Proposal:H.014218.6
Parish:Webster
Routes:LA 2A
Description:LA 2A: THORNY BRANCH & INDIAN CREEK BRS
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES AND RELATED WORK.
Estimated Construction Cost:$5,152,231.70
| Rank | License | Bidder | Construction Bid |
| 1 | 71454 | Chief Bridge & Concrete LLC | $4,218,030.55 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $4,683,345.16 |
| 3 | 49239 | WL Bass Construction Inc. | $5,479,051.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Chief Bridge & Concrete LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.7 | LUMP | 145,000.00 | 145,000.00 | 300,000.00 | 300,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 7,400.00 | 7,400.00 | 8,000.00 | 8,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,395 | SQYD | 15.00 | 20,925.00 | 5.00 | 6,975.00 | 7.00 | 9,765.00 | | 0004 | 202-02-04501 | Removal of Bridge Removal of bridge RN 019190 (STA. 108+10.50; 24' X 67' COPCSS) | 1,368 | LUMP | 70,000.00 | 70,000.00 | 100,000.00 | 100,000.00 | 175,000.00 | 175,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Removal of Bridge RN 019210 (STA. 210+20.11; 24' X 152' COPCSS) | 3,648 | LUMP | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | | 0006 | 202-02-12000 | Removal of Fence | 424 | LNFT | 8.00 | 3,392.00 | 4.00 | 1,696.00 | 2.00 | 848.00 | | 0007 | 202-02-12020 | Removal of Fence (Chain Link) | 322 | LNFT | 11.00 | 3,542.00 | 4.00 | 1,288.00 | 2.00 | 644.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 817 | LNFT | 30.00 | 24,510.00 | 7.00 | 5,719.00 | 10.00 | 8,170.00 | | 0009 | 203-02-00100 | Drainage Excavation | 2,861 | CUYD | 13.00 | 37,193.00 | 26.00 | 74,386.00 | 24.00 | 68,664.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 120,000.00 | 120,000.00 | 160,000.00 | 160,000.00 | 220,000.00 | 220,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 200.00 | 2,200.00 | 230.00 | 2,530.00 | 250.00 | 2,750.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 2,449 | LNFT | 3.75 | 9,183.75 | 7.00 | 17,143.00 | 3.50 | 8,571.50 | | 0013 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,229.3 | SQYD | 114.28 | 140,484.40 | 90.00 | 110,637.00 | 65.00 | 79,904.50 | | 0014 | 304-01-00100 | Lime | 8.72 | TON | 420.00 | 3,662.40 | 700.00 | 6,104.00 | 500.00 | 4,360.00 | | 0015 | 304-05-00100 | Lime Treatment (Type E) | 615 | SQYD | 25.00 | 15,375.00 | 15.00 | 9,225.00 | 8.00 | 4,920.00 | | 0016 | 401-01-00100 | Aggregate Surface Course (Net Section) | 8.3 | CUYD | 160.00 | 1,328.00 | 500.00 | 4,150.00 | 200.00 | 1,660.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 965.8 | TON | 210.00 | 202,818.00 | 265.00 | 255,937.00 | 280.00 | 270,424.00 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 244.6 | TON | 240.00 | 58,704.00 | 300.00 | 73,380.00 | 330.00 | 80,718.00 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 2,608 | SQYD | 15.00 | 39,120.00 | 10.00 | 26,080.00 | 35.00 | 91,280.00 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -159 | CUYD | 0.10 | -15.90 | 0.01 | -1.59 | 1.00 | -159.00 | | 0021 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 164 | SQYD | 192.00 | 31,488.00 | 300.00 | 49,200.00 | 88.00 | 14,432.00 | | 0022 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 7,666 | INLF | 0.75 | 5,749.50 | 1.00 | 7,666.00 | 4.00 | 30,664.00 | | 0023 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 408 | LNFT | 6.75 | 2,754.00 | 20.00 | 8,160.00 | 8.00 | 3,264.00 | | 0024 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 544 | LNFT | 2.00 | 1,088.00 | 2.50 | 1,360.00 | 1.00 | 544.00 | | 0025 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 372 | LNFT | 125.00 | 46,500.00 | 120.00 | 44,640.00 | 137.00 | 50,964.00 | | 0026 | 701-04-02020 | Storm Drain Pipe Arch (Outfall) (18" Equiv. CMPA) | 130 | LNFT | 215.00 | 27,950.00 | 140.00 | 18,200.00 | 137.00 | 17,810.00 | | 0027 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 20 | LNFT | 160.00 | 3,200.00 | 200.00 | 4,000.00 | 135.00 | 2,700.00 | | 0028 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 7,000.00 | 49,000.00 | 6,000.00 | 42,000.00 | 7,000.00 | 49,000.00 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 275.2 | LNFT | 40.00 | 11,008.00 | 33.00 | 9,081.60 | 34.00 | 9,356.80 | | 0030 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 125.00 | 25,000.00 | 115.00 | 23,000.00 | 120.00 | 24,000.00 | | 0031 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 4 | EACH | 4,000.00 | 16,000.00 | 3,000.00 | 12,000.00 | 3,400.00 | 13,600.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,000.00 | 16,000.00 | 3,400.00 | 13,600.00 | 3,100.00 | 12,400.00 | | 0033 | 705-01-00100 | Barbed Wire Fence | 562 | LNFT | 18.00 | 10,116.00 | 20.00 | 11,240.00 | 10.00 | 5,620.00 | | 0034 | 708-01-00100 | Right-of-Way Monument | 19 | EACH | 600.00 | 11,400.00 | 600.00 | 11,400.00 | 300.00 | 5,700.00 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 19 | EACH | 200.00 | 3,800.00 | 200.00 | 3,800.00 | 200.00 | 3,800.00 | | 0036 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,121 | SQYD | 110.00 | 233,310.00 | 140.00 | 296,940.00 | 121.00 | 256,641.00 | | 0037 | 711-04-00100 | Geotextile Fabric | 2,121 | SQYD | 2.50 | 5,302.50 | 2.00 | 4,242.00 | 3.00 | 6,363.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 76,000.00 | 76,000.00 | 70,000.00 | 70,000.00 | 250,000.00 | 250,000.00 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 2.5 | TON | 2,000.00 | 5,000.00 | 2,600.00 | 6,500.00 | 850.00 | 2,125.00 | | 0040 | 717-01-00100 | Seeding | 51 | LB | 20.00 | 1,020.00 | 12.00 | 612.00 | 13.00 | 663.00 | | 0041 | 718-01-00100 | Fertilizer | 1,699 | LB | 0.90 | 1,529.10 | 1.25 | 2,123.75 | 1.00 | 1,699.00 | | 0042 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,043 | SQYD | 5.00 | 5,215.00 | 2.00 | 2,086.00 | 3.00 | 3,129.00 | | 0043 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 234 | SQYD | 4.10 | 959.40 | 2.00 | 468.00 | 3.00 | 702.00 | | 0044 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 454 | SQYD | 4.10 | 1,861.40 | 2.00 | 908.00 | 4.00 | 1,816.00 | | 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | | 0046 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.32 | MILE | 1,000.00 | 320.00 | 500.00 | 160.00 | 1,000.00 | 320.00 | | 0047 | 726-01-00100 | Bedding Material | 45.4 | CUYD | 160.00 | 7,264.00 | 250.00 | 11,350.00 | 145.00 | 6,583.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 425,000.00 | 425,000.00 | 430,000.00 | 430,000.00 | 540,000.00 | 540,000.00 | | 0049 | 729-01-00100 | Sign (Type A) | 14.9 | SQFT | 60.00 | 894.00 | 25.00 | 372.50 | 35.00 | 521.50 | | 0050 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 100.00 | 800.00 | 100.00 | 800.00 | | 0051 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 150.00 | 450.00 | 250.00 | 750.00 | 200.00 | 600.00 | | 0052 | 731-02-00100 | Reflectorized Raised Pavement Markers | 66 | EACH | 6.00 | 396.00 | 6.00 | 396.00 | 10.00 | 660.00 | | 0053 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 16 | LNFT | 20.00 | 320.00 | 20.00 | 320.00 | 1.50 | 24.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.863 | MILE | 6,000.00 | 5,178.00 | 6,000.00 | 5,178.00 | 5,000.00 | 4,315.00 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.137 | MILE | 6,000.00 | 822.00 | 3,200.00 | 438.40 | 5,000.00 | 685.00 | | 0056 | 735-01-00100 | Mailboxes | 1 | EACH | 1,500.00 | 1,500.00 | 30.00 | 30.00 | 25.00 | 25.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 500.00 | 500.00 | 255.00 | 255.00 | 250.00 | 250.00 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 52,800.00 | 52,800.00 | 80,000.00 | 80,000.00 | 250,000.00 | 250,000.00 | | 0059 | 804-01-00400 | Precast Concrete Piles (18") | 3,720 | LNFT | 150.00 | 558,000.00 | 200.00 | 744,000.00 | 270.00 | 1,004,400.00 | | 0060 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 8,500.00 | 8,500.00 | 8,500.00 | 8,500.00 | 40,000.00 | 40,000.00 | | 0061 | 804-18-00100 | Vibration Monitoring | 10 | DAY | 750.00 | 7,500.00 | 1,450.00 | 14,500.00 | 385.00 | 3,850.00 | | 0062 | 805-01-00100 | Class A1 Concrete (Slab Span) | 384.48 | CUYD | 1,400.00 | 538,272.00 | 1,350.00 | 519,048.00 | 350.00 | 134,568.00 | | 0063 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 120.08 | CUYD | 2,200.00 | 264,176.00 | 2,400.00 | 288,192.00 | 350.00 | 42,028.00 | | 0064 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,303 | SQFT | 3.00 | 9,909.00 | 1.50 | 4,954.50 | 2.00 | 6,606.00 | | 0065 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,303 | SQFT | 3.00 | 9,909.00 | 3.00 | 9,909.00 | 1.00 | 3,303.00 | | 0066 | 806-01-00100 | Deformed Reinforcing Steel | 99,624 | LB | 2.00 | 199,248.00 | 1.50 | 149,436.00 | 5.00 | 498,120.00 | | 0067 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 480 | LNFT | 220.00 | 105,600.00 | 200.00 | 96,000.00 | 300.00 | 144,000.00 | | 0068 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 125.00 | 320,000.00 | 110.00 | 281,600.00 | 170.00 | 435,200.00 | | 0069 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 312 | SFIN | 100.00 | 31,200.00 | 100.00 | 31,200.00 | 135.00 | 42,120.00 | | 0070 | 815-03-00300 | Joint Seal (Poured) | 504 | LNFT | 25.00 | 12,600.00 | 20.00 | 10,080.00 | 15.00 | 7,560.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,218,030.55 | | 4,683,345.16 | | 5,479,051.30 |
|