Proposal:H.015210.6
Parish:St. Tammany
Description:JUDGE TANNER BLVD SIDEWALK (ST TAMMANY)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CONCRETE SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$499,964.50
| Rank | License | Bidder | Construction Bid |
| 1 | 60826 | Warner Construction, Inc. | $404,589.40 |
| 2 | 74839 | 21 Construction, L.L.C. | $515,000.00 |
| 3 | 48896 | Command Construction Industries LLC | $571,082.00 |
| 4 | 34263 | LA Contracting Enterprise, L.L.C. | $585,743.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Warner Construction, Inc. | - 2 - 21 Construction, L.L.C. | - 3 - Command Construction Industries LLC | - 4 - LA Contracting Enterprise, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.74 | LUMP | 4,500.00 | 4,500.00 | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 17,000.00 | 17,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 21,000.00 | 21,000.00 | 10,000.00 | 10,000.00 | 14,600.80 | 14,600.80 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 16.4 | SQYD | 30.00 | 492.00 | 10.00 | 164.00 | 25.00 | 410.00 | 65.00 | 1,066.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 24 | LNFT | 25.00 | 600.00 | 10.00 | 240.00 | 25.00 | 600.00 | 14.00 | 336.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 53 | SQYD | 25.00 | 1,325.00 | 10.00 | 530.00 | 25.00 | 1,325.00 | 115.00 | 6,095.00 | | 0006 | 202-02-38220 | Removal of Sign Supports | 4 | EACH | 40.00 | 160.00 | 50.00 | 200.00 | 100.00 | 400.00 | 10.00 | 40.00 | | 0007 | 202-03-38000 | Relocation of Sign | 4 | EACH | 120.00 | 480.00 | 50.00 | 200.00 | 100.00 | 400.00 | 10.00 | 40.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,500.00 | 6,500.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 84 | EACH | 10.00 | 840.00 | 1.00 | 84.00 | 10.00 | 840.00 | 30.00 | 2,520.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 618 | LNFT | 3.50 | 2,163.00 | 1.00 | 618.00 | 5.00 | 3,090.00 | 3.00 | 1,854.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5.5 | CUYD | 150.00 | 825.00 | 150.00 | 825.00 | 100.00 | 550.00 | 600.00 | 3,300.00 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 16 | SQYD | 250.00 | 4,000.00 | 330.00 | 5,280.00 | 175.00 | 2,800.00 | 550.00 | 8,800.00 | | 0013 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,104 | INLF | 1.50 | 1,656.00 | 1.00 | 1,104.00 | 1.00 | 1,104.00 | 2.00 | 2,208.00 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 757 | LNFT | 95.00 | 71,915.00 | 116.00 | 87,812.00 | 100.00 | 75,700.00 | 99.00 | 74,943.00 | | 0015 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 414 | LNFT | 110.00 | 45,540.00 | 130.00 | 53,820.00 | 150.00 | 62,100.00 | 119.00 | 49,266.00 | | 0016 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 81 | LNFT | 185.00 | 14,985.00 | 220.00 | 17,820.00 | 175.00 | 14,175.00 | 210.00 | 17,010.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 | 549.00 | 549.00 | 1,000.00 | 1,000.00 | 800.00 | 800.00 | | 0018 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 3,800.00 | 7,600.00 | 4,800.00 | 9,600.00 | 7,500.00 | 15,000.00 | 5,500.00 | 11,000.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 6,200.00 | 74,400.00 | 6,800.00 | 81,600.00 | 7,500.00 | 90,000.00 | 5,500.00 | 66,000.00 | | 0020 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 1,100.00 | 2,200.00 | 1,050.00 | 2,100.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 | | 0021 | 702-04-00300 | Adjusting Junction Boxes | 2 | EACH | 1,000.00 | 2,000.00 | 1,800.00 | 3,600.00 | 1,500.00 | 3,000.00 | 1,250.00 | 2,500.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 857.7 | SQYD | 75.00 | 64,327.50 | 90.00 | 77,193.00 | 80.00 | 68,616.00 | 68.00 | 58,323.60 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 48.2 | SQYD | 100.00 | 4,820.00 | 120.00 | 5,784.00 | 100.00 | 4,820.00 | 108.00 | 5,205.60 | | 0024 | 706-04-00110 | Curb Ramps (Type 7) | 26.6 | SQYD | 200.00 | 5,320.00 | 245.00 | 6,517.00 | 175.00 | 4,655.00 | 250.00 | 6,650.00 | | 0025 | 707-03-00100 | Combination Concrete Curb and Gutter | 8 | LNFT | 200.00 | 1,600.00 | 110.00 | 880.00 | 100.00 | 800.00 | 120.00 | 960.00 | | 0026 | 710-01-00100 | Flowable Fill | 5.9 | CUYD | 165.00 | 973.50 | 150.00 | 885.00 | 250.00 | 1,475.00 | 1,000.00 | 5,900.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | | 0028 | 714-01-00700 | Slab Sodding (Centipede) | 709 | SQYD | 10.00 | 7,090.00 | 12.00 | 8,508.00 | 10.00 | 7,090.00 | 18.00 | 12,762.00 | | 0029 | 726-01-00100 | Bedding Material | 241.6 | CUYD | 89.00 | 21,502.40 | 45.00 | 10,872.00 | 100.00 | 24,160.00 | 90.00 | 21,744.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 | 58,000.00 | 58,000.00 | | 0031 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 4 | EACH | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 500.00 | 2,000.00 | 270.00 | 1,080.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 10 | LNFT | 225.00 | 2,250.00 | 370.00 | 3,700.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 0.27 | ACRE | 10,000.00 | 2,700.00 | 5,000.00 | 1,350.00 | 10,000.00 | 2,700.00 | 4,500.00 | 1,215.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 9,000.00 | 9,000.00 | | 0035 | 741-35-00100 | Adjust Valve or Meter Box | 1 | EACH | 500.00 | 500.00 | 275.00 | 275.00 | 100.00 | 100.00 | 500.00 | 500.00 | | 0036 | 805-01-01000 | Class A1 Concrete (Headwalls) (Height < 3ft) | 4.1 | CUYD | 650.00 | 2,665.00 | 3,100.00 | 12,710.00 | 2,000.00 | 8,200.00 | 10,000.00 | 41,000.00 | | 0037 | 806-01-00100 | Deformed Reinforcing Steel | 236 | LB | 10.00 | 2,360.00 | 5.00 | 1,180.00 | 2.00 | 472.00 | 9.00 | 2,124.00 | | 0038 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 9 | EACH | 2,200.00 | 19,800.00 | 1,000.00 | 9,000.00 | 1,500.00 | 13,500.00 | 2,100.00 | 18,900.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 404,589.40 | | 515,000.00 | | 571,082.00 | | 585,743.00 |
|