Proposal:H.013122.6
Parish:Ouachita
Description:PINE ST. & HARRISON/COLLIER ST. BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, TEMPORARY SHEETING (STEEL), REINFORCED CONCRETE BOX CULVERTS AND RELATED WORK.
Estimated Construction Cost:$2,528,921.66
| Rank | License | Bidder | Construction Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $2,995,855.50 |
| 2 | 49239 | WL Bass Construction Inc. | $3,673,053.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 240,000.00 | 240,000.00 | 135,000.00 | 135,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-00010 | Removal of Removal of Gate (4-Foot Height x 12-Foot Double) | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | | 0004 | 202-02-00010 | Removal of Removal of Gate (6-Foot Height x 9-Foot Single) | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | | 0005 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 883.3 | SQYD | 12.00 | 10,599.60 | 15.00 | 13,249.50 | | 0006 | 202-02-04501 | Removal of Bridge (Sta. 110+00, 24' CLR x 35.6' SKEWED SINGLE SPAN STEEL GIRDER, CONC. DECK & RAILS) | 854 | LUMP | 90,000.00 | 90,000.00 | 65,000.00 | 65,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Sta. 210+00, 64.3' CLR x 21.3' SKEWED SINGLE SPAN STEEL GIRDER, CONC . DECK, & METAL RAILS) | 1,370 | LUMP | 125,000.00 | 125,000.00 | 65,000.00 | 65,000.00 | | 0008 | 202-02-06020 | Removal of Concrete Box Culverts (8 x 3 x 43 LNFT) | 1 | EACH | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0009 | 202-02-06040 | Removal of Concrete Box Headwall (8 x 3 x 15 LNFT) | 1 | EACH | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0010 | 202-02-12020 | Removal of Fence (Chain Link) (3 FOOT HEIGHT) | 43 | LNFT | 5.00 | 215.00 | 10.00 | 430.00 | | 0011 | 202-02-12020 | Removal of Fence (Chain Link) (6-Foot Height) | 51 | LNFT | 5.00 | 255.00 | 10.00 | 510.00 | | 0012 | 202-02-32000 | Removal of Paved Ditches | 532 | SQYD | 40.00 | 21,280.00 | 10.00 | 5,320.00 | | 0013 | 202-02-32120 | Removal of Pipe (Side Drain) (18" CPP) | 12 | LNFT | 60.00 | 720.00 | 35.00 | 420.00 | | 0014 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 94 | LNFT | 60.00 | 5,640.00 | 20.00 | 1,880.00 | | 0015 | 202-02-32120 | Removal of Pipe (Side Drain) (24" RCP) | 46 | LNFT | 80.00 | 3,680.00 | 25.00 | 1,150.00 | | 0016 | 202-02-32120 | Removal of Pipe (Side Drain) (30" RCP) | 77 | LNFT | 60.00 | 4,620.00 | 25.00 | 1,925.00 | | 0017 | 203-02-00100 | Drainage Excavation | 162 | CUYD | 50.00 | 8,100.00 | 50.00 | 8,100.00 | | 0018 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 80,000.00 | 80,000.00 | 125,000.00 | 125,000.00 | | 0019 | 204-02-00100 | Temporary Hay Bales | 16 | EACH | 25.00 | 400.00 | 100.00 | 1,600.00 | | 0020 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 150.00 | 450.00 | 300.00 | 900.00 | | 0021 | 204-06-00100 | Temporary Silt Fencing | 599 | LNFT | 6.00 | 3,594.00 | 5.00 | 2,995.00 | | 0022 | 302-01-00300 | Class II Base Course (Crushed Stone) | 248.6 | CUYD | 170.00 | 42,262.00 | 225.00 | 55,935.00 | | 0023 | 302-03-00100 | Base Drain Outlet | 2 | EACH | 1,200.00 | 2,400.00 | 2,000.00 | 4,000.00 | | 0024 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 200.00 | 20,000.00 | 150.00 | 15,000.00 | | 0025 | 502-01-00100 | Asphalt Concrete | 200.9 | TON | 300.00 | 60,270.00 | 300.00 | 60,270.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 856 | SQYD | 6.00 | 5,136.00 | 30.00 | 25,680.00 | | 0027 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 927 | INLF | 2.00 | 1,854.00 | 2.00 | 1,854.00 | | 0028 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 209 | INLF | 10.00 | 2,090.00 | 2.00 | 418.00 | | 0029 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 39 | LNFT | 250.00 | 9,750.00 | 130.00 | 5,070.00 | | 0030 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 142 | LNFT | 160.00 | 22,720.00 | 100.00 | 14,200.00 | | 0031 | 701-05-01061 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CMP) | 46 | LNFT | 180.00 | 8,280.00 | 120.00 | 5,520.00 | | 0032 | 701-05-02081 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CMP) | 30 | LNFT | 220.00 | 6,600.00 | 130.00 | 3,900.00 | | 0033 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 | | 0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 544 | LNFT | 1.00 | 544.00 | 155.00 | 84,320.00 | | 0035 | 702-02-00900 | Manholes (MH-14X Open) | 1 | EACH | 32,000.00 | 32,000.00 | 20,000.00 | 20,000.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 10,000.00 | 40,000.00 | 10,000.00 | 40,000.00 | | 0037 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 12,000.00 | 24,000.00 | 11,000.00 | 22,000.00 | | 0038 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 | | 0039 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 43 | LNFT | 100.00 | 4,300.00 | 20.00 | 860.00 | | 0040 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 284 | LNFT | 200.00 | 56,800.00 | 30.00 | 8,520.00 | | 0041 | 705-08-03040 | 8-Foot Double Gates for Chain Link Fence (6-Foot Height) | 1 | DBGT | 3,500.00 | 3,500.00 | 2,900.00 | 2,900.00 | | 0042 | 705-08-05000 | 12-Foot Double Gates for Chain Link Fence (4-Foot Height) | 1 | DBGT | 5,000.00 | 5,000.00 | 3,800.00 | 3,800.00 | | 0043 | 706-02-00200 | Concrete Drive (6" Thick) | 31.1 | SQYD | 150.00 | 4,665.00 | 30.00 | 933.00 | | 0044 | 711-04-00100 | Geotextile Fabric | 83 | SQYD | 4.00 | 332.00 | 5.00 | 415.00 | | 0045 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 81 | SQYD | 230.00 | 18,630.00 | 100.00 | 8,100.00 | | 0046 | 726-01-00100 | Bedding Material | 395.2 | CUYD | 160.00 | 63,232.00 | 150.00 | 59,280.00 | | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 280,000.00 | 280,000.00 | 360,000.00 | 360,000.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 250.00 | 2,000.00 | 150.00 | 1,200.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15 | EACH | 20.00 | 300.00 | 30.00 | 450.00 | | 0050 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 0.009 | MILE | 1,100.00 | 9.90 | 30,000.00 | 270.00 | | 0051 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 1,108 | LNFT | 2.00 | 2,216.00 | 10.00 | 11,080.00 | | 0052 | 737-03-00500 | Painted Traffic Striping (Solid Line) (24" Width) | 34 | LNFT | 6.00 | 204.00 | 30.00 | 1,020.00 | | 0053 | 737-04-00006 | Painted Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 400.00 | 400.00 | 600.00 | 600.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 0.22 | ACRE | 10,000.00 | 2,200.00 | 20,000.00 | 4,400.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 42,000.00 | 42,000.00 | 150,000.00 | 150,000.00 | | 0056 | 802-03-00100 | Temporary Sheeting (Steel) | 6,867 | SQFT | 56.00 | 384,552.00 | 65.00 | 446,355.00 | | 0057 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 84.88 | CUYD | 2,300.00 | 195,224.00 | 2,500.00 | 212,200.00 | | 0058 | 805-14-00500 | Reinforced Concrete Box Culverts (Cast-In-Place) (8' x 4') | 42 | LNFT | 1,800.00 | 75,600.00 | 2,000.00 | 84,000.00 | | 0059 | 805-14-02000 | Reinforced Concrete Box Culverts (Cast-In-Place) (10' x 7') | 32 | LNFT | 2,800.00 | 89,600.00 | 2,500.00 | 80,000.00 | | 0060 | 805-15-00500 | Reinforced Concrete Box Culverts (Precast) (8' x 4') | 186 | LNFT | 1,950.00 | 362,700.00 | 2,000.00 | 372,000.00 | | 0061 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 92 | LNFT | 2,750.00 | 253,000.00 | 2,500.00 | 230,000.00 | | 0062 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Concrete: 79.8 CUYD) | 5 | EACH | 38,000.00 | 190,000.00 | 150,000.00 | 750,000.00 | | 0063 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,237 | SQFT | 3.00 | 3,711.00 | 2.00 | 2,474.00 | | 0064 | 806-01-00100 | Deformed Reinforcing Steel | 5,610 | LB | 2.00 | 11,220.00 | 5.00 | 28,050.00 | | 0065 | NS-201-00004 | Arborist Services (Magnolia - Station 110+08 RT) | 1 | EACH | 18,500.00 | 18,500.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,995,855.50 | | 3,673,053.50 |
|