,125.50 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,642 | LNFT | 1.25 | 2,052.50 | 1.20 | 1,970.40 | 1.00 | 1,642.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.212 | MILE | 5,000.00 | 6,060.00 | 1,000.00 | 1,212.00 | 5,000.00 | 6,060.00 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.418 | MILE | 2,500.00 | 1,045.00 | 2,400.00 | 1,003.20 | 2,000.00 | 836.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.044 | MILE | 2,500.00 | 2,610.00 | 2,400.00 | 2,505.60 | 2,000.00 | 2,088.00 | | 0035 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 2 | EACH | 31.25 | 62.50 | 30.00 | 60.00 | 25.00 | 50.00 | | 0036 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 31.25 | 250.00 | 30.00 | 240.00 | 25.00 | 200.00 | | 0037 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 31.25 | 187.50 | 30.00 | 180.00 | 25.00 | 150.00 | | 0038 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 31.25 | 187.50 | 30.00 | 180.00 | 25.00 | 150.00 | | 0039 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 500 | SQYD | 11.25 | 5,625.00 | 10.80 | 5,400.00 | 20.00 | 10,000.00 | | 0040 | 718-01-00100 | Fertilizer | 104 | LB | 3.75 | 390.00 | 3.60 | 374.40 | 3.00 | 312.00 | | 0041 | 726-01-00100 | Bedding Material | 2 | CUYD | 187.50 | 375.00 | 1,200.00 | 2,400.00 | 1,000.00 | 2,000.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 270,000.00 | 270,000.00 | 395,000.00 | 395,000.00 | 350,000.00 | 350,000.00 | | 0043 | 729-01-00100 | Sign (Type A) | 79.5 | SQFT | 50.00 | 3,975.00 | 84.00 | 6,678.00 | 25.00 | 1,987.50 | | 0044 | 729-01-00200 | Mounting of Sign (Type A) | 19 | EACH | 62.50 | 1,187.50 | 570.00 | 10,830.00 | 25.00 | 475.00 | | 0045 | 729-02-00100 | Sign (Type B) | 165.4 | SQFT | 68.75 | 11,371.25 | 60.00 | 9,924.00 | 35.00 | 5,789.00 | | 0046 | 729-19-00200 | Dead End Road Installations (Type B) | 1 | EACH | 3,437.50 | 3,437.50 | 4,560.00 | 4,560.00 | 3,500.00 | 3,500.00 | | 0047 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 15 | EACH | 187.50 | 2,812.50 | 150.00 | 2,250.00 | 200.00 | 3,000.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 84 | EACH | 12.50 | 1,050.00 | 12.00 | 1,008.00 | 10.00 | 840.00 | | 0049 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 933 | LNFT | 6.25 | 5,831.25 | 6.00 | 5,598.00 | 5.00 | 4,665.00 | | 0050 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 855 | LNFT | 37.50 | 32,062.50 | 36.00 | 30,780.00 | 30.00 | 25,650.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.522 | MILE | 25,000.00 | 13,050.00 | 24,000.00 | 12,528.00 | 20,000.00 | 10,440.00 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.209 | MILE | 7,500.00 | 1,567.50 | 7,250.00 | 1,515.25 | 6,000.00 | 1,254.00 | | 0053 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.169 | MILE | 25,000.00 | 4,225.00 | 24,000.00 | 4,056.00 | 20,000.00 | 3,380.00 | | 0054 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 625.00 | 625.00 | 600.00 | 600.00 | 500.00 | 500.00 | | 0055 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 625.00 | 2,500.00 | 600.00 | 2,400.00 | 500.00 | 2,000.00 | | 0056 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 625.00 | 1,875.00 | 600.00 | 1,800.00 | 500.00 | 1,500.00 | | 0057 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 1,000.00 | 3,000.00 | 960.00 | 2,880.00 | 800.00 | 2,400.00 | | 0058 | 732-05-00100 | Removal of Existing Markings | 0.205 | MILE | 62,500.00 | 12,812.50 | 61,500.00 | 12,607.50 | 50,000.00 | 10,250.00 | | 0059 | 736-01-00100 | Trenching and Backfilling | 670 | LNFT | 22.00 | 14,740.00 | 15.00 | 10,050.00 | 5.00 | 3,350.00 | | 0060 | 736-03-00100 | Jacking or Boring for Conduit | 810 | LNFT | 47.00 | 38,070.00 | 51.60 | 41,796.00 | 25.00 | 20,250.00 | | 0061 | 736-04-00001 | Signal Pole (Pedestal Pole) | 6 | EACH | 3,433.00 | 20,598.00 | 4,200.00 | 25,200.00 | 2,000.00 | 12,000.00 | | 0062 | 736-04-10300 | Signal Pole (Single Mast Arm, 30ft) | 2 | EACH | 24,075.00 | 48,150.00 | 36,510.00 | 73,020.00 | 16,750.00 | 33,500.00 | | 0063 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 1 | EACH | 30,530.00 | 30,530.00 | 42,100.00 | 42,100.00 | 21,000.00 | 21,000.00 | | 0064 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 33,821.00 | 33,821.00 | 48,100.00 | 48,100.00 | 23,500.00 | 23,500.00 | | 0065 | 736-04-10550 | Signal Pole (Single Mast Arm, 55ft) | 2 | EACH | 37,175.00 | 74,350.00 | 53,030.00 | 106,060.00 | 26,000.00 | 52,000.00 | | 0066 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 8 | EACH | 1,824.50 | 14,596.00 | 1,320.00 | 10,560.00 | 1,200.00 | 9,600.00 | | 0067 | 736-05-30004 | Signal Heads (3 Section, 12 inch Led Lens, R, R, Y) | 4 | EACH | 1,824.50 | 7,298.00 | 1,320.00 | 5,280.00 | 1,200.00 | 4,800.00 | | 0068 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 4 | EACH | 2,170.00 | 8,680.00 | 1,800.00 | 7,200.00 | 1,600.00 | 6,400.00 | | 0069 | 736-06-00100 | Signal Service | 1 | EACH | 7,005.00 | 7,005.00 | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | | 0070 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 3,386.50 | 3,386.50 | 6,060.00 | 6,060.00 | 2,500.00 | 2,500.00 | | 0071 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 7,003.00 | 7,003.00 | 10,920.00 | 10,920.00 | 5,000.00 | 5,000.00 | | 0072 | 736-10-00200 | Underground Junction Box (Type E) | 3 | EACH | 1,860.00 | 5,580.00 | 2,700.00 | 8,100.00 | 1,000.00 | 3,000.00 | | 0073 | 736-10-00300 | Underground Junction Box (Type F) | 11 | EACH | 1,953.00 | 21,483.00 | 3,090.00 | 33,990.00 | 1,200.00 | 13,200.00 | | 0074 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 2,772.00 | 2,772.00 | 5,150.00 | 5,150.00 | 2,000.00 | 2,000.00 | | 0075 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 20 | LNFT | 7.20 | 144.00 | 7.20 | 144.00 | 5.00 | 100.00 | | 0076 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 450 | LNFT | 9.25 | 4,162.50 | 10.20 | 4,590.00 | 7.00 | 3,150.00 | | 0077 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,450 | LNFT | 13.25 | 19,212.50 | 12.00 | 17,400.00 | 8.00 | 11,600.00 | | 0078 | 736-12-02014 | Conductor (2c, #14 awg) | 2,205 | LNFT | 3.80 | 8,379.00 | 6.50 | 14,332.50 | 2.50 | 5,512.50 | | 0079 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 475 | LNFT | 11.35 | 5,391.25 | 10.70 | 5,082.50 | 5.00 | 2,375.00 | | 0080 | 736-12-06014 | Conductor (6c, #14 awg) | 3,210 | LNFT | 5.20 | 16,692.00 | 5.90 | 18,939.00 | 3.50 | 11,235.00 | | 0081 | 736-12-10014 | Conductor (10c, #14 awg) | 2,230 | LNFT | 7.00 | 15,610.00 | 8.40 | 18,732.00 | 4.00 | 8,920.00 | | 0082 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 6 | EACH | 3,864.00 | 23,184.00 | 7,800.00 | 46,800.00 | 3,000.00 | 18,000.00 | | 0083 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 6 | EACH | 14,153.00 | 84,918.00 | 10,440.00 | 62,640.00 | 7,000.00 | 42,000.00 | | 0084 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 6 | EACH | 1,636.00 | 9,816.00 | 1,880.00 | 11,280.00 | 1,000.00 | 6,000.00 | | 0085 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 53,000.00 | 53,000.00 | 250,000.00 | 250,000.00 | | 0086 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 20,263 | INLF | 1.60 | 32,420.80 | 3.60 | 72,946.80 | 1.30 | 26,341.90 | | 0087 | NS-736-00125 | Video Radar Vehicle Tracking and Detection System (Cabinet Components) | 1 | EACH | 32,426.00 | 32,426.00 | 33,390.00 | 33,390.00 | 25,000.00 | 25,000.00 | | 0088 | NS-736-00126 | Video Radar Vehicle Tracking and Detection System (Sensor Unit) | 4 | EACH | 13,097.00 | 52,388.00 | 14,610.00 | 58,440.00 | 11,000.00 | 44,000.00 | | 0089 | NS-736-00127 | Video Radar Vehicle Tracking and Detection System (Connection Conductors) | 1,155 | LF | 4.80 | 5,544.00 | 4.35 | 5,024.25 | 3.00 | 3,465.00 | | 0090 | NS-736-00128 | Video Radar Vehicle Tracking and Detection System (Training) | 1 | LUMP | 5,302.00 | 5,302.00 | 7,200.00 | 7,200.00 | 5,000.00 | 5,000.00 | | 0091 | NS-736-00131 | TS-2 Traffic Signal Cabinet (Pole Mounted) | 1 | EACH | 31,596.00 | 31,596.00 | 36,960.00 | 36,960.00 | 21,000.00 | 21,000.00 | | 0092 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 10 | EACH | 1,639.70 | 16,397.00 | 2,750.00 | 27,500.00 | 1,200.00 | 12,000.00 | | 0093 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 2 | EACH | 5,823.00 | 11,646.00 | 6,960.00 | 13,920.00 | 4,500.00 | 9,000.00 | | 0094 | NS-736-00211 | Rectangular Rapid Flashing Beacon Assembly Pair (Single Sided) (SOLAR POWER) | 4 | EACH | 33,374.00 | 133,496.00 | 27,300.00 | 109,200.00 | 28,000.00 | 112,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,768,264.08 | | 3,160,396.30 | | 3,729,018.00 |
|