Proposal:H.014523.6
Parish:Lafourche
Routes:LA 20
Description:LA 20: ST. PATRICK ST - LA 304
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,748,140.90
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | LA Contracting Enterprise, L.L.C. | $4,167,014.22 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,279,292.49 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,590,699.97 |
| 4 | 73475 | Madden Gulf Coast, LLC | $4,647,120.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - LA Contracting Enterprise, L.L.C. | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.165 | LUMP | 110,000.00 | 110,000.00 | 13,500.00 | 13,500.00 | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 13,500.00 | 13,500.00 | 40,000.00 | 40,000.00 | 13,000.00 | 13,000.00 | | 0003 | 202-02-00020 | Removal of Brick Drives | 171 | SQYD | 31.00 | 5,301.00 | 39.00 | 6,669.00 | 25.00 | 4,275.00 | 22.00 | 3,762.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,169.1 | SQYD | 21.00 | 24,551.10 | 34.00 | 39,749.40 | 20.00 | 23,382.00 | 24.00 | 28,058.40 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,035 | SQYD | 20.00 | 60,700.00 | 34.00 | 103,190.00 | 30.00 | 91,050.00 | 22.00 | 66,770.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 501 | LNFT | 17.00 | 8,517.00 | 10.50 | 5,260.50 | 14.50 | 7,264.50 | 9.00 | 4,509.00 | | 0007 | 203-01-00100 | General Excavation | 586 | CUYD | 145.00 | 84,970.00 | 57.00 | 33,402.00 | 65.00 | 38,090.00 | 58.00 | 33,988.00 | | 0008 | 203-03-00100 | Embankment | 2,870 | CUYD | 90.00 | 258,300.00 | 20.00 | 57,400.00 | 55.00 | 157,850.00 | 95.00 | 272,650.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 3,638 | LNFT | 2.25 | 8,185.50 | 2.95 | 10,732.10 | 2.50 | 9,095.00 | 2.50 | 9,095.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 10,559.9 | TON | 144.00 | 1,520,625.60 | 155.00 | 1,636,784.50 | 148.00 | 1,562,865.20 | 128.00 | 1,351,667.20 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 859.1 | TON | 230.00 | 197,593.00 | 197.00 | 169,242.70 | 175.00 | 150,342.50 | 236.00 | 202,747.60 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 36,003 | SQYD | 2.65 | 95,407.95 | 3.50 | 126,010.50 | 4.50 | 162,013.50 | 3.50 | 126,010.50 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,945 | CUYD | 0.01 | -19.45 | 0.01 | -19.45 | 0.00 | 0.00 | 0.01 | -19.45 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 602 | SQYD | 130.00 | 78,260.00 | 121.00 | 72,842.00 | 120.00 | 72,240.00 | 145.00 | 87,290.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 126,264 | INLF | 0.65 | 82,071.60 | 0.01 | 1,262.64 | 0.65 | 82,071.60 | 0.46 | 58,081.44 | | 0017 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 688 | LNFT | 121.00 | 83,248.00 | 176.00 | 121,088.00 | 190.00 | 130,720.00 | 135.00 | 92,880.00 | | 0018 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,592 | LNFT | 144.00 | 229,248.00 | 188.00 | 299,296.00 | 200.00 | 318,400.00 | 160.00 | 254,720.00 | | 0019 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 1,358 | LNFT | 255.00 | 346,290.00 | 256.00 | 347,648.00 | 300.00 | 407,400.00 | 285.00 | 387,030.00 | | 0020 | 701-07-00600 | Yard Drain Pipe (15") | 22 | LNFT | 60.00 | 1,320.00 | 176.00 | 3,872.00 | 80.00 | 1,760.00 | 66.00 | 1,452.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 22 | EACH | 4,600.00 | 101,200.00 | 6,250.00 | 137,500.00 | 5,850.00 | 128,700.00 | 5,100.00 | 112,200.00 | | 0022 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 6,200.00 | 68,200.00 | 8,000.00 | 88,000.00 | 7,500.00 | 82,500.00 | 6,900.00 | 75,900.00 | | 0023 | 702-03-00300 | Catch Basins (CB-04) | 3 | EACH | 2,700.00 | 8,100.00 | 6,600.00 | 19,800.00 | 4,000.00 | 12,000.00 | 3,000.00 | 9,000.00 | | 0024 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 400 | LNFT | 45.00 | 18,000.00 | 68.00 | 27,200.00 | 52.00 | 20,800.00 | 60.00 | 24,000.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,200.00 | 16,800.00 | 4,000.00 | 16,000.00 | 3,650.00 | 14,600.00 | 3,500.00 | 14,000.00 | | 0026 | 706-01-00100 | Concrete Walk (4" Thick) | 398.3 | SQYD | 102.00 | 40,626.60 | 74.00 | 29,474.20 | 85.00 | 33,855.50 | 111.00 | 44,211.30 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 2,802 | SQYD | 83.00 | 232,566.00 | 91.00 | 254,982.00 | 123.50 | 346,047.00 | 92.00 | 257,784.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 78,000.00 | 78,000.00 | 170,000.00 | 170,000.00 | 200,000.00 | 200,000.00 | 285,000.00 | 285,000.00 | | 0029 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 224 | LNFT | 0.30 | 67.20 | 0.30 | 67.20 | 0.25 | 56.00 | 0.25 | 56.00 | | 0030 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.598 | MILE | 560.00 | 3,134.88 | 100.00 | 559.80 | 375.00 | 2,099.25 | 400.00 | 2,239.20 | | 0031 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.564 | MILE | 680.00 | 1,063.52 | 684.00 | 1,069.78 | 630.00 | 985.32 | 60.00 | 93.84 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.824 | MILE | 1,160.00 | 24,155.84 | 1,025.00 | 21,344.60 | 950.00 | 19,782.80 | 900.00 | 18,741.60 | | 0033 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 1 | EACH | 29.00 | 29.00 | 350.00 | 350.00 | 26.50 | 26.50 | 25.00 | 25.00 | | 0034 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 2,000.00 | 2,000.00 | 3,170.00 | 3,170.00 | 3,000.00 | 3,000.00 | 2,800.00 | 2,800.00 | | 0035 | 717-01-00100 | Seeding | 1 | LB | 50.00 | 50.00 | 32.50 | 32.50 | 150.00 | 150.00 | 30.00 | 30.00 | | 0036 | 718-01-00100 | Fertilizer | 1 | LB | 1.50 | 1.50 | 32.50 | 32.50 | 150.00 | 150.00 | 30.00 | 30.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.592 | MILE | 515.00 | 2,879.88 | 342.00 | 1,912.46 | 1,000.00 | 5,592.00 | 1,000.00 | 5,592.00 | | 0038 | 726-01-00100 | Bedding Material | 425.1 | CUYD | 165.00 | 70,141.50 | 91.00 | 38,684.10 | 85.00 | 36,133.50 | 185.00 | 78,643.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 81,000.00 | 81,000.00 | 260,000.00 | 260,000.00 | 245,000.00 | 245,000.00 | 450,000.00 | 450,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 107.00 | 428.00 | 108.00 | 432.00 | 100.00 | 400.00 | 95.00 | 380.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 679 | EACH | 7.00 | 4,753.00 | 7.00 | 4,753.00 | 6.00 | 4,074.00 | 6.00 | 4,074.00 | | 0042 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 229 | LNFT | 17.00 | 3,893.00 | 17.00 | 3,893.00 | 15.00 | 3,435.00 | 15.00 | 3,435.00 | | 0043 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 5.598 | MILE | 6,200.00 | 34,707.60 | 5,670.00 | 31,740.66 | 5,100.00 | 28,549.80 | 5,000.00 | 27,990.00 | | 0044 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.042 | MILE | 22,600.00 | 949.20 | 22,800.00 | 957.60 | 19,500.00 | 819.00 | 20,000.00 | 840.00 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.78 | MILE | 1,700.00 | 1,326.00 | 1,700.00 | 1,326.00 | 1,500.00 | 1,170.00 | 1,500.00 | 1,170.00 | | 0046 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.026 | MILE | 17,000.00 | 442.00 | 17,000.00 | 442.00 | 17,500.00 | 455.00 | 15,000.00 | 390.00 | | 0047 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 565.00 | 565.00 | 570.00 | 570.00 | 500.00 | 500.00 | 500.00 | 500.00 | | 0048 | 735-01-00100 | Mailboxes | 50 | EACH | 56.00 | 2,800.00 | 40.00 | 2,000.00 | 1.00 | 50.00 | 35.00 | 1,750.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 36 | EACH | 113.00 | 4,068.00 | 256.00 | 9,216.00 | 210.00 | 7,560.00 | 225.00 | 8,100.00 | | 0050 | 735-03-00100 | Mailbox Supports (Double) | 7 | EACH | 170.00 | 1,190.00 | 398.00 | 2,786.00 | 290.00 | 2,030.00 | 350.00 | 2,450.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 11,500.00 | 11,500.00 | 60,000.00 | 60,000.00 | 21,000.00 | 21,000.00 | | 0052 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 684.8 | CUYD | 164.00 | 112,307.20 | 114.00 | 78,067.20 | 75.00 | 51,360.00 | 184.00 | 126,003.20 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,167,014.22 | | 4,279,292.49 | | 4,590,699.97 | | 4,647,120.33 |
|