Proposal:H.015489.6
Parish:Allen
Description:ARKADELPHIA ROAD BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGES, GRADING, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, RIP RAP, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$4,172,885.61
| Rank | License | Bidder | Construction Bid |
| 1 | 56994 | Matt L. Guinn Construction, LLC | $2,939,352.82 |
| 2 | 01516 | Elevate Heavy Civil Construction, LLC | $2,967,375.90 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $2,984,262.40 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $3,034,404.01 |
| 5 | 00044 | Guinn Construction, LLC | $3,037,113.02 |
| 6 | 27239 | Apeck Construction, LLC | $3,366,324.22 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $3,704,957.25 |
| 8 | 12312 | Gilchrist Construction Company, LLC | $3,798,510.04 |
| 9 | 14788 | Louisiana Bridge, Inc. | $4,332,149.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Matt L. Guinn Construction, LLC | - 2 - Elevate Heavy Civil Construction, LLC | - 3 - SIEMA CONSTRUCTION, LLC | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,000.00 | 35,000.00 | 12,020.00 | 12,020.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-00020 | Removal of Aggregate Drives | 91 | SQYD | 18.00 | 1,638.00 | 35.00 | 3,185.00 | 10.00 | 910.00 | 50.00 | 4,550.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 3,370 | SQYD | 12.00 | 40,440.00 | 6.00 | 20,220.00 | 9.00 | 30,330.00 | 9.00 | 30,330.00 | | 0005 | 202-02-04501 | Removal of Bridge (23.8' X 78' Timber Bridge with Timber Pile and Headwall) | 1,856.4 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (23.8' X 96' Timber Bridge with Timber Pile and Headwall) | 2,284.8 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (23.8' X 98' Timber Bridge with Timber Pile and Headwall) | 2,332.4 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0008 | 203-01-00100 | General Excavation | 540 | CUYD | 25.00 | 13,500.00 | 31.00 | 16,740.00 | 20.00 | 10,800.00 | 17.00 | 9,180.00 | | 0009 | 203-02-00100 | Drainage Excavation | 908 | CUYD | 20.00 | 18,160.00 | 19.00 | 17,252.00 | 30.00 | 27,240.00 | 50.00 | 45,400.00 | | 0010 | 203-03-00100 | Embankment | 1,522 | CUYD | 25.00 | 38,050.00 | 56.00 | 85,232.00 | 22.00 | 33,484.00 | 20.00 | 30,440.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 757 | LNFT | 3.00 | 2,271.00 | 5.00 | 3,785.00 | 2.50 | 1,892.50 | 5.00 | 3,785.00 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 2,167 | SQYD | 55.00 | 119,185.00 | 55.00 | 119,185.00 | 65.00 | 140,855.00 | 35.00 | 75,845.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 2,167 | SQYD | 1.00 | 2,167.00 | 5.00 | 10,835.00 | 3.00 | 6,501.00 | 15.00 | 32,505.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 454.4 | TON | 350.00 | 159,040.00 | 250.00 | 113,600.00 | 300.00 | 136,320.00 | 160.00 | 72,704.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 137.8 | TON | 425.00 | 58,565.00 | 300.00 | 41,340.00 | 350.00 | 48,230.00 | 290.00 | 39,962.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 330 | INLF | 4.00 | 1,320.00 | 3.00 | 990.00 | 2.25 | 742.50 | 16.00 | 5,280.00 | | 0017 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 50 | LNFT | 100.00 | 5,000.00 | 65.00 | 3,250.00 | 91.00 | 4,550.00 | 180.00 | 9,000.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 100.00 | 15,000.00 | 33.00 | 4,950.00 | 29.00 | 4,350.00 | 35.00 | 5,250.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 145.00 | 43,500.00 | 115.00 | 34,500.00 | 110.00 | 33,000.00 | 135.00 | 40,500.00 | | 0020 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 5,000.00 | 40,000.00 | 3,300.00 | 26,400.00 | 3,750.00 | 30,000.00 | 3,750.00 | 30,000.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 5,000.00 | 20,000.00 | 3,000.00 | 12,000.00 | 3,750.00 | 15,000.00 | 4,100.00 | 16,400.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 700.00 | 13,300.00 | 600.00 | 11,400.00 | 692.00 | 13,148.00 | 600.00 | 11,400.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 19 | EACH | 200.00 | 3,800.00 | 200.00 | 3,800.00 | 230.00 | 4,370.00 | 200.00 | 3,800.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,221 | SQYD | 100.00 | 122,100.00 | 76.00 | 92,796.00 | 66.00 | 80,586.00 | 120.00 | 146,520.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,484 | SQYD | 4.00 | 5,936.00 | 5.00 | 7,420.00 | 1.00 | 1,484.00 | 1.10 | 1,632.40 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 30,100.00 | 30,100.00 | 16,000.00 | 16,000.00 | 98,000.00 | 98,000.00 | | 0027 | 717-01-00100 | Seeding | 33 | LB | 40.00 | 1,320.00 | 18.00 | 594.00 | 20.00 | 660.00 | 35.00 | 1,155.00 | | 0028 | 718-01-00100 | Fertilizer | 703 | LB | 2.00 | 1,406.00 | 3.00 | 2,109.00 | 3.00 | 2,109.00 | 3.00 | 2,109.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 225,000.00 | 225,000.00 | 296,737.00 | 296,737.00 | 297,000.00 | 297,000.00 | 290,000.00 | 290,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 60.00 | 600.00 | 35.00 | 350.00 | 29.00 | 290.00 | 40.00 | 400.00 | | 0031 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 200.00 | 400.00 | 15.00 | 30.00 | 288.00 | 576.00 | 45.00 | 90.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 135.00 | 1,620.00 | 95.00 | 1,140.00 | 115.00 | 1,380.00 | 135.00 | 1,620.00 | | 0033 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 200.00 | 400.00 | 250.00 | 500.00 | 175.00 | 350.00 | 150.00 | 300.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 55 | EACH | 35.00 | 1,925.00 | 6.00 | 330.00 | 7.00 | 385.00 | 6.00 | 330.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.831 | MILE | 7,000.00 | 5,817.00 | 6,000.00 | 4,986.00 | 6,675.00 | 5,546.93 | 5,800.00 | 4,819.80 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 57,000.00 | 57,000.00 | 40,000.00 | 40,000.00 | 62,000.00 | 62,000.00 | | 0037 | 804-01-00300 | Precast Concrete Piles (16") | 3,988 | LNFT | 135.00 | 538,380.00 | 145.00 | 578,260.00 | 146.00 | 582,248.00 | 151.00 | 602,188.00 | | 0038 | 805-01-00100 | Class A1 Concrete (Slab Span) | 309.12 | CUYD | 1,650.00 | 510,048.00 | 1,232.00 | 380,835.84 | 1,650.00 | 510,048.00 | 1,400.00 | 432,768.00 | | 0039 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 79.89 | CUYD | 2,350.00 | 187,741.50 | 3,539.00 | 282,730.71 | 3,550.00 | 283,609.50 | 3,500.00 | 279,615.00 | | 0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,344.07 | SQFT | 3.00 | 10,032.21 | 2.00 | 6,688.14 | 2.00 | 6,688.14 | 3.00 | 10,032.21 | | 0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,344.07 | SQFT | 3.00 | 10,032.21 | 3.00 | 10,032.21 | 3.50 | 11,704.25 | 3.50 | 11,704.25 | | 0042 | 806-01-00100 | Deformed Reinforcing Steel | 82,724 | LB | 1.85 | 153,039.40 | 2.00 | 165,448.00 | 1.75 | 144,767.00 | 1.50 | 124,086.00 | | 0043 | 810-01-00100 | Concrete Bridge Railing (Standard) | 240 | LNFT | 235.00 | 56,400.00 | 269.00 | 64,560.00 | 330.00 | 79,200.00 | 175.00 | 42,000.00 | | 0044 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 320 | LNFT | 235.00 | 75,200.00 | 272.00 | 87,040.00 | 330.00 | 105,600.00 | 190.00 | 60,800.00 | | 0045 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,500 | SQFT | 90.00 | 135,000.00 | 92.00 | 138,000.00 | 92.50 | 138,750.00 | 100.00 | 150,000.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) | 408 | LNFT | 25.00 | 10,200.00 | 24.00 | 9,792.00 | 8.00 | 3,264.00 | 10.00 | 4,080.00 | | 0047 | 304-01-00100 | Lime | 30.71 | TON | 450.00 | 13,819.50 | 300.00 | 9,213.00 | 498.00 | 15,293.58 | 385.00 | 11,823.35 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,939,352.82 | | 2,967,375.90 | | 2,984,262.40 | | 3,034,404.01 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Guinn Construction, LLC | - 6 - Apeck Construction, LLC | - 7 - JB JAMES CONSTRUCTION LLC | - 8 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 125,000.00 | 125,000.00 | 62,895.63 | 62,895.63 | 350,000.00 | 350,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 16,475.84 | 16,475.84 | 7,000.00 | 7,000.00 | 2,500.00 | 2,500.00 | | 0003 | 202-02-00020 | Removal of Aggregate Drives | 91 | SQYD | 10.00 | 910.00 | 12.14 | 1,104.74 | 29.00 | 2,639.00 | 15.00 | 1,365.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 3,370 | SQYD | 10.00 | 33,700.00 | 16.64 | 56,076.80 | 10.00 | 33,700.00 | 11.00 | 37,070.00 | | 0005 | 202-02-04501 | Removal of Bridge (23.8' X 78' Timber Bridge with Timber Pile and Headwall) | 1,856.4 | LUMP | 12,500.00 | 12,500.00 | 180,225.73 | 180,225.73 | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (23.8' X 96' Timber Bridge with Timber Pile and Headwall) | 2,284.8 | LUMP | 15,000.00 | 15,000.00 | 214,041.85 | 214,041.85 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (23.8' X 98' Timber Bridge with Timber Pile and Headwall) | 2,332.4 | LUMP | 15,000.00 | 15,000.00 | 214,061.35 | 214,061.35 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0008 | 203-01-00100 | General Excavation | 540 | CUYD | 25.00 | 13,500.00 | 31.71 | 17,123.40 | 30.00 | 16,200.00 | 80.00 | 43,200.00 | | 0009 | 203-02-00100 | Drainage Excavation | 908 | CUYD | 25.00 | 22,700.00 | 46.54 | 42,258.32 | 30.00 | 27,240.00 | 62.00 | 56,296.00 | | 0010 | 203-03-00100 | Embankment | 1,522 | CUYD | 40.00 | 60,880.00 | 42.22 | 64,258.84 | 60.00 | 91,320.00 | 80.00 | 121,760.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 757 | LNFT | 3.00 | 2,271.00 | 7.16 | 5,420.12 | 8.00 | 6,056.00 | 5.00 | 3,785.00 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 2,167 | SQYD | 69.00 | 149,523.00 | 49.14 | 106,486.38 | 55.00 | 119,185.00 | 42.00 | 91,014.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 2,167 | SQYD | 10.00 | 21,670.00 | 8.92 | 19,329.64 | 10.00 | 21,670.00 | 8.50 | 18,419.50 | | 0014 | 502-01-00100 | Asphalt Concrete | 454.4 | TON | 300.00 | 136,320.00 | 219.50 | 99,740.80 | 250.00 | 113,600.00 | 220.00 | 99,968.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 137.8 | TON | 350.00 | 48,230.00 | 231.02 | 31,834.56 | 300.00 | 41,340.00 | 220.00 | 30,316.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 330 | INLF | 10.00 | 3,300.00 | 13.22 | 4,362.60 | 6.00 | 1,980.00 | 13.00 | 4,290.00 | | 0017 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 50 | LNFT | 115.00 | 5,750.00 | 147.78 | 7,389.00 | 150.00 | 7,500.00 | 150.00 | 7,500.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 40.00 | 6,000.00 | 39.37 | 5,905.50 | 25.00 | 3,750.00 | 25.00 | 3,750.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 135.00 | 40,500.00 | 137.20 | 41,160.00 | 95.00 | 28,500.00 | 95.00 | 28,500.00 | | 0020 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,500.00 | 28,000.00 | 3,579.03 | 28,632.24 | 3,250.00 | 26,000.00 | 3,250.00 | 26,000.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,800.00 | 15,200.00 | 3,936.93 | 15,747.72 | 3,250.00 | 13,000.00 | 3,250.00 | 13,000.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 750.00 | 14,250.00 | 715.81 | 13,600.39 | 600.00 | 11,400.00 | 625.00 | 11,875.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 19 | EACH | 225.00 | 4,275.00 | 238.60 | 4,533.40 | 200.00 | 3,800.00 | 225.00 | 4,275.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,221 | SQYD | 110.00 | 134,310.00 | 94.03 | 114,810.63 | 130.00 | 158,730.00 | 120.00 | 146,520.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,484 | SQYD | 5.00 | 7,420.00 | 2.64 | 3,917.76 | 2.00 | 2,968.00 | 2.00 | 2,968.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 34,120.04 | 34,120.04 | 46,000.00 | 46,000.00 | 95,000.00 | 95,000.00 | | 0027 | 717-01-00100 | Seeding | 33 | LB | 50.00 | 1,650.00 | 95.44 | 3,149.52 | 17.00 | 561.00 | 35.00 | 1,155.00 | | 0028 | 718-01-00100 | Fertilizer | 703 | LB | 2.00 | 1,406.00 | 1.55 | 1,089.65 | 2.50 | 1,757.50 | 3.00 | 2,109.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 275,000.00 | 275,000.00 | 72,178.47 | 72,178.47 | 350,000.00 | 350,000.00 | 375,000.00 | 375,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 100.00 | 1,000.00 | 167.02 | 1,670.20 | 25.00 | 250.00 | 25.00 | 250.00 | | 0031 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 100.00 | 200.00 | 411.59 | 823.18 | 250.00 | 500.00 | 250.00 | 500.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 125.00 | 1,500.00 | 113.34 | 1,360.08 | 100.00 | 1,200.00 | 100.00 | 1,200.00 | | 0033 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 500.00 | 1,000.00 | 1,014.06 | 2,028.12 | 150.00 | 300.00 | 150.00 | 300.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 55 | EACH | 15.00 | 825.00 | 7.16 | 393.80 | 6.00 | 330.00 | 6.00 | 330.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.831 | MILE | 12,500.00 | 10,387.50 | 6,994.39 | 5,812.34 | 6,000.00 | 4,986.00 | 5,900.00 | 4,902.90 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 6,825.45 | 6,825.45 | 50,000.00 | 50,000.00 | 48,000.00 | 48,000.00 | | 0037 | 804-01-00300 | Precast Concrete Piles (16") | 3,988 | LNFT | 145.00 | 578,260.00 | 53.69 | 214,115.72 | 200.00 | 797,600.00 | 160.00 | 638,080.00 | | 0038 | 805-01-00100 | Class A1 Concrete (Slab Span) | 309.12 | CUYD | 1,750.00 | 540,960.00 | 2,420.71 | 748,289.88 | 1,500.00 | 463,680.00 | 1,900.00 | 587,328.00 | | 0039 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 79.89 | CUYD | 2,250.00 | 179,752.50 | 4,389.27 | 350,658.78 | 2,800.00 | 223,692.00 | 4,500.00 | 359,505.00 | | 0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,344.07 | SQFT | 3.00 | 10,032.21 | 6.38 | 21,335.17 | 2.00 | 6,688.14 | 3.00 | 10,032.21 | | 0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,344.07 | SQFT | 3.00 | 10,032.21 | 6.38 | 21,335.17 | 3.00 | 10,032.21 | 4.00 | 13,376.28 | | 0042 | 806-01-00100 | Deformed Reinforcing Steel | 82,724 | LB | 1.65 | 136,494.60 | 1.39 | 114,986.36 | 1.60 | 132,358.40 | 1.25 | 103,405.00 | | 0043 | 810-01-00100 | Concrete Bridge Railing (Standard) | 240 | LNFT | 275.00 | 66,000.00 | 317.94 | 76,305.60 | 150.00 | 36,000.00 | 400.00 | 96,000.00 | | 0044 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 320 | LNFT | 275.00 | 88,000.00 | 314.21 | 100,547.20 | 175.00 | 56,000.00 | 220.00 | 70,400.00 | | 0045 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,500 | SQFT | 90.00 | 135,000.00 | 132.12 | 198,180.00 | 90.00 | 135,000.00 | 122.00 | 183,000.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) | 408 | LNFT | 15.00 | 6,120.00 | 12.43 | 5,071.44 | 20.00 | 8,160.00 | 32.00 | 13,056.00 | | 0047 | 304-01-00100 | Lime | 30.71 | TON | 400.00 | 12,284.00 | 477.20 | 14,654.81 | 400.00 | 12,284.00 | 365.00 | 11,209.15 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,037,113.02 | | 3,366,324.22 | | 3,704,957.25 | | 3,798,510.04 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 190,000.00 | 190,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | | 0003 | 202-02-00020 | Removal of Aggregate Drives | 91 | SQYD | 25.00 | 2,275.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 3,370 | SQYD | 16.00 | 53,920.00 | | 0005 | 202-02-04501 | Removal of Bridge (23.8' X 78' Timber Bridge with Timber Pile and Headwall) | 1,856.4 | LUMP | 60,000.00 | 60,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (23.8' X 96' Timber Bridge with Timber Pile and Headwall) | 2,284.8 | LUMP | 60,000.00 | 60,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (23.8' X 98' Timber Bridge with Timber Pile and Headwall) | 2,332.4 | LUMP | 60,000.00 | 60,000.00 | | 0008 | 203-01-00100 | General Excavation | 540 | CUYD | 30.00 | 16,200.00 | | 0009 | 203-02-00100 | Drainage Excavation | 908 | CUYD | 31.00 | 28,148.00 | | 0010 | 203-03-00100 | Embankment | 1,522 | CUYD | 48.00 | 73,056.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 757 | LNFT | 4.50 | 3,406.50 | | 0012 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 2,167 | SQYD | 72.00 | 156,024.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 2,167 | SQYD | 14.00 | 30,338.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 454.4 | TON | 350.00 | 159,040.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 137.8 | TON | 375.00 | 51,675.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 330 | INLF | 4.00 | 1,320.00 | | 0017 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 50 | LNFT | 150.00 | 7,500.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 40.00 | 6,000.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 155.00 | 46,500.00 | | 0020 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 4,500.00 | 36,000.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,800.00 | 19,200.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 700.00 | 13,300.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 19 | EACH | 300.00 | 5,700.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,221 | SQYD | 110.00 | 134,310.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,484 | SQYD | 4.50 | 6,678.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | | 0027 | 717-01-00100 | Seeding | 33 | LB | 25.00 | 825.00 | | 0028 | 718-01-00100 | Fertilizer | 703 | LB | 4.00 | 2,812.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 650,000.00 | 650,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 100.00 | 1,000.00 | | 0031 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 250.00 | 500.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 160.00 | 1,920.00 | | 0033 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 2 | EACH | 230.00 | 460.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 55 | EACH | 12.00 | 660.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.831 | MILE | 7,000.00 | 5,817.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 90,000.00 | 90,000.00 | | 0037 | 804-01-00300 | Precast Concrete Piles (16") | 3,988 | LNFT | 205.00 | 817,540.00 | | 0038 | 805-01-00100 | Class A1 Concrete (Slab Span) | 309.12 | CUYD | 2,000.00 | 618,240.00 | | 0039 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 79.89 | CUYD | 2,900.00 | 231,681.00 | | 0040 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,344.07 | SQFT | 5.00 | 16,720.35 | | 0041 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,344.07 | SQFT | 5.00 | 16,720.35 | | 0042 | 806-01-00100 | Deformed Reinforcing Steel | 82,724 | LB | 2.00 | 165,448.00 | | 0043 | 810-01-00100 | Concrete Bridge Railing (Standard) | 240 | LNFT | 230.00 | 55,200.00 | | 0044 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 320 | LNFT | 250.00 | 80,000.00 | | 0045 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,500 | SQFT | 145.00 | 217,500.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) | 408 | LNFT | 20.00 | 8,160.00 | | 0047 | 304-01-00100 | Lime | 30.71 | TON | 500.00 | 15,355.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,332,149.20 |
|