Proposal:H.015408.6
Parish:Tangipahoa
Description:NORTH BRICKYARD ROAD BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING , MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$1,321,866.00
| Rank | License | Bidder | Construction Bid |
| 1 | 39613 | Baker Pile Driving and Site Work, LLC | $1,139,335.27 |
| 2 | 40312 | GRAY CONSTRUCTION CORP. | $1,179,775.20 |
| 3 | 01516 | Elevate Heavy Civil Construction, LLC | $1,247,993.10 |
| 4 | 28190 | Buck Town Contractors & Co. | $1,276,176.80 |
| 5 | 00009 | Coastal Contractors, LLC | $1,299,831.40 |
| 6 | 00044 | Guinn Construction, LLC | $1,415,831.80 |
| 7 | 12487 | Diamond B Construction Co., L.L.C. | $1,416,569.95 |
| 8 | 12702 | J. CALDARERA & COMPANY, INC. | $1,489,460.90 |
| 9 | 06276 | Barriere Construction Co., LLC | $1,529,192.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Baker Pile Driving and Site Work, LLC | - 2 - GRAY CONSTRUCTION CORP. | - 3 - Elevate Heavy Civil Construction, LLC | - 4 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (est. 0.58 Acres) | 1 | LUMP | 31,214.28 | 31,214.28 | 37,000.00 | 37,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,776.91 | 2,776.91 | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 771.5 | SQYD | 10.70 | 8,255.05 | 13.50 | 10,415.25 | 14.00 | 10,801.00 | 24.00 | 18,516.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 625330308903261 (Sta. 105+13.44; 20' x 57' TTRES) | 1 | LUMP | 29,046.02 | 29,046.02 | 45,300.00 | 45,300.00 | 50,000.00 | 50,000.00 | 82,000.00 | 82,000.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (Cross Drain - 54" Metal) | 47 | LNFT | 84.99 | 3,994.53 | 48.00 | 2,256.00 | 28.00 | 1,316.00 | 30.00 | 1,410.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain - 18" CMP) | 43 | LNFT | 87.14 | 3,747.02 | 42.00 | 1,806.00 | 30.00 | 1,290.00 | 30.00 | 1,290.00 | | 0007 | 203-02-00100 | Drainage Excavation | 460 | CUYD | 35.25 | 16,215.00 | 55.00 | 25,300.00 | 12.00 | 5,520.00 | 24.00 | 11,040.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 43,255.73 | 43,255.73 | 50,000.00 | 50,000.00 | 24,000.00 | 24,000.00 | 21,500.00 | 21,500.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 178.64 | 1,250.48 | 125.00 | 875.00 | 200.00 | 1,400.00 | 100.00 | 700.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 903 | LNFT | 3.77 | 3,404.31 | 2.78 | 2,510.34 | 3.00 | 2,709.00 | 1.00 | 903.00 | | 0011 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 956.2 | SQYD | 56.00 | 53,547.20 | 50.00 | 47,810.00 | 50.00 | 47,810.00 | 57.00 | 54,503.40 | | 0012 | 304-01-00100 | Lime | 13.55 | TON | 384.00 | 5,203.20 | 370.00 | 5,013.50 | 300.00 | 4,065.00 | 350.00 | 4,742.50 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 956 | SQYD | 22.60 | 21,605.60 | 20.00 | 19,120.00 | 5.00 | 4,780.00 | 9.00 | 8,604.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 119.56 | 5,978.00 | 163.00 | 8,150.00 | 234.00 | 11,700.00 | 1.00 | 50.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 197.1 | TON | 203.00 | 40,011.30 | 180.00 | 35,478.00 | 180.00 | 35,478.00 | 206.00 | 40,602.60 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 87 | TON | 248.30 | 21,602.10 | 220.00 | 19,140.00 | 220.00 | 19,140.00 | 252.00 | 21,924.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 141.1 | SQYD | 68.00 | 9,594.80 | 60.00 | 8,466.00 | 60.00 | 8,466.00 | 68.00 | 9,594.80 | | 0018 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 53 | SQYD | 202.50 | 10,732.50 | 180.00 | 9,540.00 | 180.00 | 9,540.00 | 206.00 | 10,918.00 | | 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 419 | INLF | 4.67 | 1,956.73 | 3.15 | 1,319.85 | 3.00 | 1,257.00 | 7.00 | 2,933.00 | | 0020 | 701-01-01103 | Cross Drain Pipe (54" RCP/RPVCP) | 48 | LNFT | 994.02 | 47,712.96 | 600.00 | 28,800.00 | 475.00 | 22,800.00 | 555.00 | 26,640.00 | | 0021 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 56 | LNFT | 240.50 | 13,468.00 | 109.00 | 6,104.00 | 179.00 | 10,024.00 | 167.00 | 9,352.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 48 | LNFT | 96.21 | 4,618.08 | 87.50 | 4,200.00 | 50.00 | 2,400.00 | 1.00 | 48.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 30.00 | 1,125.00 | 25.00 | 937.50 | 34.00 | 1,275.00 | 28.00 | 1,050.00 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 101.94 | 10,194.00 | 90.00 | 9,000.00 | 118.00 | 11,800.00 | 100.00 | 10,000.00 | | 0025 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,116.82 | 9,350.46 | 2,750.00 | 8,250.00 | 3,100.00 | 9,300.00 | 3,150.00 | 9,450.00 | | 0026 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 2,881.70 | 2,881.70 | 2,500.00 | 2,500.00 | 3,175.00 | 3,175.00 | 2,900.00 | 2,900.00 | | 0027 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 737.54 | 8,112.94 | 364.00 | 4,004.00 | 650.00 | 7,150.00 | 200.00 | 2,200.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 231.29 | 2,544.19 | 364.00 | 4,004.00 | 200.00 | 2,200.00 | 400.00 | 4,400.00 | | 0029 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 65 | SQYD | 101.02 | 6,566.30 | 72.00 | 4,680.00 | 179.00 | 11,635.00 | 108.00 | 7,020.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 360 | SQYD | 195.87 | 70,513.20 | 130.00 | 46,800.00 | 99.00 | 35,640.00 | 120.00 | 43,200.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 425 | SQYD | 6.20 | 2,635.00 | 7.50 | 3,187.50 | 5.00 | 2,125.00 | 1.00 | 425.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,617.32 | 20,617.32 | 35,000.00 | 35,000.00 | 29,000.00 | 29,000.00 | 15,800.00 | 15,800.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 227 | SQYD | 6.83 | 1,550.41 | 1.80 | 408.60 | 3.00 | 681.00 | 1.00 | 227.00 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 25 | SQYD | 54.03 | 1,350.75 | 1.80 | 45.00 | 5.00 | 125.00 | 5.00 | 125.00 | | 0035 | 726-01-00100 | Bedding Material | 33.4 | CUYD | 110.00 | 3,674.00 | 190.00 | 6,346.00 | 184.00 | 6,145.60 | 190.00 | 6,346.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 108,085.34 | 108,085.34 | 118,000.00 | 118,000.00 | 124,781.00 | 124,781.00 | 120,000.00 | 120,000.00 | | 0037 | 729-01-00100 | Sign (Type A) | 10.3 | SQFT | 18.00 | 185.40 | 10.00 | 103.00 | 35.00 | 360.50 | 10.00 | 103.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 186.05 | 744.20 | 150.00 | 600.00 | 100.00 | 400.00 | 170.00 | 680.00 | | 0039 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 209.82 | 209.82 | 125.00 | 125.00 | 200.00 | 200.00 | 150.00 | 150.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 15 | LNFT | 170.55 | 2,558.25 | 100.00 | 1,500.00 | 100.00 | 1,500.00 | 110.00 | 1,650.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.085 | MILE | 51,940.00 | 4,414.90 | 5,000.00 | 425.00 | 5,000.00 | 425.00 | 5,700.00 | 484.50 | | 0042 | 735-01-00100 | Mailboxes | 2 | EACH | 59.93 | 119.86 | 50.00 | 100.00 | 50.00 | 100.00 | 50.00 | 100.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 297.05 | 297.05 | 250.00 | 250.00 | 500.00 | 500.00 | 300.00 | 300.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.33 | ACRE | 5,469.00 | 1,804.77 | 7,602.00 | 2,508.66 | 6,500.00 | 2,145.00 | 8,200.00 | 2,706.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,216.16 | 16,216.16 | 12,000.00 | 12,000.00 | 23,000.00 | 23,000.00 | 16,000.00 | 16,000.00 | | 0046 | 804-01-00300 | Precast Concrete Piles (16") | 1,100 | LNFT | 138.88 | 152,768.00 | 130.00 | 143,000.00 | 184.00 | 202,400.00 | 206.00 | 226,600.00 | | 0047 | 805-01-00100 | Class A1 Concrete (Slab Span) | 88.32 | CUYD | 1,443.00 | 127,445.76 | 2,000.00 | 176,640.00 | 2,000.00 | 176,640.00 | 2,200.00 | 194,304.00 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 23.69 | CUYD | 2,562.00 | 60,693.78 | 3,300.00 | 78,177.00 | 4,500.00 | 106,605.00 | 3,200.00 | 75,808.00 | | 0049 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 947 | SQFT | 7.35 | 6,960.45 | 8.00 | 7,576.00 | 3.00 | 2,841.00 | 1.00 | 947.00 | | 0050 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 947 | SQFT | 3.18 | 3,011.46 | 2.00 | 1,894.00 | 4.00 | 3,788.00 | 1.00 | 947.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 23,740 | LB | 1.34 | 31,811.60 | 2.50 | 59,350.00 | 2.00 | 47,480.00 | 1.45 | 34,423.00 | | 0052 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 219.81 | 17,584.80 | 220.00 | 17,600.00 | 275.00 | 22,000.00 | 280.00 | 22,400.00 | | 0053 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 219.81 | 17,584.80 | 220.00 | 17,600.00 | 300.00 | 24,000.00 | 280.00 | 22,400.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 127.19 | 63,595.00 | 80.00 | 40,000.00 | 100.00 | 50,000.00 | 150.00 | 75,000.00 | | 0055 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 24.49 | 2,938.80 | 13.00 | 1,560.00 | 34.00 | 4,080.00 | 48.00 | 5,760.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,139,335.27 | | 1,179,775.20 | | 1,247,993.10 | | 1,276,176.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Coastal Contractors, LLC | - 6 - Guinn Construction, LLC | - 7 - Diamond B Construction Co., L.L.C. | - 8 - J. CALDARERA & COMPANY, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (est. 0.58 Acres) | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 68,000.00 | 68,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 771.5 | SQYD | 33.00 | 25,459.50 | 15.00 | 11,572.50 | 19.00 | 14,658.50 | 25.00 | 19,287.50 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 625330308903261 (Sta. 105+13.44; 20' x 57' TTRES) | 1 | LUMP | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 | 42,000.00 | 42,000.00 | 53,200.00 | 53,200.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (Cross Drain - 54" Metal) | 47 | LNFT | 42.00 | 1,974.00 | 100.00 | 4,700.00 | 65.00 | 3,055.00 | 43.00 | 2,021.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain - 18" CMP) | 43 | LNFT | 42.00 | 1,806.00 | 50.00 | 2,150.00 | 75.00 | 3,225.00 | 31.00 | 1,333.00 | | 0007 | 203-02-00100 | Drainage Excavation | 460 | CUYD | 56.00 | 25,760.00 | 30.00 | 13,800.00 | 35.00 | 16,100.00 | 25.00 | 11,500.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 153.00 | 1,071.00 | 500.00 | 3,500.00 | 200.00 | 1,400.00 | 250.00 | 1,750.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 903 | LNFT | 3.00 | 2,709.00 | 4.00 | 3,612.00 | 2.15 | 1,941.45 | 3.00 | 2,709.00 | | 0011 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 956.2 | SQYD | 60.00 | 57,372.00 | 50.00 | 47,810.00 | 50.00 | 47,810.00 | 80.00 | 76,496.00 | | 0012 | 304-01-00100 | Lime | 13.55 | TON | 350.00 | 4,742.50 | 1,000.00 | 13,550.00 | 800.00 | 10,840.00 | 550.00 | 7,452.50 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 956 | SQYD | 7.00 | 6,692.00 | 15.00 | 14,340.00 | 11.00 | 10,516.00 | 17.00 | 16,252.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 160.00 | 8,000.00 | 100.00 | 5,000.00 | 185.00 | 9,250.00 | 145.00 | 7,250.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 197.1 | TON | 190.00 | 37,449.00 | 350.00 | 68,985.00 | 180.00 | 35,478.00 | 285.00 | 56,173.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 87 | TON | 230.00 | 20,010.00 | 450.00 | 39,150.00 | 220.00 | 19,140.00 | 290.00 | 25,230.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 141.1 | SQYD | 65.00 | 9,171.50 | 128.00 | 18,060.80 | 125.00 | 17,637.50 | 10.00 | 1,411.00 | | 0018 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 53 | SQYD | 190.00 | 10,070.00 | 360.00 | 19,080.00 | 210.00 | 11,130.00 | 200.00 | 10,600.00 | | 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 419 | INLF | 5.00 | 2,095.00 | 8.00 | 3,352.00 | 4.00 | 1,676.00 | 6.00 | 2,514.00 | | 0020 | 701-01-01103 | Cross Drain Pipe (54" RCP/RPVCP) | 48 | LNFT | 348.00 | 16,704.00 | 825.00 | 39,600.00 | 315.00 | 15,120.00 | 570.00 | 27,360.00 | | 0021 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 56 | LNFT | 206.00 | 11,536.00 | 245.00 | 13,720.00 | 175.00 | 9,800.00 | 170.00 | 9,520.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 48 | LNFT | 189.00 | 9,072.00 | 50.00 | 2,400.00 | 75.00 | 3,600.00 | 12.00 | 576.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 40.00 | 1,500.00 | 50.00 | 1,875.00 | 34.00 | 1,275.00 | 58.00 | 2,175.00 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 140.00 | 14,000.00 | 150.00 | 15,000.00 | 117.50 | 11,750.00 | 145.00 | 14,500.00 | | 0025 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,800.00 | 11,400.00 | 5,000.00 | 15,000.00 | 3,175.00 | 9,525.00 | 4,800.00 | 14,400.00 | | 0026 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,300.00 | 3,300.00 | 5,000.00 | 5,000.00 | 3,100.00 | 3,100.00 | 4,700.00 | 4,700.00 | | 0027 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 750.00 | 8,250.00 | 1,200.00 | 13,200.00 | 650.00 | 7,150.00 | 545.00 | 5,995.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 225.00 | 2,475.00 | 400.00 | 4,400.00 | 200.00 | 2,200.00 | 240.00 | 2,640.00 | | 0029 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 65 | SQYD | 108.00 | 7,020.00 | 100.00 | 6,500.00 | 155.00 | 10,075.00 | 110.00 | 7,150.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 360 | SQYD | 107.00 | 38,520.00 | 125.00 | 45,000.00 | 120.00 | 43,200.00 | 120.00 | 43,200.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 425 | SQYD | 6.00 | 2,550.00 | 5.00 | 2,125.00 | 1.00 | 425.00 | 4.00 | 1,700.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 95,000.00 | 95,000.00 | 17,000.00 | 17,000.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 227 | SQYD | 2.00 | 454.00 | 25.00 | 5,675.00 | 2.50 | 567.50 | 2.20 | 499.40 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 25 | SQYD | 2.00 | 50.00 | 100.00 | 2,500.00 | 5.00 | 125.00 | 5.00 | 125.00 | | 0035 | 726-01-00100 | Bedding Material | 33.4 | CUYD | 231.00 | 7,715.40 | 225.00 | 7,515.00 | 195.00 | 6,513.00 | 134.00 | 4,475.60 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 | 135,000.00 | 135,000.00 | 144,000.00 | 144,000.00 | | 0037 | 729-01-00100 | Sign (Type A) | 10.3 | SQFT | 30.00 | 309.00 | 100.00 | 1,030.00 | 35.00 | 360.50 | 46.00 | 473.80 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 200.00 | 800.00 | 100.00 | 400.00 | 108.00 | 432.00 | | 0039 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 275.00 | 275.00 | 1,000.00 | 1,000.00 | 200.00 | 200.00 | 325.00 | 325.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 15 | LNFT | 110.00 | 1,650.00 | 100.00 | 1,500.00 | 100.00 | 1,500.00 | 80.00 | 1,200.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.085 | MILE | 5,500.00 | 467.50 | 60,000.00 | 5,100.00 | 4,800.00 | 408.00 | 28,200.00 | 2,397.00 | | 0042 | 735-01-00100 | Mailboxes | 2 | EACH | 2.00 | 4.00 | 250.00 | 500.00 | 25.00 | 50.00 | 25.00 | 50.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 450.00 | 450.00 | 500.00 | 500.00 | 500.00 | 500.00 | 400.00 | 400.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.33 | ACRE | 8,000.00 | 2,640.00 | 12,500.00 | 4,125.00 | 6,500.00 | 2,145.00 | 5,200.00 | 1,716.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | | 0046 | 804-01-00300 | Precast Concrete Piles (16") | 1,100 | LNFT | 152.00 | 167,200.00 | 165.00 | 181,500.00 | 195.00 | 214,500.00 | 195.00 | 214,500.00 | | 0047 | 805-01-00100 | Class A1 Concrete (Slab Span) | 88.32 | CUYD | 2,500.00 | 220,800.00 | 2,350.00 | 207,552.00 | 1,750.00 | 154,560.00 | 2,780.00 | 245,529.60 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 23.69 | CUYD | 3,300.00 | 78,177.00 | 3,350.00 | 79,361.50 | 3,750.00 | 88,837.50 | 5,400.00 | 127,926.00 | | 0049 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 947 | SQFT | 2.50 | 2,367.50 | 4.00 | 3,788.00 | 3.25 | 3,077.75 | 3.00 | 2,841.00 | | 0050 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 947 | SQFT | 3.50 | 3,314.50 | 4.00 | 3,788.00 | 3.75 | 3,551.25 | 5.00 | 4,735.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 23,740 | LB | 1.35 | 32,049.00 | 2.25 | 53,415.00 | 1.55 | 36,797.00 | 4.00 | 94,960.00 | | 0052 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 250.00 | 20,000.00 | 325.00 | 26,000.00 | 200.00 | 16,000.00 | 255.00 | 20,400.00 | | 0053 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 250.00 | 20,000.00 | 325.00 | 26,000.00 | 315.00 | 25,200.00 | 275.00 | 22,000.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 100.00 | 50,000.00 | 115.00 | 57,500.00 | 100.00 | 50,000.00 | 155.00 | 77,500.00 | | 0055 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 40.00 | 4,800.00 | 35.00 | 4,200.00 | 85.00 | 10,200.00 | 99.00 | 11,880.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,299,831.40 | | 1,415,831.80 | | 1,416,569.95 | | 1,489,460.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Barriere Construction Co., LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (est. 0.58 Acres) | 1 | LUMP | 6,590.00 | 6,590.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,020.00 | 6,020.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 771.5 | SQYD | 12.00 | 9,258.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 625330308903261 (Sta. 105+13.44; 20' x 57' TTRES) | 1 | LUMP | 31,200.00 | 31,200.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (Cross Drain - 54" Metal) | 47 | LNFT | 21.00 | 987.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain - 18" CMP) | 43 | LNFT | 27.00 | 1,161.00 | | 0007 | 203-02-00100 | Drainage Excavation | 460 | CUYD | 68.00 | 31,280.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,300.00 | 25,300.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 160.00 | 1,120.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 903 | LNFT | 3.50 | 3,160.50 | | 0011 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 956.2 | SQYD | 59.00 | 56,415.80 | | 0012 | 304-01-00100 | Lime | 13.55 | TON | 520.00 | 7,046.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 956 | SQYD | 18.00 | 17,208.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 98.00 | 4,900.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 197.1 | TON | 280.00 | 55,188.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 87 | TON | 250.00 | 21,750.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 141.1 | SQYD | 65.00 | 9,171.50 | | 0018 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 53 | SQYD | 170.00 | 9,010.00 | | 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 419 | INLF | 8.20 | 3,435.80 | | 0020 | 701-01-01103 | Cross Drain Pipe (54" RCP/RPVCP) | 48 | LNFT | 660.00 | 31,680.00 | | 0021 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 56 | LNFT | 310.00 | 17,360.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 48 | LNFT | 52.00 | 2,496.00 | | 0023 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 31.00 | 1,162.50 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | | 0025 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 3 | EACH | 3,450.00 | 10,350.00 | | 0026 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,140.00 | 3,140.00 | | 0027 | 708-01-00100 | Right-of-Way Monument | 11 | EACH | 820.00 | 9,020.00 | | 0028 | 708-02-00100 | Right-of-Way Monument Witness Post | 11 | EACH | 250.00 | 2,750.00 | | 0029 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 65 | SQYD | 110.00 | 7,150.00 | | 0030 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 360 | SQYD | 169.00 | 60,840.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 425 | SQYD | 6.00 | 2,550.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,800.00 | 16,800.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 227 | SQYD | 2.30 | 522.10 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 25 | SQYD | 2.30 | 57.50 | | 0035 | 726-01-00100 | Bedding Material | 33.4 | CUYD | 160.00 | 5,344.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 218,000.00 | 218,000.00 | | 0037 | 729-01-00100 | Sign (Type A) | 10.3 | SQFT | 13.00 | 133.90 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 190.00 | 760.00 | | 0039 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 160.00 | 160.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 15 | LNFT | 130.00 | 1,950.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.085 | MILE | 6,280.00 | 533.80 | | 0042 | 735-01-00100 | Mailboxes | 2 | EACH | 63.00 | 126.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 310.00 | 310.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.33 | ACRE | 9,540.00 | 3,148.20 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,640.00 | 8,640.00 | | 0046 | 804-01-00300 | Precast Concrete Piles (16") | 1,100 | LNFT | 280.00 | 308,000.00 | | 0047 | 805-01-00100 | Class A1 Concrete (Slab Span) | 88.32 | CUYD | 2,250.00 | 198,720.00 | | 0048 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 23.69 | CUYD | 4,500.00 | 106,605.00 | | 0049 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 947 | SQFT | 5.75 | 5,445.25 | | 0050 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 947 | SQFT | 3.50 | 3,314.50 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 23,740 | LB | 2.30 | 54,602.00 | | 0052 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 310.00 | 24,800.00 | | 0053 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 80 | LNFT | 310.00 | 24,800.00 | | 0054 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 160.00 | 80,000.00 | | 0055 | 815-03-00300 | Joint Seal (Poured) | 120 | LNFT | 56.00 | 6,720.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,529,192.35 |
|