Proposal:H.016115.6
Parish:Cameron
Routes:LA 82
Description:LA 82: 0.9 MI E N ISLAND RD - VERMILION
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,017,828.52
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,196,184.17 |
| 2 | 33663 | Glenn Lege Construction LLC | $5,685,093.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 1,019.3 | LNFT | 17.00 | 17,328.10 | 11.04 | 11,253.07 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP, 24" RCP, 30" RCP, 36" RCP | 242 | LNFT | 35.00 | 8,470.00 | 83.63 | 20,238.46 | | 0003 | 203-03-00100 | Embankment | 19 | CUYD | 200.00 | 3,800.00 | 338.38 | 6,429.22 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 140.00 | 1,120.00 | 1,393.80 | 11,150.40 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 202 | LNFT | 13.00 | 2,626.00 | 1,173.12 | 236,970.24 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 22 | CUYD | 200.00 | 4,400.00 | 232.42 | 5,113.24 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 665 | CUYD | 25.00 | 16,625.00 | 98.91 | 65,775.15 | | 0008 | 502-01-00100 | Asphalt Concrete | 16,131.5 | TON | 146.00 | 2,355,199.00 | 173.70 | 2,802,041.55 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 297.6 | TON | 275.00 | 81,840.00 | 254.20 | 75,649.92 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 83,721 | SQYD | 4.75 | 397,674.75 | 3.59 | 300,558.39 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,407 | CUYD | 0.01 | -34.07 | 0.01 | -34.07 | | 0012 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,911 | SQYD | 287.00 | 548,457.00 | 240.72 | 460,015.92 | | 0013 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 120 | LNFT | 475.00 | 57,000.00 | 531.97 | 63,836.40 | | 0014 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 64 | LNFT | 525.00 | 33,600.00 | 521.98 | 33,406.72 | | 0015 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 64 | LNFT | 550.00 | 35,200.00 | 550.61 | 35,239.04 | | 0016 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 575.1 | LNFT | 60.00 | 34,506.00 | 40.65 | 23,377.82 | | 0017 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 90 | LNFT | 180.00 | 16,200.00 | 69.69 | 6,272.10 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 175.00 | 17,500.00 | 145.19 | 14,519.00 | | 0019 | 704-09-00100 | Guard Rail Anchor Block | 4 | EACH | 10,000.00 | 40,000.00 | 12,195.75 | 48,783.00 | | 0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 5,500.00 | 55,000.00 | 4,065.25 | 40,652.50 | | 0021 | 707-04-00100 | Asphalt Concrete Curb | 50 | LNFT | 300.00 | 15,000.00 | 38.18 | 1,909.00 | | 0022 | 710-01-00100 | Flowable Fill | 550 | CUYD | 250.00 | 137,500.00 | 177.26 | 97,493.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 63,139.14 | 63,139.14 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.726 | MILE | 800.00 | 14,980.80 | 464.60 | 8,700.10 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 18.053 | MILE | 1.00 | 18.05 | 464.60 | 8,387.42 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.335 | MILE | 1.00 | 38.34 | 813.05 | 31,168.27 | | 0027 | 724-01-00100 | Rumble Strips (Centerline) | 5.982 | MILE | 1,200.00 | 7,178.40 | 1,161.50 | 6,948.09 | | 0028 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 11.964 | MILE | 1,200.00 | 14,356.80 | 1,161.50 | 13,896.19 | | 0029 | 726-01-00100 | Bedding Material | 68.5 | CUYD | 220.00 | 15,070.00 | 130.90 | 8,966.65 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 242,293.95 | 242,293.95 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 160.00 | 1,280.00 | 87.11 | 696.88 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 170.00 | 2,040.00 | 116.15 | 1,393.80 | | 0033 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,001 | EACH | 10.00 | 10,010.00 | 9.29 | 9,299.29 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,065 | EACH | 7.50 | 7,987.50 | 6.97 | 7,423.05 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.144 | MILE | 6,250.00 | 82,150.00 | 6,155.95 | 80,913.81 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.09 | MILE | 2,300.00 | 14,007.00 | 2,206.85 | 13,439.72 | | 0037 | 732-05-00100 | Removal of Existing Markings | 0.254 | MILE | 7,500.00 | 1,905.00 | 7,549.75 | 1,917.64 | | 0038 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 211 | LNFT | 2.50 | 527.50 | 2.32 | 489.52 | | 0039 | 739-01-00100 | Hydro-Seeding | 0.03 | ACRE | 100,000.00 | 3,000.00 | 29,037.50 | 871.13 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 103,626.00 | 103,626.00 | | 0041 | NS-300-00060 | Geogrid | 205 | SQYD | 13.00 | 2,665.00 | 4.78 | 979.90 | | 0042 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 3,947 | TON | 114.00 | 449,958.00 | 182.39 | 719,893.33 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,196,184.17 | | 5,685,093.95 |
|