Proposal:H.015505.6
Parish:St. Landry
Description:SOLID WASTE ROAD OVER BAYOU BOEUF
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE BRIDGE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$2,583,564.01
| Rank | License | Bidder | Construction Bid |
| 1 | 01516 | Elevate Heavy Civil Construction, LLC | $1,624,904.51 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $1,846,063.30 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,855,031.20 |
| 4 | 67770 | Reliant Industrial Solutions L.L.C. | $1,858,116.45 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $2,090,491.90 |
| 6 | 12312 | Gilchrist Construction Company, LLC | $2,198,175.20 |
| 7 | 00044 | Guinn Construction, LLC | $2,544,232.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elevate Heavy Civil Construction, LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Diamond B Construction Co., L.L.C. | - 4 - Reliant Industrial Solutions L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 90,000.00 | 90,000.00 | 65,000.00 | 65,000.00 | 47,500.00 | 47,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,400.00 | 6,400.00 | 25,000.00 | 25,000.00 | 21,000.00 | 21,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 767.2 | SQYD | 7.00 | 5,370.40 | 13.50 | 10,357.20 | 12.00 | 9,206.40 | 15.00 | 11,508.00 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge (34' x 114' Concrete Bridge with Wingwalls and Railing Recall No. 800265) | 3,876.002 | LUMP | 100,000.00 | 100,000.00 | 44,500.00 | 44,500.00 | 55,000.00 | 55,000.00 | 71,500.00 | 71,500.00 | | 0005 | 203-02-00100 | Drainage Excavation | 520 | CUYD | 20.00 | 10,400.00 | 36.00 | 18,720.00 | 40.00 | 20,800.00 | 34.00 | 17,680.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 18,800.00 | 18,800.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 200.00 | 200.00 | 150.00 | 150.00 | 200.00 | 200.00 | 300.00 | 300.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 537 | LNFT | 4.00 | 2,148.00 | 2.50 | 1,342.50 | 3.50 | 1,879.50 | 4.70 | 2,523.90 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 639.6 | SQYD | 53.00 | 33,898.80 | 55.00 | 35,178.00 | 85.00 | 54,366.00 | 49.50 | 31,660.20 | | 0010 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 545.00 | 2,180.00 | 1,200.00 | 4,800.00 | 1,300.00 | 5,200.00 | 1,250.00 | 5,000.00 | | 0011 | 304-01-00100 | Lime | 24.48 | TON | 300.00 | 7,344.00 | 250.00 | 6,120.00 | 350.00 | 8,568.00 | 325.00 | 7,956.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 640 | SQYD | 10.00 | 6,400.00 | 7.00 | 4,480.00 | 17.00 | 10,880.00 | 27.50 | 17,600.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2 | CUYD | 852.00 | 1,704.00 | 202.00 | 404.00 | 115.00 | 230.00 | 285.00 | 570.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 28.7 | CUYD | 202.00 | 5,797.40 | 113.00 | 3,243.10 | 110.00 | 3,157.00 | 139.00 | 3,989.30 | | 0015 | 502-01-00100 | Asphalt Concrete | 169.1 | TON | 312.00 | 52,759.20 | 240.50 | 40,668.55 | 260.00 | 43,966.00 | 231.00 | 39,062.10 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 84.8 | TON | 400.00 | 33,920.00 | 300.00 | 25,440.00 | 400.00 | 33,920.00 | 275.00 | 23,320.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,313 | INLF | 2.00 | 2,626.00 | 1.15 | 1,509.95 | 1.50 | 1,969.50 | 1.60 | 2,100.80 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 43.8 | LNFT | 35.00 | 1,533.00 | 55.50 | 2,430.90 | 65.00 | 2,847.00 | 38.50 | 1,686.30 | | 0019 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 6.3 | LNFT | 195.00 | 1,228.50 | 125.00 | 787.50 | 140.00 | 882.00 | 214.50 | 1,351.35 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 120.00 | 6,000.00 | 185.00 | 9,250.00 | 160.00 | 8,000.00 | 132.00 | 6,600.00 | | 0021 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,000.00 | 3,000.00 | 3,710.00 | 3,710.00 | 3,800.00 | 3,800.00 | 3,300.00 | 3,300.00 | | 0022 | 705-09-00100 | Rebuilt Fence (Barbed Wire) | 80 | LNFT | 30.00 | 2,400.00 | 35.00 | 2,800.00 | 30.00 | 2,400.00 | 24.00 | 1,920.00 | | 0023 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 600.00 | 7,200.00 | 700.00 | 8,400.00 | 600.00 | 7,200.00 | 505.00 | 6,060.00 | | 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 3 | EACH | 200.00 | 600.00 | 230.00 | 690.00 | 200.00 | 600.00 | 660.00 | 1,980.00 | | 0025 | 711-02-00400 | Riprap (55 lb) | 562 | CUYD | 138.00 | 77,556.00 | 181.00 | 101,722.00 | 105.00 | 59,010.00 | 210.00 | 118,020.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 1,176 | SQYD | 4.00 | 4,704.00 | 3.00 | 3,528.00 | 1.10 | 1,293.60 | 5.50 | 6,468.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,366.00 | 20,366.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 | 40,000.00 | 40,000.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.056 | MILE | 1,750.00 | 98.00 | 30,000.00 | 1,680.00 | 1,400.00 | 78.40 | 1,650.00 | 92.40 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 162,400.00 | 162,400.00 | 186,000.00 | 186,000.00 | 180,000.00 | 180,000.00 | 200,000.00 | 200,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 60.00 | 1,080.00 | 29.00 | 522.00 | 40.00 | 720.00 | 200.00 | 3,600.00 | | 0031 | 729-01-00200 | Mounting of Sign (Type A) | 4 | EACH | 25.00 | 100.00 | 29.00 | 116.00 | 45.00 | 180.00 | 600.00 | 2,400.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 125.00 | 500.00 | 109.00 | 436.00 | 135.00 | 540.00 | 150.00 | 600.00 | | 0033 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 150.00 | 600.00 | 287.00 | 1,148.00 | 150.00 | 600.00 | 275.00 | 1,100.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15 | EACH | 6.00 | 90.00 | 230.00 | 3,450.00 | 6.00 | 90.00 | 6.60 | 99.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.226 | MILE | 8,762.00 | 1,980.21 | 40,175.00 | 9,079.55 | 8,300.00 | 1,875.80 | 9,350.00 | 2,113.10 | | 0036 | 739-01-00100 | Hydro-Seeding | 0.28 | ACRE | 9,500.00 | 2,660.00 | 10,885.00 | 3,047.80 | 9,500.00 | 2,660.00 | 8,800.00 | 2,464.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,325.00 | 22,325.00 | 15,500.00 | 15,500.00 | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 | | 0038 | 804-01-00400 | Precast Concrete Piles (18") | 2,636 | LNFT | 124.00 | 326,864.00 | 135.00 | 355,860.00 | 160.00 | 421,760.00 | 140.00 | 369,040.00 | | 0039 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 9,750.00 | 9,750.00 | 16,650.00 | 16,650.00 | 14,500.00 | 14,500.00 | 12,500.00 | 12,500.00 | | 0040 | 804-18-00100 | Vibration Monitoring | 20 | DAY | 470.00 | 9,400.00 | 1,000.00 | 20,000.00 | 875.00 | 17,500.00 | 1,650.00 | 33,000.00 | | 0041 | 805-01-00100 | Class A1 Concrete (Slab Span) | 191.94 | CUYD | 1,000.00 | 191,940.00 | 1,550.00 | 297,507.00 | 1,300.00 | 249,522.00 | 1,650.00 | 316,701.00 | | 0042 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 56.05 | CUYD | 2,200.00 | 123,310.00 | 2,825.00 | 158,341.25 | 2,600.00 | 145,730.00 | 2,460.00 | 137,883.00 | | 0043 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,440 | SQFT | 3.00 | 4,320.00 | 2.25 | 3,240.00 | 3.00 | 4,320.00 | 5.00 | 7,200.00 | | 0044 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,440 | SQFT | 4.00 | 5,760.00 | 2.75 | 3,960.00 | 3.50 | 5,040.00 | 5.50 | 7,920.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel | 45,070 | LB | 2.00 | 90,140.00 | 2.00 | 90,140.00 | 1.50 | 67,605.00 | 1.50 | 67,605.00 | | 0046 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 246.00 | 19,680.00 | 300.00 | 24,000.00 | 290.00 | 23,200.00 | 185.00 | 14,800.00 | | 0047 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 160 | LNFT | 246.00 | 39,360.00 | 300.00 | 48,000.00 | 200.00 | 32,000.00 | 205.00 | 32,800.00 | | 0048 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 675 | SQFT | 100.00 | 67,500.00 | 100.00 | 67,500.00 | 105.00 | 70,875.00 | 125.00 | 84,375.00 | | 0049 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 150 | SFIN | 184.00 | 27,600.00 | 185.00 | 27,750.00 | 210.00 | 31,500.00 | 100.00 | 15,000.00 | | 0050 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 13.00 | 2,912.00 | 8.50 | 1,904.00 | 15.00 | 3,360.00 | 32.00 | 7,168.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,624,904.51 | | 1,846,063.30 | | 1,855,031.20 | | 1,858,116.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Gilchrist Construction Company, LLC | - 7 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 280,000.00 | 280,000.00 | 250,000.00 | 250,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 767.2 | SQYD | 39.00 | 29,920.80 | 14.00 | 10,740.80 | 15.00 | 11,508.00 | | 0004 | 202-02-04501 | Removal of Bridge Removal of Bridge (34' x 114' Concrete Bridge with Wingwalls and Railing Recall No. 800265) | 3,876.002 | LUMP | 20,000.00 | 20,000.00 | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 520 | CUYD | 30.00 | 15,600.00 | 35.00 | 18,200.00 | 25.00 | 13,000.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 81,500.00 | 81,500.00 | 30,000.00 | 30,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 225.00 | 225.00 | 230.00 | 230.00 | 1,000.00 | 1,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 537 | LNFT | 8.00 | 4,296.00 | 5.00 | 2,685.00 | 3.00 | 1,611.00 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 639.6 | SQYD | 50.00 | 31,980.00 | 75.00 | 47,970.00 | 65.00 | 41,574.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 1,600.00 | 6,400.00 | 2,000.00 | 8,000.00 | 3,000.00 | 12,000.00 | | 0011 | 304-01-00100 | Lime | 24.48 | TON | 400.00 | 9,792.00 | 400.00 | 9,792.00 | 1,000.00 | 24,480.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 640 | SQYD | 12.00 | 7,680.00 | 15.00 | 9,600.00 | 25.00 | 16,000.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2 | CUYD | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,500.00 | 3,000.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 28.7 | CUYD | 200.00 | 5,740.00 | 200.00 | 5,740.00 | 250.00 | 7,175.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 169.1 | TON | 300.00 | 50,730.00 | 400.00 | 67,640.00 | 400.00 | 67,640.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 84.8 | TON | 400.00 | 33,920.00 | 400.00 | 33,920.00 | 500.00 | 42,400.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,313 | INLF | 2.00 | 2,626.00 | 4.00 | 5,252.00 | 3.00 | 3,939.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 43.8 | LNFT | 35.00 | 1,533.00 | 67.00 | 2,934.60 | 55.00 | 2,409.00 | | 0019 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 6.3 | LNFT | 195.00 | 1,228.50 | 141.00 | 888.30 | 250.00 | 1,575.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 120.00 | 6,000.00 | 161.00 | 8,050.00 | 200.00 | 10,000.00 | | 0021 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,000.00 | 3,000.00 | 3,900.00 | 3,900.00 | 4,500.00 | 4,500.00 | | 0022 | 705-09-00100 | Rebuilt Fence (Barbed Wire) | 80 | LNFT | 40.00 | 3,200.00 | 40.00 | 3,200.00 | 50.00 | 4,000.00 | | 0023 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 600.00 | 7,200.00 | 650.00 | 7,800.00 | 900.00 | 10,800.00 | | 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 3 | EACH | 200.00 | 600.00 | 250.00 | 750.00 | 400.00 | 1,200.00 | | 0025 | 711-02-00400 | Riprap (55 lb) | 562 | CUYD | 200.00 | 112,400.00 | 170.00 | 95,540.00 | 200.00 | 112,400.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 1,176 | SQYD | 2.00 | 2,352.00 | 4.00 | 4,704.00 | 5.00 | 5,880.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.056 | MILE | 1,600.00 | 89.60 | 2,000.00 | 112.00 | 3,000.00 | 168.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 60.00 | 1,080.00 | 41.00 | 738.00 | 50.00 | 900.00 | | 0031 | 729-01-00200 | Mounting of Sign (Type A) | 4 | EACH | 25.00 | 100.00 | 47.00 | 188.00 | 100.00 | 400.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 140.00 | 560.00 | 300.00 | 1,200.00 | | 0033 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 150.00 | 600.00 | 155.00 | 620.00 | 500.00 | 2,000.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15 | EACH | 6.00 | 90.00 | 7.00 | 105.00 | 25.00 | 375.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.226 | MILE | 8,500.00 | 1,921.00 | 8,500.00 | 1,921.00 | 25,000.00 | 5,650.00 | | 0036 | 739-01-00100 | Hydro-Seeding | 0.28 | ACRE | 8,000.00 | 2,240.00 | 8,000.00 | 2,240.00 | 20,000.00 | 5,600.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0038 | 804-01-00400 | Precast Concrete Piles (18") | 2,636 | LNFT | 200.00 | 527,200.00 | 150.00 | 395,400.00 | 198.00 | 521,928.00 | | 0039 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 14,500.00 | 14,500.00 | 53,000.00 | 53,000.00 | 22,500.00 | 22,500.00 | | 0040 | 804-18-00100 | Vibration Monitoring | 20 | DAY | 1,375.00 | 27,500.00 | 900.00 | 18,000.00 | 1,650.00 | 33,000.00 | | 0041 | 805-01-00100 | Class A1 Concrete (Slab Span) | 191.94 | CUYD | 1,200.00 | 230,328.00 | 1,300.00 | 249,522.00 | 2,450.00 | 470,253.00 | | 0042 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 56.05 | CUYD | 2,500.00 | 140,125.00 | 3,000.00 | 168,150.00 | 3,250.00 | 182,162.50 | | 0043 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,440 | SQFT | 1.50 | 2,160.00 | 2.50 | 3,600.00 | 5.00 | 7,200.00 | | 0044 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,440 | SQFT | 3.00 | 4,320.00 | 3.50 | 5,040.00 | 5.00 | 7,200.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel | 45,070 | LB | 1.50 | 67,605.00 | 1.25 | 56,337.50 | 2.00 | 90,140.00 | | 0046 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 150.00 | 12,000.00 | 400.00 | 32,000.00 | 350.00 | 28,000.00 | | 0047 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 160 | LNFT | 160.00 | 25,600.00 | 200.00 | 32,000.00 | 350.00 | 56,000.00 | | 0048 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 675 | SQFT | 110.00 | 74,250.00 | 135.00 | 91,125.00 | 135.00 | 91,125.00 | | 0049 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 150 | SFIN | 90.00 | 13,500.00 | 80.00 | 12,000.00 | 150.00 | 22,500.00 | | 0050 | 815-03-00300 | Joint Seal (Poured) | 224 | LNFT | 20.00 | 4,480.00 | 20.00 | 4,480.00 | 35.00 | 7,840.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,090,491.90 | | 2,198,175.20 | | 2,544,232.50 |
|