Proposal:H.016607.6
Parish:Calcasieu
Routes:LA 1138-2
Description:LA 1138-2: LAKE ST. - RYAN ST.
Type Construction:FULL DEPTH PATCHING, STRIPING, AND RELATED WORK.
Estimated Construction Cost:$1,366,393.42
| Rank | License | Bidder | Construction Bid |
| 1 | 21982 | Forby Contracting, Inc. | $1,426,055.25 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $1,555,612.87 |
| 3 | 30774 | Progressive Construction Co., LLC | $1,690,853.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Forby Contracting, Inc. | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 782 | LNFT | 20.00 | 15,640.00 | 29.50 | 23,069.00 | 30.00 | 23,460.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 955 | SQYD | 25.00 | 23,875.00 | 40.00 | 38,200.00 | 38.00 | 36,290.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 1,957 | LNFT | 10.00 | 19,570.00 | 10.00 | 19,570.00 | 25.00 | 48,925.00 | | 0004 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 229 | CUYD | 30.00 | 6,870.00 | 105.00 | 24,045.00 | 175.00 | 40,075.00 | | 0005 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 22,176 | INLF | 1.50 | 33,264.00 | 1.10 | 24,393.60 | 2.00 | 44,352.00 | | 0006 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,116 | LNFT | 3.00 | 39,348.00 | 3.10 | 40,659.60 | 4.75 | 62,301.00 | | 0007 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 9,838 | LNFT | 3.00 | 29,514.00 | 3.65 | 35,908.70 | 4.75 | 46,730.50 | | 0008 | 602-03-00100 | Cleaning and Sealing Random Cracks | 356 | LNFT | 5.00 | 1,780.00 | 8.65 | 3,079.40 | 10.00 | 3,560.00 | | 0009 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 221.8 | SQYD | 295.00 | 65,431.00 | 330.00 | 73,194.00 | 265.00 | 58,777.00 | | 0010 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 877.6 | SQYD | 245.00 | 215,012.00 | 240.00 | 210,624.00 | 245.00 | 215,012.00 | | 0011 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 1,946.5 | SQYD | 225.00 | 437,962.50 | 210.00 | 408,765.00 | 225.00 | 437,962.50 | | 0012 | 706-02-00200 | Concrete Drive (6" Thick) | 957.2 | SQYD | 125.00 | 119,650.00 | 110.00 | 105,292.00 | 195.00 | 186,654.00 | | 0013 | 707-01-00100 | Concrete Curb | 1,957 | LNFT | 20.00 | 39,140.00 | 42.50 | 83,172.50 | 30.00 | 58,710.00 | | 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 782 | LNFT | 65.00 | 50,830.00 | 70.00 | 54,740.00 | 85.00 | 66,470.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 120,000.00 | 120,000.00 | 60,000.00 | 60,000.00 | | 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 593 | LNFT | 0.25 | 148.25 | 0.30 | 177.90 | 0.25 | 148.25 | | 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 117 | LNFT | 1.00 | 117.00 | 1.20 | 140.40 | 1.05 | 122.85 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.32 | MILE | 600.00 | 1,992.00 | 715.00 | 2,373.80 | 630.00 | 2,091.60 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.7 | MILE | 900.00 | 1,530.00 | 1,075.00 | 1,827.50 | 945.00 | 1,606.50 | | 0020 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 7,000.00 | 28,000.00 | 5,000.00 | 20,000.00 | 8,997.50 | 35,990.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 155,000.00 | 155,000.00 | 160,000.00 | 160,000.00 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 450 | EACH | 6.00 | 2,700.00 | 7.00 | 3,150.00 | 6.30 | 2,835.00 | | 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 117 | LNFT | 12.00 | 1,404.00 | 14.25 | 1,667.25 | 12.60 | 1,474.20 | | 0024 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 166 | LNFT | 2.25 | 373.50 | 2.60 | 431.60 | 2.40 | 398.40 | | 0025 | 732-02-02100 | Plastic Pavement Striping (Solid Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil) | 3.32 | MILE | 5,800.00 | 19,256.00 | 6,885.00 | 22,858.20 | 6,090.00 | 20,218.80 | | 0026 | 732-02-03040 | Plastic Pavement Striping (Solid Line) (8" Width) (Preformed Tape) (Retroreflectivity Level I) | 0.112 | MILE | 40,000.00 | 4,480.00 | 46,750.00 | 5,236.00 | 42,000.00 | 4,704.00 | | 0027 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 3.32 | MILE | 4,500.00 | 14,940.00 | 5,500.00 | 18,260.00 | 4,725.00 | 15,687.00 | | 0028 | 732-03-03030 | Plastic Pavement Striping (Dotted Line) (8" Width)(3' Length)(Preformed Tape) (Retroreflectivity Level I) | 0.097 | MILE | 38,000.00 | 3,686.00 | 42,000.00 | 4,074.00 | 39,900.00 | 3,870.30 | | 0029 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 500.00 | 1,000.00 | 595.00 | 1,190.00 | 525.00 | 1,050.00 | | 0030 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 600.00 | 1,200.00 | 715.00 | 1,430.00 | 630.00 | 1,260.00 | | 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 400.00 | 7,200.00 | 475.00 | 8,550.00 | 420.00 | 7,560.00 | | 0032 | 732-05-00100 | Removal of Existing Markings | 0.828 | MILE | 6,500.00 | 5,382.00 | 7,665.00 | 6,346.62 | 6,825.00 | 5,651.10 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | | 0034 | NS-602-00001 | Milling Concrete Pavement | 296.8 | SQYD | 75.00 | 22,260.00 | 113.50 | 33,686.80 | 107.50 | 31,906.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,426,055.25 | | 1,555,612.87 | | 1,690,853.00 |
|