Proposal:H.013243.6
Parish:Iberville
Routes:LA 997
Description:BYU PIGEON PONTOON BR ELEC WINCHES (HBI)
Type Construction:STEEL PIPE PILES, SPAN DRIVE ELECTRIC WINCH SYSTEM, MOVABLE BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$2,024,231.03
| Rank | License | Bidder | Construction Bid |
| 1 | 67770 | Reliant Industrial Solutions L.L.C. | $1,865,579.00 |
| 2 | 00009 | Coastal Contractors, LLC | $2,135,901.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Reliant Industrial Solutions L.L.C. | - 2 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00050 | Removal of Electric Service | 1 | LUMP | 16,250.00 | 16,250.00 | 26,000.00 | 26,000.00 | | 0002 | 202-02-00050 | Removal of Mechanical Winch | 1 | LUMP | 57,500.00 | 57,500.00 | 17,000.00 | 17,000.00 | | 0003 | 202-02-00050 | Removal of Pivot Pier | 1 | LUMP | 35,000.00 | 35,000.00 | 38,000.00 | 38,000.00 | | 0004 | 202-02-40000 | Removal of Timber Piles | 780 | LNFT | 71.00 | 55,380.00 | 84.00 | 65,520.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0006 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 9,000.00 | 18,000.00 | 7,000.00 | 14,000.00 | | 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 340,000.00 | 340,000.00 | 92,000.00 | 92,000.00 | | 0008 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (12"X60') | 780 | LNFT | 97.00 | 75,660.00 | 120.00 | 93,600.00 | | 0009 | 804-03-00600 | Steel Piles (HP 12x74) | 1,360 | LNFT | 160.00 | 217,600.00 | 200.00 | 272,000.00 | | 0010 | 805-01-00900 | Class A1 Concrete (Pivot Pier) | 3.4 | CUYD | 16,750.00 | 56,950.00 | 11,000.00 | 37,400.00 | | 0011 | 806-01-00100 | Deformed Reinforcing Steel | 563 | LB | 10.00 | 5,630.00 | 10.00 | 5,630.00 | | 0012 | 807-01-00100 | Structural Metalwork (Grade 36) (Cable Rub Block Steel) | 852 | LUMP | 37,500.00 | 37,500.00 | 61,000.00 | 61,000.00 | | 0013 | 807-01-00100 | Structural Metalwork (Grade 36) (Platform Tops) | 12,240 | LUMP | 55,000.00 | 55,000.00 | 135,000.00 | 135,000.00 | | 0014 | 807-01-00200 | Structural Metalwork (Grade 50) (Barge Anchors) | 608 | LUMP | 40,500.00 | 40,500.00 | 65,000.00 | 65,000.00 | | 0015 | 807-01-00200 | Structural Metalwork (Grade 50) (Pivot Arm & Barge) | 3,422 | LUMP | 102,500.00 | 102,500.00 | 175,000.00 | 175,000.00 | | 0016 | 807-01-00200 | Structural Metalwork (Grade 50) (Pivot Stub) | 336 | LUMP | 17,500.00 | 17,500.00 | 38,000.00 | 38,000.00 | | 0017 | 807-03-00100 | Structural Metalwork (Access System) | 845 | LUMP | 85,000.00 | 85,000.00 | 47,000.00 | 47,000.00 | | 0018 | 810-04-00100 | Hand Railing | 97.4 | LNFT | 310.00 | 30,194.00 | 311.00 | 30,291.40 | | 0019 | 812-01-00200 | Treated Timber (Coastal Treatment) (Walers) | 1.86 | MFBM | 51,000.00 | 94,860.00 | 26,000.00 | 48,360.00 | | 0020 | 818-02-00100 | UHMW-PE Panels | 17 | SQFT | 915.00 | 15,555.00 | 1,300.00 | 22,100.00 | | 0021 | TS-821-04100 | Pontoon Bridge Machinery (Cable Rigging) | 1 | LUMP | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | | 0022 | TS-821-04100 | Pontoon Bridge Machinery (Pivot Sleeve & Pin) | 1 | LUMP | 11,500.00 | 11,500.00 | 68,000.00 | 68,000.00 | | 0023 | TS-821-04100 | Pontoon Bridge Machinery (Winches) | 1 | LUMP | 122,750.00 | 122,750.00 | 125,000.00 | 125,000.00 | | 0024 | TS-822-09100 | Electrical System (Bridge Electrical) | 1 | LUMP | 156,750.00 | 156,750.00 | 367,000.00 | 367,000.00 | | 0025 | TS-822-09100 | Electrical System (Winch Control System) | 1 | LUMP | 130,000.00 | 130,000.00 | 180,000.00 | 180,000.00 | | 0026 | TS-823-01200 | Bridge Operator's House Renovation (HVAC) | 1 | LUMP | 40,000.00 | 40,000.00 | 38,000.00 | 38,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,865,579.00 | | 2,135,901.40 |
|