Proposal:H.014058.6
Parish:Livingston
Routes:LA 16
Description:LA 16: CURVE REALIGNMENT AT GOURDON LANE
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, MILLING ASPHALT CONCRETE, DRAINAGE STRUCTURES, AND RELATED WORK.
Estimated Construction Cost:$1,388,903.48
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,517,571.75 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,596,800.44 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.7 | LUMP | 92,000.00 | 92,000.00 | 90,000.00 | 90,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,000.00 | 7,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 280 | SQYD | 28.00 | 7,840.00 | 35.00 | 9,800.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 4,234.9 | SQYD | 14.00 | 59,288.60 | 19.00 | 80,463.10 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 41 | SQYD | 49.00 | 2,009.00 | 50.00 | 2,050.00 | | 0006 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 27.00 | 324.00 | 25.00 | 300.00 | | 0007 | 203-01-00100 | General Excavation | 2,837 | CUYD | 22.00 | 62,414.00 | 40.00 | 113,480.00 | | 0008 | 203-03-00100 | Embankment | 9,161 | CUYD | 38.00 | 348,118.00 | 58.00 | 531,338.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,904 | LNFT | 2.50 | 7,260.00 | 2.10 | 6,098.40 | | 0010 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 5,157.4 | SQYD | 45.00 | 232,083.00 | 70.00 | 361,018.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 180.00 | 45,000.00 | 250.00 | 62,500.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 1,637.3 | TON | 130.00 | 212,849.00 | 250.00 | 409,325.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 226.9 | TON | 245.00 | 55,590.50 | 400.00 | 90,760.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 4,235 | SQYD | 9.00 | 38,115.00 | 15.00 | 63,525.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -706 | CUYD | 0.10 | -70.60 | 0.01 | -7.06 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 288 | INLF | 9.00 | 2,592.00 | 10.00 | 2,880.00 | | 0017 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 160 | LNFT | 242.00 | 38,720.00 | 200.00 | 32,000.00 | | 0018 | 701-05-01066 | Side Drain Pipe (24" RCP) | 50 | LNFT | 271.00 | 13,550.00 | 200.00 | 10,000.00 | | 0019 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 158 | LNFT | 240.00 | 37,920.00 | 160.00 | 25,280.00 | | 0020 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 41 | LNFT | 290.00 | 11,890.00 | 180.00 | 7,380.00 | | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 199.2 | LNFT | 0.00 | 0.00 | 100.00 | 19,920.00 | | 0022 | 706-02-00200 | Concrete Drive (6" Thick) | 80 | SQYD | 186.00 | 14,880.00 | 200.00 | 16,000.00 | | 0023 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 210.00 | 2,100.00 | 46.00 | 460.00 | | 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 184.00 | 1,840.00 | 74.00 | 740.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 72,000.00 | 72,000.00 | 258,000.00 | 258,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.8 | MILE | 1,053.00 | 1,895.40 | 700.00 | 1,260.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.3 | MILE | 1,264.00 | 4,171.20 | 1,500.00 | 4,950.00 | | 0028 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | | 0029 | 724-01-00100 | Rumble Strips (Centerline) | 0.26 | MILE | 365.00 | 94.90 | 400.00 | 104.00 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.52 | MILE | 365.00 | 189.80 | 400.00 | 208.00 | | 0031 | 726-01-00100 | Bedding Material | 46.2 | CUYD | 255.00 | 11,781.00 | 50.00 | 2,310.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 87,000.00 | 87,000.00 | 258,000.00 | 258,000.00 | | 0033 | 729-01-00100 | Sign (Type A) | 81 | SQFT | 36.00 | 2,916.00 | 40.00 | 3,240.00 | | 0034 | 729-01-00200 | Mounting of Sign (Type A) | 17 | EACH | 16.00 | 272.00 | 20.00 | 340.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 84.00 | 336.00 | 80.00 | 320.00 | | 0036 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 17 | EACH | 255.00 | 4,335.00 | 380.00 | 6,460.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 248 | EACH | 10.50 | 2,604.00 | 8.00 | 1,984.00 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.1 | MILE | 5,800.00 | 6,380.00 | 7,500.00 | 8,250.00 | | 0039 | 735-01-00100 | Mailboxes | 7 | EACH | 31.00 | 217.00 | 35.00 | 245.00 | | 0040 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 260.00 | 1,820.00 | 400.00 | 2,800.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 2.673 | ACRE | 2,150.00 | 5,746.95 | 3,000.00 | 8,019.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 55,000.00 | 55,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,517,571.75 | | 2,596,800.44 |
|