Proposal:H.014278.6
Parish:Iberia
Routes:LA 85
Description:LA 85: PATOUT AND DRAIN CANAL BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE SLAB SPAN BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$3,064,801.50
| Rank | License | Bidder | Construction Bid |
| 1 | 54206 | Southern Constructors, LLC | $2,719,574.00 |
| 2 | 01516 | Elevate Heavy Civil Construction, LLC | $2,935,930.70 |
| 3 | 67770 | Reliant Industrial Solutions L.L.C. | $3,011,577.60 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $3,328,027.25 |
| 5 | 34263 | LA Contracting Enterprise, L.L.C. | $3,411,066.90 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $3,515,090.32 |
| 7 | 44187 | RNGD Construction LLC | $3,722,202.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Southern Constructors, LLC | - 2 - Elevate Heavy Civil Construction, LLC | - 3 - Reliant Industrial Solutions L.L.C. | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 13,000.00 | 13,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 717.5 | SQYD | 25.00 | 17,937.50 | 10.00 | 7,175.00 | 22.00 | 15,785.00 | 35.00 | 25,112.50 | | 0003 | 202-02-04501 | Removal of Bridge (Str. No. 032302360101041, 40' x 23' Conc. Slab Span Bridge) | 920 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 032302360206641, 59' x 24' Conc. Slab Span Bridge) | 1,416 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 25,500.00 | 25,500.00 | 30,000.00 | 30,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 612 | LNFT | 10.00 | 6,120.00 | 10.00 | 6,120.00 | 6.75 | 4,131.00 | 9.50 | 5,814.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" x 62' CMP Side Drain) | 62 | LNFT | 30.00 | 1,860.00 | 21.00 | 1,302.00 | 25.00 | 1,550.00 | 25.00 | 1,550.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (30" x 102' CMP Side Drain) | 102 | LNFT | 30.00 | 3,060.00 | 25.00 | 2,550.00 | 18.00 | 1,836.00 | 25.00 | 2,550.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 24" x 120' CMP Side Drain | 120 | LNFT | 30.00 | 3,600.00 | 21.00 | 2,520.00 | 20.75 | 2,490.00 | 25.00 | 3,000.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 36" x 160' CMP Side Drain | 160 | LNFT | 30.00 | 4,800.00 | 24.00 | 3,840.00 | 22.50 | 3,600.00 | 25.00 | 4,000.00 | | 0010 | 203-01-00100 | General Excavation | 725 | CUYD | 25.00 | 18,125.00 | 18.00 | 13,050.00 | 42.00 | 30,450.00 | 27.00 | 19,575.00 | | 0011 | 203-02-00100 | Drainage Excavation | 106 | CUYD | 25.00 | 2,650.00 | 53.00 | 5,618.00 | 50.00 | 5,300.00 | 82.00 | 8,692.00 | | 0012 | 203-03-00100 | Embankment | 1,740 | CUYD | 35.00 | 60,900.00 | 52.00 | 90,480.00 | 55.00 | 95,700.00 | 70.00 | 121,800.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 75.00 | 2,625.00 | 35.00 | 1,225.00 | 27.00 | 945.00 | 36.00 | 1,260.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 500.00 | 1,000.00 | 150.00 | 300.00 | 210.00 | 420.00 | 150.00 | 300.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 1,250 | LNFT | 2.75 | 3,437.50 | 3.00 | 3,750.00 | 3.10 | 3,875.00 | 2.40 | 3,000.00 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 712.3 | SQYD | 165.00 | 117,529.50 | 170.00 | 121,091.00 | 145.00 | 103,283.50 | 200.00 | 142,460.00 | | 0017 | 304-01-00100 | Lime | 10.09 | TON | 600.00 | 6,054.00 | 300.00 | 3,027.00 | 490.00 | 4,944.10 | 440.00 | 4,439.60 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 713 | SQYD | 28.00 | 19,964.00 | 5.00 | 3,565.00 | 25.00 | 17,825.00 | 12.50 | 8,912.50 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14.9 | CUYD | 150.00 | 2,235.00 | 216.00 | 3,218.40 | 134.00 | 1,996.60 | 113.00 | 1,683.70 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 14.9 | CUYD | 150.00 | 2,235.00 | 216.00 | 3,218.40 | 134.00 | 1,996.60 | 113.00 | 1,683.70 | | 0021 | 502-01-00100 | Asphalt Concrete | 393.9 | TON | 275.00 | 108,322.50 | 350.00 | 137,865.00 | 247.50 | 97,490.25 | 400.00 | 157,560.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 58 | TON | 300.00 | 17,400.00 | 400.00 | 23,200.00 | 305.00 | 17,690.00 | 450.00 | 26,100.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 1,320 | SQYD | 20.00 | 26,400.00 | 11.00 | 14,520.00 | 17.50 | 23,100.00 | 11.78 | 15,549.60 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -73 | CUYD | 5.00 | -365.00 | 1.00 | -73.00 | 1.00 | -73.00 | 1.15 | -83.95 | | 0025 | 510-01-00001 | Pavement Patching (10.25 Inch Minimum Thickness) | 82 | SQYD | 300.00 | 24,600.00 | 200.00 | 16,400.00 | 400.00 | 32,800.00 | 250.00 | 20,500.00 | | 0026 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 4,147 | INLF | 2.00 | 8,294.00 | 3.00 | 12,441.00 | 1.10 | 4,561.70 | 1.10 | 4,561.70 | | 0027 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 2.00 | 384.00 | 36.00 | 6,912.00 | 45.00 | 8,640.00 | 8.00 | 1,536.00 | | 0028 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 2.00 | 640.00 | 2.00 | 640.00 | 3.25 | 1,040.00 | 8.00 | 2,560.00 | | 0029 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 388 | LNFT | 140.00 | 54,320.00 | 111.00 | 43,068.00 | 101.00 | 39,188.00 | 126.00 | 48,888.00 | | 0030 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 114 | LNFT | 145.00 | 16,530.00 | 128.00 | 14,592.00 | 138.50 | 15,789.00 | 165.00 | 18,810.00 | | 0031 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 236 | LNFT | 180.00 | 42,480.00 | 165.00 | 38,940.00 | 151.50 | 35,754.00 | 205.00 | 48,380.00 | | 0032 | 701-05-01145 | Side Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 4 | LNFT | 600.00 | 2,400.00 | 1,000.00 | 4,000.00 | 650.00 | 2,600.00 | 944.00 | 3,776.00 | | 0033 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 738 | LNFT | 5.00 | 3,690.00 | 15.00 | 11,070.00 | 15.00 | 11,070.00 | 15.00 | 11,070.00 | | 0034 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 6,000.00 | 24,000.00 | 8,900.00 | 35,600.00 | 7,200.00 | 28,800.00 | 5,600.00 | 22,400.00 | | 0035 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 10,000.00 | 10,000.00 | 10,700.00 | 10,700.00 | 10,900.00 | 10,900.00 | 8,500.00 | 8,500.00 | | 0036 | 702-08-00100 | Side Drain Safety End (Type 1) | 3 | EACH | 6,000.00 | 18,000.00 | 7,500.00 | 22,500.00 | 4,400.00 | 13,200.00 | 5,600.00 | 16,800.00 | | 0037 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 7,000.00 | 28,000.00 | 8,600.00 | 34,400.00 | 5,900.00 | 23,600.00 | 10,800.00 | 43,200.00 | | 0038 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 93.8 | LNFT | 35.00 | 3,283.00 | 34.00 | 3,189.20 | 22.00 | 2,063.60 | 64.00 | 6,003.20 | | 0039 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 120.00 | 12,000.00 | 93.50 | 9,350.00 | 126.00 | 12,600.00 | | 0040 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,000.00 | 16,000.00 | 3,400.00 | 13,600.00 | 3,575.00 | 14,300.00 | 4,400.00 | 17,600.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 650.00 | 9,100.00 | 600.00 | 8,400.00 | 580.00 | 8,120.00 | 670.00 | 9,380.00 | | 0042 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 250.00 | 3,500.00 | 200.00 | 2,800.00 | 220.00 | 3,080.00 | 225.00 | 3,150.00 | | 0043 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 960 | SQYD | 95.00 | 91,200.00 | 71.00 | 68,160.00 | 115.00 | 110,400.00 | 60.00 | 57,600.00 | | 0044 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 330 | SQYD | 115.00 | 37,950.00 | 118.00 | 38,940.00 | 160.00 | 52,800.00 | 220.00 | 72,600.00 | | 0045 | 711-04-00100 | Geotextile Fabric | 1,290 | SQYD | 5.00 | 6,450.00 | 5.00 | 6,450.00 | 4.50 | 5,805.00 | 3.25 | 4,192.50 | | 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 23,600.00 | 23,600.00 | 75,000.00 | 75,000.00 | 60,000.00 | 60,000.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 119 | SQYD | 5.00 | 595.00 | 3.00 | 357.00 | 2.60 | 309.40 | 3.00 | 357.00 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 22,400.00 | 22,400.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0049 | 726-01-00100 | Bedding Material | 331.4 | CUYD | 160.00 | 53,024.00 | 145.00 | 48,053.00 | 130.00 | 43,082.00 | 190.00 | 62,966.00 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 162,500.00 | 162,500.00 | 293,574.00 | 293,574.00 | 270,000.00 | 270,000.00 | 326,000.00 | 326,000.00 | | 0051 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 500.00 | 2,000.00 | 85.00 | 340.00 | 110.00 | 440.00 | 95.00 | 380.00 | | 0052 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 500.00 | 2,000.00 | 85.00 | 340.00 | 165.00 | 660.00 | 120.00 | 480.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 33 | EACH | 50.00 | 1,650.00 | 6.00 | 198.00 | 7.00 | 231.00 | 7.00 | 231.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.237 | MILE | 20,000.00 | 4,740.00 | 8,800.00 | 2,085.60 | 9,250.00 | 2,192.25 | 9,800.00 | 2,322.60 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 30,000.00 | 3,540.00 | 8,200.00 | 967.60 | 8,200.00 | 967.60 | 8,625.00 | 1,017.75 | | 0056 | 735-01-00100 | Mailboxes | 2 | EACH | 250.00 | 500.00 | 35.00 | 70.00 | 55.00 | 110.00 | 2.50 | 5.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 300.00 | 600.00 | 165.00 | 330.00 | 285.00 | 570.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 1.05 | ACRE | 3,500.00 | 3,675.00 | 2,800.00 | 2,940.00 | 3,700.00 | 3,885.00 | 3,225.00 | 3,386.25 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 28,000.00 | 28,000.00 | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | | 0060 | 804-01-00400 | Precast Concrete Piles (18") | 1,580 | LNFT | 136.00 | 214,880.00 | 146.00 | 230,680.00 | 175.00 | 276,500.00 | 185.00 | 292,300.00 | | 0061 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 30,000.00 | 30,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 23,000.00 | 23,000.00 | | 0062 | 804-18-00100 | Vibration Monitoring | 8 | DAY | 2,000.00 | 16,000.00 | 725.00 | 5,800.00 | 2,200.00 | 17,600.00 | 690.00 | 5,520.00 | | 0063 | 805-01-00100 | Class A1 Concrete (Slab Span) | 127.96 | CUYD | 1,600.00 | 204,736.00 | 950.00 | 121,562.00 | 1,900.00 | 243,124.00 | 1,570.00 | 200,897.20 | | 0064 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 41.15 | CUYD | 2,500.00 | 102,875.00 | 2,450.00 | 100,817.50 | 2,600.00 | 106,990.00 | 3,150.00 | 129,622.50 | | 0065 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 280 | LNFT | 1,850.00 | 518,000.00 | 2,150.00 | 602,000.00 | 1,990.00 | 557,200.00 | 2,075.00 | 581,000.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (81.20 CY Concrete, 10,126 lb Rebar) | 2 | EACH | 70,000.00 | 140,000.00 | 75,000.00 | 150,000.00 | 82,000.00 | 164,000.00 | 109,000.00 | 218,000.00 | | 0067 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 3.00 | 3,342.00 | 4.00 | 4,456.00 | 2.50 | 2,785.00 | | 0068 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 4.00 | 4,456.00 | 4.00 | 4,456.00 | 2.85 | 3,174.90 | | 0069 | 806-01-00100 | Deformed Reinforcing Steel | 30,632 | LB | 2.00 | 61,264.00 | 2.00 | 61,264.00 | 1.50 | 45,948.00 | 1.75 | 53,606.00 | | 0070 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 275.00 | 44,000.00 | 262.00 | 41,920.00 | 240.00 | 38,400.00 | 388.00 | 62,080.00 | | 0071 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 90.00 | 115,200.00 | 100.00 | 128,000.00 | 105.00 | 134,400.00 | 90.00 | 115,200.00 | | 0072 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 100 | SFIN | 165.00 | 16,500.00 | 237.00 | 23,700.00 | 110.00 | 11,000.00 | 233.00 | 23,300.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 160 | LNFT | 50.00 | 8,000.00 | 25.00 | 4,000.00 | 22.50 | 3,600.00 | 36.00 | 5,760.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,719,574.00 | | 2,935,930.70 | | 3,011,577.60 | | 3,328,027.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - LA Contracting Enterprise, L.L.C. | - 6 - JB JAMES CONSTRUCTION LLC | - 7 - RNGD Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 300,000.00 | 300,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 717.5 | SQYD | 18.00 | 12,915.00 | 12.00 | 8,610.00 | 30.00 | 21,525.00 | | 0003 | 202-02-04501 | Removal of Bridge (Str. No. 032302360101041, 40' x 23' Conc. Slab Span Bridge) | 920 | LUMP | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 032302360206641, 59' x 24' Conc. Slab Span Bridge) | 1,416 | LUMP | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 612 | LNFT | 11.00 | 6,732.00 | 8.00 | 4,896.00 | 15.00 | 9,180.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (24" x 62' CMP Side Drain) | 62 | LNFT | 25.00 | 1,550.00 | 60.00 | 3,720.00 | 1.00 | 62.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (30" x 102' CMP Side Drain) | 102 | LNFT | 18.00 | 1,836.00 | 60.00 | 6,120.00 | 1.00 | 102.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 24" x 120' CMP Side Drain | 120 | LNFT | 18.00 | 2,160.00 | 60.00 | 7,200.00 | 1.00 | 120.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 36" x 160' CMP Side Drain | 160 | LNFT | 26.00 | 4,160.00 | 60.00 | 9,600.00 | 5.00 | 800.00 | | 0010 | 203-01-00100 | General Excavation | 725 | CUYD | 28.00 | 20,300.00 | 40.00 | 29,000.00 | 30.00 | 21,750.00 | | 0011 | 203-02-00100 | Drainage Excavation | 106 | CUYD | 34.00 | 3,604.00 | 40.00 | 4,240.00 | 60.00 | 6,360.00 | | 0012 | 203-03-00100 | Embankment | 1,740 | CUYD | 52.00 | 90,480.00 | 70.00 | 121,800.00 | 35.00 | 60,900.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 34.00 | 1,190.00 | 25.00 | 875.00 | 30.00 | 1,050.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 170.00 | 340.00 | 200.00 | 400.00 | 225.00 | 450.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 1,250 | LNFT | 2.50 | 3,125.00 | 8.00 | 10,000.00 | 5.00 | 6,250.00 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 712.3 | SQYD | 153.00 | 108,981.90 | 130.00 | 92,599.00 | 215.00 | 153,144.50 | | 0017 | 304-01-00100 | Lime | 10.09 | TON | 467.00 | 4,712.03 | 500.00 | 5,045.00 | 250.00 | 2,522.50 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 713 | SQYD | 27.00 | 19,251.00 | 17.00 | 12,121.00 | 15.00 | 10,695.00 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14.9 | CUYD | 203.00 | 3,024.70 | 200.00 | 2,980.00 | 150.00 | 2,235.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 14.9 | CUYD | 172.00 | 2,562.80 | 200.00 | 2,980.00 | 150.00 | 2,235.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 393.9 | TON | 264.00 | 103,989.60 | 225.00 | 88,627.50 | 275.00 | 108,322.50 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 58 | TON | 333.00 | 19,314.00 | 275.00 | 15,950.00 | 300.00 | 17,400.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 1,320 | SQYD | 19.00 | 25,080.00 | 16.00 | 21,120.00 | 17.50 | 23,100.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -73 | CUYD | 0.01 | -0.73 | 0.01 | -0.73 | 0.01 | -0.73 | | 0025 | 510-01-00001 | Pavement Patching (10.25 Inch Minimum Thickness) | 82 | SQYD | 438.00 | 35,916.00 | 380.00 | 31,160.00 | 250.00 | 20,500.00 | | 0026 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 4,147 | INLF | 1.00 | 4,147.00 | 0.75 | 3,110.25 | 1.00 | 4,147.00 | | 0027 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 40.00 | 7,680.00 | 35.00 | 6,720.00 | 40.00 | 7,680.00 | | 0028 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 3.50 | 1,120.00 | 3.00 | 960.00 | 4.00 | 1,280.00 | | 0029 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 388 | LNFT | 102.00 | 39,576.00 | 150.00 | 58,200.00 | 150.00 | 58,200.00 | | 0030 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 114 | LNFT | 141.00 | 16,074.00 | 280.00 | 31,920.00 | 175.00 | 19,950.00 | | 0031 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 236 | LNFT | 176.00 | 41,536.00 | 210.00 | 49,560.00 | 200.00 | 47,200.00 | | 0032 | 701-05-01145 | Side Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 4 | LNFT | 320.00 | 1,280.00 | 1,000.00 | 4,000.00 | 1,250.00 | 5,000.00 | | 0033 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 738 | LNFT | 17.00 | 12,546.00 | 1.00 | 738.00 | 0.01 | 7.38 | | 0034 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 5,500.00 | 22,000.00 | 9,000.00 | 36,000.00 | 5,000.00 | 20,000.00 | | 0035 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | | 0036 | 702-08-00100 | Side Drain Safety End (Type 1) | 3 | EACH | 5,000.00 | 15,000.00 | 6,000.00 | 18,000.00 | 5,000.00 | 15,000.00 | | 0037 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 10,300.00 | 41,200.00 | 10,000.00 | 40,000.00 | 8,000.00 | 32,000.00 | | 0038 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 93.8 | LNFT | 35.00 | 3,283.00 | 20.00 | 1,876.00 | 22.00 | 2,063.60 | | 0039 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 119.00 | 11,900.00 | 85.00 | 8,500.00 | 90.00 | 9,000.00 | | 0040 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,700.00 | 14,800.00 | 3,250.00 | 13,000.00 | 4,000.00 | 16,000.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 14 | EACH | 680.00 | 9,520.00 | 600.00 | 8,400.00 | 750.00 | 10,500.00 | | 0042 | 708-02-00100 | Right-of-Way Monument Witness Post | 14 | EACH | 226.00 | 3,164.00 | 200.00 | 2,800.00 | 250.00 | 3,500.00 | | 0043 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 960 | SQYD | 142.00 | 136,320.00 | 110.00 | 105,600.00 | 115.00 | 110,400.00 | | 0044 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 330 | SQYD | 163.00 | 53,790.00 | 175.00 | 57,750.00 | 165.00 | 54,450.00 | | 0045 | 711-04-00100 | Geotextile Fabric | 1,290 | SQYD | 5.50 | 7,095.00 | 2.00 | 2,580.00 | 1.00 | 1,290.00 | | 0046 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,000.00 | 42,000.00 | 45,000.00 | 45,000.00 | 75,000.00 | 75,000.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 119 | SQYD | 8.00 | 952.00 | 2.30 | 273.70 | 3.00 | 357.00 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 51,000.00 | 51,000.00 | 28,000.00 | 28,000.00 | 35,000.00 | 35,000.00 | | 0049 | 726-01-00100 | Bedding Material | 331.4 | CUYD | 143.00 | 47,390.20 | 220.00 | 72,908.00 | 200.00 | 66,280.00 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 303,000.00 | 303,000.00 | 340,000.00 | 340,000.00 | 370,000.00 | 370,000.00 | | 0051 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 114.00 | 456.00 | 100.00 | 400.00 | 115.00 | 460.00 | | 0052 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 170.00 | 680.00 | 150.00 | 600.00 | 175.00 | 700.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 33 | EACH | 7.00 | 231.00 | 6.00 | 198.00 | 37.00 | 1,221.00 | | 0054 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.237 | MILE | 9,700.00 | 2,298.90 | 8,500.00 | 2,014.50 | 13,000.00 | 3,081.00 | | 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 8,500.00 | 1,003.00 | 3,200.00 | 377.60 | 13,000.00 | 1,534.00 | | 0056 | 735-01-00100 | Mailboxes | 2 | EACH | 60.00 | 120.00 | 50.00 | 100.00 | 60.00 | 120.00 | | 0057 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 170.00 | 340.00 | 150.00 | 300.00 | 160.00 | 320.00 | | 0058 | 739-01-00100 | Hydro-Seeding | 1.05 | ACRE | 3,600.00 | 3,780.00 | 3,350.00 | 3,517.50 | 4,000.00 | 4,200.00 | | 0059 | 740-01-00100 | Construction Layout | 1 | LUMP | 26,000.00 | 26,000.00 | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 | | 0060 | 804-01-00400 | Precast Concrete Piles (18") | 1,580 | LNFT | 208.00 | 328,640.00 | 185.00 | 292,300.00 | 240.00 | 379,200.00 | | 0061 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 23,000.00 | 23,000.00 | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | | 0062 | 804-18-00100 | Vibration Monitoring | 8 | DAY | 907.00 | 7,256.00 | 1,500.00 | 12,000.00 | 1,200.00 | 9,600.00 | | 0063 | 805-01-00100 | Class A1 Concrete (Slab Span) | 127.96 | CUYD | 2,225.00 | 284,711.00 | 1,200.00 | 153,552.00 | 2,000.00 | 255,920.00 | | 0064 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 41.15 | CUYD | 3,750.00 | 154,312.50 | 2,400.00 | 98,760.00 | 2,750.00 | 113,162.50 | | 0065 | 805-15-02500 | Reinforced Concrete Box Culverts (Precast) (10' x 9') | 280 | LNFT | 2,325.00 | 651,000.00 | 2,300.00 | 644,000.00 | 2,500.00 | 700,000.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (81.20 CY Concrete, 10,126 lb Rebar) | 2 | EACH | 84,000.00 | 168,000.00 | 60,000.00 | 120,000.00 | 80,000.00 | 160,000.00 | | 0067 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 3.50 | 3,899.00 | 4.00 | 4,456.00 | 3.00 | 3,342.00 | | 0068 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 3.50 | 3,899.00 | 2.00 | 2,228.00 | 5.00 | 5,570.00 | | 0069 | 806-01-00100 | Deformed Reinforcing Steel | 30,632 | LB | 2.00 | 61,264.00 | 1.50 | 45,948.00 | 2.00 | 61,264.00 | | 0070 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 360.00 | 57,600.00 | 200.00 | 32,000.00 | 250.00 | 40,000.00 | | 0071 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,280 | SQFT | 126.00 | 161,280.00 | 90.00 | 115,200.00 | 175.00 | 224,000.00 | | 0072 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 100 | SFIN | 158.00 | 15,800.00 | 90.00 | 9,000.00 | 100.00 | 10,000.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 160 | LNFT | 40.00 | 6,400.00 | 20.00 | 3,200.00 | 50.00 | 8,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,411,066.90 | | 3,515,090.32 | | 3,722,202.25 |
|