Proposal:H.015460.6
Parish:Richland
Description:LITTLE ROAD OVER CREEK
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,649,170.25
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $1,292,759.70 |
| 2 | 39613 | Baker Pile Driving and Site Work, LLC | $1,299,708.02 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,505,374.10 |
| 4 | 49239 | WL Bass Construction Inc. | $1,558,667.90 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $1,723,503.10 |
| 6 | 12312 | Gilchrist Construction Company, LLC | $1,802,610.50 |
| 7 | 00044 | Guinn Construction, LLC | $1,842,080.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - Baker Pile Driving and Site Work, LLC | - 3 - Diamond B Construction Co., L.L.C. | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 26,000.00 | 26,000.00 | 16,096.40 | 16,096.40 | 45,000.00 | 45,000.00 | 76,000.00 | 76,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 | 1,569.63 | 1,569.63 | 30,000.00 | 30,000.00 | 2,100.00 | 2,100.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 866.9 | SQYD | 14.00 | 12,136.60 | 11.00 | 9,535.90 | 10.00 | 8,669.00 | 9.00 | 7,802.10 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 054232252913851 (STA. 105+34: 39' x 21' TTRES) | 837 | LUMP | 12,000.00 | 12,000.00 | 31,165.66 | 31,165.66 | 45,000.00 | 45,000.00 | 95,650.00 | 95,650.00 | | 0005 | 203-01-00100 | General Excavation | 2,567 | CUYD | 17.00 | 43,639.00 | 25.30 | 64,945.10 | 20.00 | 51,340.00 | 20.00 | 51,340.00 | | 0006 | 203-02-00100 | Drainage Excavation | 497 | CUYD | 17.00 | 8,449.00 | 32.28 | 16,043.16 | 35.00 | 17,395.00 | 22.00 | 10,934.00 | | 0007 | 203-03-00100 | Embankment | 1,247 | CUYD | 22.00 | 27,434.00 | 84.51 | 105,383.97 | 25.00 | 31,175.00 | 48.00 | 59,856.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 300.00 | 1,500.00 | 280.24 | 1,401.20 | 150.00 | 750.00 | 150.00 | 750.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 826 | LNFT | 5.00 | 4,130.00 | 4.57 | 3,774.82 | 3.00 | 2,478.00 | 4.00 | 3,304.00 | | 0010 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 940.9 | SQYD | 64.00 | 60,217.60 | 43.00 | 40,458.70 | 69.00 | 64,922.10 | 64.00 | 60,217.60 | | 0011 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 950.00 | 3,800.00 | 1,439.89 | 5,759.56 | 1,400.00 | 5,600.00 | 1,500.00 | 6,000.00 | | 0012 | 304-01-00100 | Lime | 13.34 | TON | 500.00 | 6,670.00 | 410.00 | 5,469.40 | 775.00 | 10,338.50 | 450.00 | 6,003.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 940.9 | SQYD | 13.00 | 12,231.70 | 14.00 | 13,172.60 | 11.00 | 10,349.90 | 7.00 | 6,586.30 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 34 | CUYD | 280.00 | 9,520.00 | 173.77 | 5,908.18 | 105.00 | 3,570.00 | 180.00 | 6,120.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 190.7 | TON | 300.00 | 57,210.00 | 421.40 | 80,360.98 | 225.00 | 42,907.50 | 300.00 | 57,210.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 100.6 | TON | 400.00 | 40,240.00 | 448.00 | 45,068.80 | 300.00 | 30,180.00 | 350.00 | 35,210.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 621 | INLF | 4.00 | 2,484.00 | 4.00 | 2,484.00 | 3.00 | 1,863.00 | 1.00 | 621.00 | | 0018 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 34 | LNFT | 140.00 | 4,760.00 | 92.38 | 3,140.92 | 220.00 | 7,480.00 | 120.00 | 4,080.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 40.00 | 2,000.00 | 38.52 | 1,926.00 | 35.00 | 1,750.00 | 35.00 | 1,750.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 155.00 | 15,500.00 | 105.89 | 10,589.00 | 135.00 | 13,500.00 | 100.00 | 10,000.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 4,500.00 | 13,500.00 | 3,179.56 | 9,538.68 | 3,800.00 | 11,400.00 | 3,000.00 | 9,000.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,800.00 | 4,800.00 | 3,238.68 | 3,238.68 | 4,200.00 | 4,200.00 | 3,000.00 | 3,000.00 | | 0023 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 700.00 | 9,800.00 | 701.04 | 9,814.56 | 600.00 | 8,400.00 | 220.00 | 3,080.00 | | 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 300.00 | 4,200.00 | 281.04 | 3,934.56 | 200.00 | 2,800.00 | 220.00 | 3,080.00 | | 0025 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 541 | SQYD | 100.00 | 54,100.00 | 97.56 | 52,779.96 | 105.00 | 56,805.00 | 114.00 | 61,674.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 541 | SQYD | 4.00 | 2,164.00 | 4.82 | 2,607.62 | 1.00 | 541.00 | 4.00 | 2,164.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 18,857.43 | 18,857.43 | 95,000.00 | 95,000.00 | 80,000.00 | 80,000.00 | | 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 310 | SQYD | 7.00 | 2,170.00 | 2.98 | 923.80 | 2.50 | 775.00 | 2.50 | 775.00 | | 0029 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 113 | SQYD | 7.00 | 791.00 | 4.12 | 465.56 | 5.00 | 565.00 | 5.00 | 565.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 143,000.00 | 143,000.00 | 99,239.44 | 99,239.44 | 145,000.00 | 145,000.00 | 155,800.00 | 155,800.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 155.00 | 620.00 | 284.67 | 1,138.68 | 135.00 | 540.00 | 150.00 | 600.00 | | 0032 | 735-01-00100 | Mailboxes | 1 | EACH | 70.00 | 70.00 | 135.93 | 135.93 | 35.00 | 35.00 | 35.00 | 35.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 230.00 | 230.00 | 277.03 | 277.03 | 300.00 | 300.00 | 150.00 | 150.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.45 | ACRE | 7,500.00 | 10,875.00 | 4,749.00 | 6,886.05 | 2,800.00 | 4,060.00 | 4,000.00 | 5,800.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 20,269.43 | 20,269.43 | 85,000.00 | 85,000.00 | 78,000.00 | 78,000.00 | | 0036 | 804-01-00300 | Precast Concrete Piles (16") | 1,280 | LNFT | 155.00 | 198,400.00 | 148.52 | 190,105.60 | 175.00 | 224,000.00 | 210.00 | 268,800.00 | | 0037 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 7,000.00 | 7,000.00 | 10,588.68 | 10,588.68 | 9,200.00 | 9,200.00 | 35,000.00 | 35,000.00 | | 0038 | 804-18-00100 | Vibration Monitoring | 9 | DAY | 1,500.00 | 13,500.00 | 2,109.85 | 18,988.65 | 1,100.00 | 9,900.00 | 200.00 | 1,800.00 | | 0039 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 1,900.00 | 193,648.00 | 1,495.00 | 152,370.40 | 1,500.00 | 152,880.00 | 350.00 | 35,672.00 | | 0040 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.14 | CUYD | 2,600.00 | 70,564.00 | 2,509.00 | 68,094.26 | 3,850.00 | 104,489.00 | 350.00 | 9,499.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 967 | SQFT | 5.00 | 4,835.00 | 3.18 | 3,075.06 | 3.25 | 3,142.75 | 1.00 | 967.00 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 967 | SQFT | 5.00 | 4,835.00 | 3.18 | 3,075.06 | 3.75 | 3,626.25 | 1.00 | 967.00 | | 0043 | 806-01-00100 | Deformed Reinforcing Steel | 27,282 | LB | 1.90 | 51,835.80 | 1.76 | 48,016.32 | 1.55 | 42,287.10 | 4.95 | 135,045.90 | | 0044 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 230.00 | 18,400.00 | 245.29 | 19,623.20 | 200.00 | 16,000.00 | 299.00 | 23,920.00 | | 0045 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 230.00 | 18,400.00 | 245.29 | 19,623.20 | 390.00 | 31,200.00 | 299.00 | 23,920.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 580 | SQFT | 135.00 | 78,300.00 | 116.89 | 67,796.20 | 102.00 | 59,160.00 | 200.00 | 116,000.00 | | 0047 | 815-03-00300 | Joint Seal (Poured) | 140 | LNFT | 20.00 | 2,800.00 | 28.50 | 3,990.00 | 70.00 | 9,800.00 | 13.00 | 1,820.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,292,759.70 | | 1,299,708.02 | | 1,505,374.10 | | 1,558,667.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Gilchrist Construction Company, LLC | - 7 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 150,000.00 | 150,000.00 | 135,000.00 | 135,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 866.9 | SQYD | 19.00 | 16,471.10 | 10.00 | 8,669.00 | 15.00 | 13,003.50 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 054232252913851 (STA. 105+34: 39' x 21' TTRES) | 837 | LUMP | 200,000.00 | 200,000.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | | 0005 | 203-01-00100 | General Excavation | 2,567 | CUYD | 28.00 | 71,876.00 | 25.00 | 64,175.00 | 35.00 | 89,845.00 | | 0006 | 203-02-00100 | Drainage Excavation | 497 | CUYD | 28.00 | 13,916.00 | 25.00 | 12,425.00 | 35.00 | 17,395.00 | | 0007 | 203-03-00100 | Embankment | 1,247 | CUYD | 80.00 | 99,760.00 | 40.00 | 49,880.00 | 50.00 | 62,350.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 120.00 | 600.00 | 160.00 | 800.00 | 500.00 | 2,500.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 826 | LNFT | 7.00 | 5,782.00 | 3.50 | 2,891.00 | 5.00 | 4,130.00 | | 0010 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 940.9 | SQYD | 45.00 | 42,340.50 | 55.00 | 51,749.50 | 65.00 | 61,158.50 | | 0011 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 1,600.00 | 6,400.00 | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 | | 0012 | 304-01-00100 | Lime | 13.34 | TON | 500.00 | 6,670.00 | 450.00 | 6,003.00 | 1,000.00 | 13,340.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 940.9 | SQYD | 12.00 | 11,290.80 | 10.00 | 9,409.00 | 40.00 | 37,636.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 34 | CUYD | 210.00 | 7,140.00 | 125.00 | 4,250.00 | 250.00 | 8,500.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 190.7 | TON | 300.00 | 57,210.00 | 350.00 | 66,745.00 | 450.00 | 85,815.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 100.6 | TON | 350.00 | 35,210.00 | 350.00 | 35,210.00 | 500.00 | 50,300.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 621 | INLF | 4.00 | 2,484.00 | 7.00 | 4,347.00 | 8.00 | 4,968.00 | | 0018 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 34 | LNFT | 200.00 | 6,800.00 | 270.00 | 9,180.00 | 400.00 | 13,600.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 35.00 | 1,750.00 | 36.00 | 1,800.00 | 60.00 | 3,000.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 100.00 | 10,000.00 | 165.00 | 16,500.00 | | 0021 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,000.00 | 9,000.00 | 3,100.00 | 9,300.00 | 5,000.00 | 15,000.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,000.00 | 3,000.00 | 3,100.00 | 3,100.00 | 6,500.00 | 6,500.00 | | 0023 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 600.00 | 8,400.00 | 625.00 | 8,750.00 | 1,200.00 | 16,800.00 | | 0024 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 200.00 | 2,800.00 | 225.00 | 3,150.00 | 400.00 | 5,600.00 | | 0025 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 541 | SQYD | 120.00 | 64,920.00 | 115.00 | 62,215.00 | 135.00 | 73,035.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 541 | SQYD | 2.50 | 1,352.50 | 9.00 | 4,869.00 | 10.00 | 5,410.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 | | 0028 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 310 | SQYD | 2.00 | 620.00 | 2.75 | 852.50 | 15.00 | 4,650.00 | | 0029 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 113 | SQYD | 2.00 | 226.00 | 6.00 | 678.00 | 25.00 | 2,825.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 178,000.00 | 178,000.00 | 185,000.00 | 185,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 200.00 | 800.00 | | 0032 | 735-01-00100 | Mailboxes | 1 | EACH | 50.00 | 50.00 | 37.00 | 37.00 | 1,000.00 | 1,000.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 150.00 | 150.00 | 300.00 | 300.00 | 1,000.00 | 1,000.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.45 | ACRE | 3,700.00 | 5,365.00 | 3,000.00 | 4,350.00 | 3,500.00 | 5,075.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0036 | 804-01-00300 | Precast Concrete Piles (16") | 1,280 | LNFT | 170.00 | 217,600.00 | 185.00 | 236,800.00 | 180.00 | 230,400.00 | | 0037 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 9,200.00 | 9,200.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | | 0038 | 804-18-00100 | Vibration Monitoring | 9 | DAY | 1,500.00 | 13,500.00 | 8,000.00 | 72,000.00 | 2,000.00 | 18,000.00 | | 0039 | 805-01-00100 | Class A1 Concrete (Slab Span) | 101.92 | CUYD | 1,500.00 | 152,880.00 | 2,000.00 | 203,840.00 | 2,750.00 | 280,280.00 | | 0040 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 27.14 | CUYD | 3,000.00 | 81,420.00 | 4,000.00 | 108,560.00 | 3,850.00 | 104,489.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 967 | SQFT | 1.00 | 967.00 | 3.50 | 3,384.50 | 5.00 | 4,835.00 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 967 | SQFT | 3.00 | 2,901.00 | 4.00 | 3,868.00 | 5.00 | 4,835.00 | | 0043 | 806-01-00100 | Deformed Reinforcing Steel | 27,282 | LB | 1.60 | 43,651.20 | 1.50 | 40,923.00 | 2.50 | 68,205.00 | | 0044 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 225.00 | 18,000.00 | 500.00 | 40,000.00 | 400.00 | 32,000.00 | | 0045 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 275.00 | 22,000.00 | 500.00 | 40,000.00 | 400.00 | 32,000.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 580 | SQFT | 100.00 | 58,000.00 | 140.00 | 81,200.00 | 135.00 | 78,300.00 | | 0047 | 815-03-00300 | Joint Seal (Poured) | 140 | LNFT | 20.00 | 2,800.00 | 35.00 | 4,900.00 | 50.00 | 7,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,723,503.10 | | 1,802,610.50 | | 1,842,080.00 |
|