Proposal:H.016106.6
Parish:Iberia
Routes:LA 86
Description:LA 86: LA 320 - LA 3242
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH, AND RELATED WORK.
Estimated Construction Cost:$7,474,314.85
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $6,733,413.51 |
| 2 | 33663 | Glenn Lege Construction LLC | $7,347,776.62 |
| 3 | 51821 | Elliott Construction, LLC | $8,325,322.18 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | - 3 - Elliott Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 532 | SQYD | 22.00 | 11,704.00 | 27.18 | 14,459.76 | 35.00 | 18,620.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 2,395 | SQYD | 22.00 | 52,690.00 | 15.76 | 37,745.20 | 20.00 | 47,900.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Preformed Neoprene | 180 | LNFT | 12.50 | 2,250.00 | 35.09 | 6,316.20 | 50.00 | 9,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,925 | SQYD | 32.00 | 61,600.00 | 20.51 | 39,481.75 | 30.00 | 57,750.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 32.00 | 3,200.00 | 14.28 | 1,428.00 | 40.00 | 4,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 458.1 | LNFT | 16.00 | 7,329.60 | 10.45 | 4,787.15 | 18.00 | 8,245.80 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 778 | CUYD | 33.00 | 25,674.00 | 63.88 | 49,698.64 | 55.00 | 42,790.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 42 | EACH | 150.00 | 6,300.00 | 174.23 | 7,317.66 | 150.00 | 6,300.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 625 | LNFT | 8.00 | 5,000.00 | 2.32 | 1,450.00 | 9.00 | 5,625.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,609 | CUYD | 15.00 | 39,135.00 | 63.88 | 166,662.92 | 65.00 | 169,585.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 50.00 | 10,000.00 | 80.09 | 16,018.00 | 100.00 | 20,000.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 23,974.4 | TON | 113.00 | 2,709,107.20 | 133.00 | 3,188,595.20 | 140.00 | 3,356,416.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,799.9 | TON | 196.00 | 352,780.40 | 179.07 | 322,308.09 | 225.00 | 404,977.50 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 78,692 | SQYD | 3.70 | 291,160.40 | 2.90 | 228,206.80 | 4.50 | 354,114.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,128 | CUYD | 0.01 | -61.28 | 0.01 | -61.28 | 0.01 | -61.28 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 2,180 | SQYD | 200.00 | 436,000.00 | 249.65 | 544,237.00 | 250.00 | 545,000.00 | | 0017 | 510-02-00100 | Pavement Widening (10" Minimum Thickness) | 711.1 | SQYD | 90.00 | 63,999.00 | 123.02 | 87,479.52 | 200.00 | 142,220.00 | | 0018 | 510-03-00100 | Pavement Joint Repair | 390 | TON | 420.00 | 163,800.00 | 990.45 | 386,275.50 | 550.00 | 214,500.00 | | 0019 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 168 | LNFT | 12.50 | 2,100.00 | 42.17 | 7,084.56 | 28.00 | 4,704.00 | | 0020 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 168 | LNFT | 6.00 | 1,008.00 | 10.39 | 1,745.52 | 5.50 | 924.00 | | 0021 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,077 | LNFT | 4.75 | 62,115.75 | 4.03 | 52,700.31 | 6.00 | 78,462.00 | | 0022 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 7,852 | LNFT | 4.75 | 37,297.00 | 4.19 | 32,899.88 | 6.00 | 47,112.00 | | 0023 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 4,000.00 | 4,000.00 | 3,479.45 | 3,479.45 | 7,500.00 | 7,500.00 | | 0024 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 3,000.00 | 6,000.00 | 2,494.70 | 4,989.40 | 7,500.00 | 15,000.00 | | 0025 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 11 | EACH | 900.00 | 9,900.00 | 328.25 | 3,610.75 | 500.00 | 5,500.00 | | 0026 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 12,000.00 | 48,000.00 | 2,954.25 | 11,817.00 | 7,500.00 | 30,000.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 42.50 | 3,455.25 | 39.49 | 3,210.54 | 38.00 | 3,089.40 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 165.00 | 12,375.00 | 139.38 | 10,453.50 | 132.00 | 9,900.00 | | 0029 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 7,000.00 | 7,000.00 | 3,934.95 | 3,934.95 | 3,725.00 | 3,725.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 4,750.00 | 9,500.00 | 3,600.65 | 7,201.30 | 3,410.00 | 6,820.00 | | 0031 | 706-02-00200 | Concrete Drive (6" Thick) | 1,924.9 | SQYD | 190.00 | 365,731.00 | 83.28 | 160,305.67 | 200.00 | 384,980.00 | | 0032 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 14.2 | SQYD | 270.00 | 3,834.00 | 90.04 | 1,278.57 | 225.00 | 3,195.00 | | 0033 | 706-04-00110 | Curb Ramps Type 3 | 40.5 | SQYD | 225.00 | 9,112.50 | 230.48 | 9,334.44 | 400.00 | 16,200.00 | | 0034 | 706-04-00110 | Curb Ramps Type 4 | 53.7 | SQYD | 300.00 | 16,110.00 | 205.43 | 11,031.59 | 400.00 | 21,480.00 | | 0035 | 706-04-00110 | Curb Ramps Type 6 | 82.2 | SQYD | 380.00 | 31,236.00 | 207.14 | 17,026.91 | 400.00 | 32,880.00 | | 0036 | 706-04-00110 | Curb Ramps Type 7 | 438.9 | SQYD | 275.00 | 120,697.50 | 210.77 | 92,506.95 | 400.00 | 175,560.00 | | 0037 | 706-04-00110 | Curb Ramps Type 8 | 46.5 | SQYD | 380.00 | 17,670.00 | 218.47 | 10,158.86 | 400.00 | 18,600.00 | | 0038 | 707-01-00100 | Concrete Curb | 100 | LNFT | 60.00 | 6,000.00 | 31.12 | 3,112.00 | 40.00 | 4,000.00 | | 0039 | 707-04-00100 | Asphalt Concrete Curb | 40.5 | LNFT | 275.00 | 11,137.50 | 45.96 | 1,861.38 | 200.00 | 8,100.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 260,316.54 | 260,316.54 | 250,000.00 | 250,000.00 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 657 | LNFT | 0.01 | 6.57 | 0.87 | 571.59 | 2.00 | 1,314.00 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.607 | MILE | 800.00 | 14,885.60 | 787.80 | 14,658.59 | 795.00 | 14,792.57 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.267 | MILE | 1.00 | 11.27 | 696.90 | 7,851.97 | 665.00 | 7,492.56 | | 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 59.754 | MILE | 1.00 | 59.75 | 929.20 | 55,523.42 | 935.00 | 55,869.99 | | 0045 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.405 | MILE | 1,200.00 | 8,886.00 | 1,161.50 | 8,600.91 | 1,100.00 | 8,145.50 | | 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 650,000.00 | 650,000.00 | 364,817.05 | 364,817.05 | 800,000.00 | 800,000.00 | | 0047 | 729-16-00200 | Object Marker Assembly (Type 2) | 48 | EACH | 70.00 | 3,360.00 | 87.11 | 4,181.28 | 85.00 | 4,080.00 | | 0048 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 160.00 | 960.00 | 116.15 | 696.90 | 110.00 | 660.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 919 | EACH | 5.00 | 4,595.00 | 4.65 | 4,273.35 | 7.00 | 6,433.00 | | 0050 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 219 | LNFT | 15.00 | 3,285.00 | 13.94 | 3,052.86 | 12.00 | 2,628.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.771 | MILE | 5,000.00 | 78,855.00 | 4,878.30 | 76,935.67 | 6,380.00 | 100,618.98 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.849 | MILE | 1,500.00 | 4,273.50 | 1,393.80 | 3,970.94 | 2,975.00 | 8,475.78 | | 0053 | 732-05-00100 | Removal of Existing Markings | 0.041 | MILE | 30,000.00 | 1,230.00 | 27,775.00 | 1,138.78 | 5,375.00 | 220.38 | | 0054 | 735-01-00100 | Mailboxes | 154 | EACH | 1.00 | 154.00 | 29.04 | 4,472.16 | 2.00 | 308.00 | | 0055 | 735-02-00100 | Mailbox Supports (Single) | 154 | EACH | 263.00 | 40,502.00 | 290.38 | 44,718.52 | 290.00 | 44,660.00 | | 0056 | 739-01-00100 | Hydro-Seeding | 5.7 | ACRE | 3,500.00 | 19,950.00 | 3,252.20 | 18,537.54 | 3,275.00 | 18,667.50 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 153,621.00 | 153,621.00 | 30,000.00 | 30,000.00 | | 0058 | 741-35-00100 | Adjust Valve or Meter Box | 3 | EACH | 4,000.00 | 12,000.00 | 1,030.71 | 3,092.13 | 2,250.00 | 6,750.00 | | 0059 | 815-03-00200 | Joint Seal (Preformed Silicone) | 180 | LNFT | 175.00 | 31,500.00 | 214.63 | 38,633.40 | 195.00 | 35,100.00 | | 0060 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 75,119 | SQYD | 8.00 | 600,952.00 | 8.62 | 647,525.78 | 7.50 | 563,392.50 | | 0061 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 4 | EACH | 3,000.00 | 12,000.00 | 10,554.50 | 42,218.00 | 9,000.00 | 36,000.00 | | 0062 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 60,000.00 | 60,000.00 | 36,218.60 | 36,218.60 | 45,000.00 | 45,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,733,413.51 | | 7,347,776.62 | | 8,325,322.18 |
|