Proposal:H.015125.6
Parish:Natchitoches
Routes:LA 495
Description:LA 495: SLIDE AND ROADWAY REPAIR
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost:$1,566,632.20
| Rank | License | Bidder | Construction Bid |
| 1 | 40486 | REGIONAL CONSTRUCTION, LLC | $1,378,721.33 |
| 2 | C0002 | SkyPlex Trucking, LLC dba SkyPlex Construction | $1,425,163.86 |
| 3 | 27239 | Apeck Construction, LLC | $1,585,274.12 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $1,613,432.38 |
| 5 | 54928 | Womack And Sons Constr. Group LLC | $1,760,880.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - REGIONAL CONSTRUCTION, LLC | - 2 - SkyPlex Trucking, LLC dba SkyPlex Construction | - 3 - Apeck Construction, LLC | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5.5 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 28,393.03 | 28,393.03 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 32,101.01 | 32,101.01 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,715 | SQYD | 12.00 | 80,580.00 | 4.00 | 26,860.00 | 8.48 | 56,943.20 | 5.75 | 38,611.25 | | 0004 | 202-02-12000 | Removal of Fence | 3,450 | LNFT | 1.00 | 3,450.00 | 4.00 | 13,800.00 | 2.89 | 9,970.50 | 5.75 | 19,837.50 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 18" RCP | 34 | LNFT | 25.00 | 850.00 | 61.00 | 2,074.00 | 40.91 | 1,390.94 | 23.00 | 782.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 24" x 36" CMPA | 50 | LNFT | 25.00 | 1,250.00 | 36.00 | 1,800.00 | 40.83 | 2,041.50 | 23.00 | 1,150.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 30" x 18" CMPA | 48 | LNFT | 30.00 | 1,440.00 | 40.50 | 1,944.00 | 40.86 | 1,961.28 | 23.00 | 1,104.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 12" CMP | 98 | LNFT | 20.00 | 1,960.00 | 12.00 | 1,176.00 | 40.84 | 4,002.32 | 23.00 | 2,254.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 15" CMP | 30 | LNFT | 20.00 | 600.00 | 38.00 | 1,140.00 | 40.86 | 1,225.80 | 23.00 | 690.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 15" RCP | 30 | LNFT | 20.00 | 600.00 | 35.00 | 1,050.00 | 40.86 | 1,225.80 | 23.00 | 690.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 6" CMP | 20 | LNFT | 20.00 | 400.00 | 16.00 | 320.00 | 40.78 | 815.60 | 23.00 | 460.00 | | 0012 | 202-07-00100 | Plugging Existing Water Wells | 1 | EACH | 1,000.00 | 1,000.00 | 7,000.00 | 7,000.00 | 5,971.40 | 5,971.40 | 8,000.00 | 8,000.00 | | 0013 | 203-01-00100 | General Excavation | 12,457 | CUYD | 12.00 | 149,484.00 | 4.50 | 56,056.50 | 12.67 | 157,830.19 | 8.65 | 107,753.05 | | 0014 | 203-03-00100 | Embankment | 8,253 | CUYD | 21.00 | 173,313.00 | 27.00 | 222,831.00 | 44.56 | 367,753.68 | 16.00 | 132,048.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 110.00 | 1,430.00 | 150.00 | 1,950.00 | 143.31 | 1,863.03 | 106.00 | 1,378.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 4,855 | LNFT | 6.00 | 29,130.00 | 4.50 | 21,847.50 | 2.81 | 13,642.55 | 2.00 | 9,710.00 | | 0017 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 10,458.1 | SQYD | 14.25 | 149,027.93 | 19.00 | 198,703.90 | 20.90 | 218,574.29 | 22.50 | 235,307.25 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 210 | CUYD | 145.00 | 30,450.00 | 121.25 | 25,462.50 | 186.53 | 39,171.30 | 165.00 | 34,650.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 150.00 | 7,500.00 | 143.31 | 7,165.50 | 165.00 | 8,250.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 1,896.3 | TON | 195.00 | 369,778.50 | 207.00 | 392,534.10 | 181.98 | 345,088.67 | 230.00 | 436,149.00 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 195.00 | 7,800.00 | 303.50 | 12,140.00 | 253.55 | 10,142.00 | 230.00 | 9,200.00 | | 0022 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 316 | INLF | 1.25 | 395.00 | 4.00 | 1,264.00 | 13.82 | 4,367.12 | 3.85 | 1,216.60 | | 0023 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 64 | LNFT | 230.00 | 14,720.00 | 158.00 | 10,112.00 | 192.05 | 12,291.20 | 185.00 | 11,840.00 | | 0024 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 120 | LNFT | 165.00 | 19,800.00 | 59.00 | 7,080.00 | 139.41 | 16,729.20 | 110.00 | 13,200.00 | | 0025 | 702-05-01000 | Cross Drain End Treatment (1 Barrel, 24" RCP or 30" CMP) Sacked Revetment Toe Wall | 1 | EACH | 8,000.00 | 8,000.00 | 20,000.00 | 20,000.00 | 6,813.51 | 6,813.51 | 1,030.00 | 1,030.00 | | 0026 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 2,721 | LNFT | 15.00 | 40,815.00 | 25.00 | 68,025.00 | 15.53 | 42,257.13 | 15.00 | 40,815.00 | | 0027 | 705-04-00100 | Single Swinging Driveway Gates | 3 | EACH | 1,500.00 | 4,500.00 | 1,350.00 | 4,050.00 | 1,433.14 | 4,299.42 | 1,375.00 | 4,125.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 600.00 | 8,400.00 | 400.00 | 5,600.00 | 1,194.28 | 16,719.92 | 93.00 | 1,302.00 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 250.00 | 3,500.00 | 400.00 | 5,600.00 | 238.86 | 3,344.04 | 136.00 | 1,904.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 23 | SQYD | 110.00 | 2,530.00 | 132.00 | 3,036.00 | 212.11 | 4,878.53 | 160.00 | 3,680.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | 11,942.80 | 11,942.80 | 65,000.00 | 65,000.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.308 | MILE | 750.00 | 981.00 | 1,474.59 | 1,928.76 | 1,076.50 | 1,408.06 | 920.00 | 1,203.36 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.152 | MILE | 1,000.00 | 152.00 | 6,400.00 | 972.80 | 942.83 | 143.31 | 850.00 | 129.20 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.078 | MILE | 1,250.00 | 6,347.50 | 1,276.29 | 6,481.00 | 1,194.75 | 6,066.94 | 1,150.00 | 5,839.70 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 10 | TON | 1,000.00 | 10,000.00 | 980.00 | 9,800.00 | 955.42 | 9,554.20 | 1,000.00 | 10,000.00 | | 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,531 | SQYD | 2.00 | 3,062.00 | 3.00 | 4,593.00 | 2.03 | 3,107.93 | 1.65 | 2,526.15 | | 0037 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 236 | SQYD | 2.50 | 590.00 | 17.00 | 4,012.00 | 2.51 | 592.36 | 1.65 | 389.40 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 41,680.37 | 41,680.37 | 25,000.00 | 25,000.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.308 | MILE | 1,300.00 | 1,700.40 | 1,752.37 | 2,292.10 | 1,196.11 | 1,564.51 | 1,615.00 | 2,112.42 | | 0040 | 726-01-00100 | Bedding Material | 15.4 | CUYD | 150.00 | 2,310.00 | 125.00 | 1,925.00 | 162.86 | 2,508.04 | 275.00 | 4,235.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 135,000.00 | 135,000.00 | 23,619.18 | 23,619.18 | 160,000.00 | 160,000.00 | | 0042 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 120.00 | 1,200.00 | 70.00 | 700.00 | 119.43 | 1,194.30 | 29.00 | 290.00 | | 0043 | 729-02-00100 | Sign (Type B) | 106 | SQFT | 40.00 | 4,240.00 | 43.00 | 4,558.00 | 44.19 | 4,684.14 | 40.00 | 4,240.00 | | 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 150.00 | 300.00 | 293.00 | 586.00 | 161.23 | 322.46 | 86.00 | 172.00 | | 0045 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 225.00 | 4,050.00 | 267.00 | 4,806.00 | 238.86 | 4,299.48 | 230.00 | 4,140.00 | | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 165 | EACH | 8.00 | 1,320.00 | 12.00 | 1,980.00 | 7.17 | 1,183.05 | 7.00 | 1,155.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.539 | MILE | 6,000.00 | 15,234.00 | 6,552.58 | 16,637.00 | 6,690.60 | 16,987.43 | 6,500.00 | 16,503.50 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.076 | MILE | 3,000.00 | 228.00 | 14,036.40 | 1,066.77 | 3,394.21 | 257.96 | 3,250.00 | 247.00 | | 0049 | 735-01-00100 | Mailboxes | 3 | EACH | 1.00 | 3.00 | 1.11 | 3.33 | 1.19 | 3.57 | 156.00 | 468.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 1,100.00 | 3,300.00 | 250.20 | 750.60 | 1,194.28 | 3,582.84 | 180.00 | 540.00 | | 0051 | 739-01-00100 | Hydro-Seeding | 5.5 | ACRE | 3,000.00 | 16,500.00 | 2,930.00 | 16,115.00 | 3,260.38 | 17,932.09 | 3,110.00 | 17,105.00 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 20,000.00 | 20,000.00 | 13,665.44 | 13,665.44 | 40,000.00 | 40,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,378,721.33 | | 1,425,163.86 | | 1,585,274.12 | | 1,613,432.38 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Womack And Sons Constr. Group LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5.5 | LUMP | 58,775.00 | 58,775.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 52,800.00 | 52,800.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 6,715 | SQYD | 7.00 | 47,005.00 | | 0004 | 202-02-12000 | Removal of Fence | 3,450 | LNFT | 3.00 | 10,350.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 18" RCP | 34 | LNFT | 86.00 | 2,924.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 24" x 36" CMPA | 50 | LNFT | 58.50 | 2,925.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) Existing 30" x 18" CMPA | 48 | LNFT | 44.00 | 2,112.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 12" CMP | 98 | LNFT | 22.00 | 2,156.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 15" CMP | 30 | LNFT | 70.00 | 2,100.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 15" RCP | 30 | LNFT | 98.00 | 2,940.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) Existing 6" CMP | 20 | LNFT | 146.00 | 2,920.00 | | 0012 | 202-07-00100 | Plugging Existing Water Wells | 1 | EACH | 38,550.00 | 38,550.00 | | 0013 | 203-01-00100 | General Excavation | 12,457 | CUYD | 22.00 | 274,054.00 | | 0014 | 203-03-00100 | Embankment | 8,253 | CUYD | 22.00 | 181,566.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 154.00 | 2,002.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 4,855 | LNFT | 3.00 | 14,565.00 | | 0017 | 302-02-08510 | Class II Base Course (8-1/2" Thick) (Soil Cement) | 10,458.1 | SQYD | 21.70 | 226,940.77 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 210 | CUYD | 40.00 | 8,400.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 225.00 | 11,250.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 1,896.3 | TON | 263.00 | 498,726.90 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 320.00 | 12,800.00 | | 0022 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 316 | INLF | 4.50 | 1,422.00 | | 0023 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 64 | LNFT | 252.00 | 16,128.00 | | 0024 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 120 | LNFT | 138.00 | 16,560.00 | | 0025 | 702-05-01000 | Cross Drain End Treatment (1 Barrel, 24" RCP or 30" CMP) Sacked Revetment Toe Wall | 1 | EACH | 5,900.00 | 5,900.00 | | 0026 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 2,721 | LNFT | 17.70 | 48,161.70 | | 0027 | 705-04-00100 | Single Swinging Driveway Gates | 3 | EACH | 1,540.00 | 4,620.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 450.00 | 6,300.00 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 450.00 | 6,300.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 23 | SQYD | 240.00 | 5,520.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 28,900.00 | 28,900.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.308 | MILE | 960.00 | 1,255.68 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.152 | MILE | 960.00 | 145.92 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.078 | MILE | 1,280.00 | 6,499.84 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 10 | TON | 1,030.00 | 10,300.00 | | 0036 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,531 | SQYD | 2.00 | 3,062.00 | | 0037 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 236 | SQYD | 2.70 | 637.20 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,900.00 | 10,900.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.308 | MILE | 4,325.00 | 5,657.10 | | 0040 | 726-01-00100 | Bedding Material | 15.4 | CUYD | 200.00 | 3,080.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 50,750.00 | 50,750.00 | | 0042 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 128.00 | 1,280.00 | | 0043 | 729-02-00100 | Sign (Type B) | 106 | SQFT | 47.50 | 5,035.00 | | 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 193.00 | 386.00 | | 0045 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 18 | EACH | 256.00 | 4,608.00 | | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 165 | EACH | 7.70 | 1,270.50 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.539 | MILE | 7,200.00 | 18,280.80 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.076 | MILE | 3,500.00 | 266.00 | | 0049 | 735-01-00100 | Mailboxes | 3 | EACH | 1.00 | 3.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 1,280.00 | 3,840.00 | | 0051 | 739-01-00100 | Hydro-Seeding | 5.5 | ACRE | 3,500.00 | 19,250.00 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,700.00 | 18,700.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,760,880.41 |
|