Proposal:H.014255.6
Parish:Rapides
Description:BEESON ROAD OVER FLAGON BAYOU TRIBUTARY
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF CONCRETE SLAB SPAN BRIDGE, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$716,327.47
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $596,638.41 |
| 2 | 76442 | Pineland Equipment Group, LLC | $634,741.00 |
| 3 | 55505 | MERRICK, LLC | $706,584.01 |
| 4 | 49239 | WL Bass Construction Inc. | $880,175.70 |
| 5 | 40486 | REGIONAL CONSTRUCTION, LLC | $892,146.50 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $1,335,618.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - Pineland Equipment Group, LLC | - 3 - MERRICK, LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 30,400.00 | 30,400.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,335.00 | 1,335.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 2,500.00 | 2,500.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 624.1 | SQYD | 8.54 | 5,329.81 | 30.00 | 18,723.00 | 10.00 | 6,241.00 | 20.00 | 12,482.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA 299+97.5; 22.0' W x 29.9' LCONCRETE SLAB W/TIMBER PILES) | 658 | LUMP | 12,900.00 | 12,900.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 69 | CUYD | 18.00 | 1,242.00 | 25.00 | 1,725.00 | 25.00 | 1,725.00 | 33.00 | 2,277.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,735.00 | 15,735.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 6 | EACH | 59.00 | 354.00 | 20.00 | 120.00 | 20.00 | 120.00 | 50.00 | 300.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 354.00 | 1,062.00 | 500.00 | 1,500.00 | 200.00 | 600.00 | 300.00 | 900.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 622 | LNFT | 3.00 | 1,866.00 | 8.00 | 4,976.00 | 3.00 | 1,866.00 | 3.00 | 1,866.00 | | 0010 | 302-01-00100 | Class II Base Course | 166.6 | CUYD | 209.00 | 34,819.40 | 150.00 | 24,990.00 | 175.00 | 29,155.00 | 220.00 | 36,652.00 | | 0011 | 302-03-00100 | Base Drain Outlet | 6 | EACH | 312.00 | 1,872.00 | 550.00 | 3,300.00 | 425.00 | 2,550.00 | 1,500.00 | 9,000.00 | | 0012 | 304-01-00100 | Lime | 10.01 | TON | 679.00 | 6,796.79 | 300.00 | 3,003.00 | 1.00 | 10.01 | 460.00 | 4,604.60 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 706 | SQYD | 22.00 | 15,532.00 | 22.50 | 15,885.00 | 1.00 | 706.00 | 8.00 | 5,648.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 66 | CUYD | 69.00 | 4,554.00 | 150.00 | 9,900.00 | 185.00 | 12,210.00 | 160.00 | 10,560.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 125.00 | 3,125.00 | 150.00 | 3,750.00 | 150.00 | 3,750.00 | 150.00 | 3,750.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 149.8 | TON | 390.00 | 58,422.00 | 210.00 | 31,458.00 | 365.00 | 54,677.00 | 382.00 | 57,223.60 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 424 | INLF | 4.00 | 1,696.00 | 8.00 | 3,392.00 | 3.00 | 1,272.00 | 1.00 | 424.00 | | 0018 | 701-05-01051 | Side Drain Pipe (18" RCP) | 5 | LNFT | 278.00 | 1,390.00 | 73.50 | 367.50 | 185.00 | 925.00 | 150.00 | 750.00 | | 0019 | 701-05-01082 | Side Drain Pipe (30" RCP/RPVCP/CMP) | 47 | LNFT | 286.00 | 13,442.00 | 93.00 | 4,371.00 | 205.00 | 9,635.00 | 175.00 | 8,225.00 | | 0020 | 701-05-02085 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 120 | LNFT | 142.00 | 17,040.00 | 102.00 | 12,240.00 | 115.00 | 13,800.00 | 150.00 | 18,000.00 | | 0021 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,180.00 | 2,360.00 | 650.00 | 1,300.00 | 1,800.00 | 3,600.00 | 4,500.00 | 9,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 46.00 | 2,944.00 | 30.00 | 1,920.00 | 200.00 | 12,800.00 | 320.00 | 20,480.00 | | 0023 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 52 | SQYD | 131.00 | 6,812.00 | 80.00 | 4,160.00 | 110.00 | 5,720.00 | 102.00 | 5,304.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 52 | SQYD | 6.00 | 312.00 | 15.00 | 780.00 | 4.00 | 208.00 | 4.00 | 208.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,557.00 | 6,557.00 | 32,500.00 | 32,500.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | | 0026 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 5,900.00 | 1,770.00 | 1,400.00 | 420.00 | 12,000.00 | 3,600.00 | 5,000.00 | 1,500.00 | | 0027 | 717-01-00100 | Seeding | 4 | LB | 59.00 | 236.00 | 50.00 | 200.00 | 140.00 | 560.00 | 50.00 | 200.00 | | 0028 | 718-01-00100 | Fertilizer | 148 | LB | 1.18 | 174.64 | 1.25 | 185.00 | 3.00 | 444.00 | 1.00 | 148.00 | | 0029 | 726-01-00100 | Bedding Material | 136 | CUYD | 125.00 | 17,000.00 | 75.00 | 10,200.00 | 170.00 | 23,120.00 | 250.00 | 34,000.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 20,000.00 | 20,000.00 | 80,000.00 | 80,000.00 | 88,000.00 | 88,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 118.00 | 472.00 | 195.00 | 780.00 | 200.00 | 800.00 | 150.00 | 600.00 | | 0032 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 617 | LNFT | 5.31 | 3,276.27 | 5.50 | 3,393.50 | 6.00 | 3,702.00 | 4.50 | 2,776.50 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,938.00 | 2,938.00 | 3,500.00 | 3,500.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | 0034 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') ASTM C 1577 | 96 | LNFT | 1,835.00 | 176,160.00 | 1,620.00 | 155,520.00 | 2,000.00 | 192,000.00 | 1,700.00 | 163,200.00 | | 0035 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (North) (Steel = 2,333 Pounds, Concrete = 29.05 Cubic Yards) | 1 | EACH | 60,221.00 | 60,221.00 | 93,000.00 | 93,000.00 | 45,000.00 | 45,000.00 | 85,000.00 | 85,000.00 | | 0036 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (South) (Steel = 2,364 pounds, Concrete = 29.54 Cubic Yards) | 1 | EACH | 60,900.00 | 60,900.00 | 95,000.00 | 95,000.00 | 45,000.00 | 45,000.00 | 88,000.00 | 88,000.00 | | 0037 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,197 | SQFT | 2.50 | 2,992.50 | 6.00 | 7,182.00 | 4.00 | 4,788.00 | 1.00 | 1,197.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 596,638.41 | | 634,741.00 | | 706,584.01 | | 880,175.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - REGIONAL CONSTRUCTION, LLC | - 6 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 18,000.00 | 18,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 624.1 | SQYD | 20.00 | 12,482.00 | 75.00 | 46,807.50 | | 0004 | 202-02-04501 | Removal of Bridge (STA 299+97.5; 22.0' W x 29.9' LCONCRETE SLAB W/TIMBER PILES) | 658 | LUMP | 45,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 69 | CUYD | 25.00 | 1,725.00 | 35.00 | 2,415.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 56,000.00 | 56,000.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 6 | EACH | 25.00 | 150.00 | 50.00 | 300.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 100.00 | 300.00 | 300.00 | 900.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 622 | LNFT | 6.00 | 3,732.00 | 7.00 | 4,354.00 | | 0010 | 302-01-00100 | Class II Base Course | 166.6 | CUYD | 145.00 | 24,157.00 | 550.00 | 91,630.00 | | 0011 | 302-03-00100 | Base Drain Outlet | 6 | EACH | 2,000.00 | 12,000.00 | 950.00 | 5,700.00 | | 0012 | 304-01-00100 | Lime | 10.01 | TON | 450.00 | 4,504.50 | 950.00 | 9,509.50 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 706 | SQYD | 12.00 | 8,472.00 | 36.00 | 25,416.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 66 | CUYD | 130.00 | 8,580.00 | 400.00 | 26,400.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25 | CUYD | 100.00 | 2,500.00 | 95.00 | 2,375.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 149.8 | TON | 220.00 | 32,956.00 | 500.00 | 74,900.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 424 | INLF | 2.00 | 848.00 | 1.75 | 742.00 | | 0018 | 701-05-01051 | Side Drain Pipe (18" RCP) | 5 | LNFT | 400.00 | 2,000.00 | 150.00 | 750.00 | | 0019 | 701-05-01082 | Side Drain Pipe (30" RCP/RPVCP/CMP) | 47 | LNFT | 140.00 | 6,580.00 | 160.00 | 7,520.00 | | 0020 | 701-05-02085 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 120 | LNFT | 140.00 | 16,800.00 | 160.00 | 19,200.00 | | 0021 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 64 | LNFT | 10.00 | 640.00 | 250.00 | 16,000.00 | | 0023 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 52 | SQYD | 120.00 | 6,240.00 | 180.00 | 9,360.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 52 | SQYD | 6.00 | 312.00 | 6.50 | 338.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 78,500.00 | 78,500.00 | | 0026 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 6,000.00 | 1,800.00 | 2,000.00 | 600.00 | | 0027 | 717-01-00100 | Seeding | 4 | LB | 30.00 | 120.00 | 150.00 | 600.00 | | 0028 | 718-01-00100 | Fertilizer | 148 | LB | 8.00 | 1,184.00 | 20.00 | 2,960.00 | | 0029 | 726-01-00100 | Bedding Material | 136 | CUYD | 145.00 | 19,720.00 | 170.00 | 23,120.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 130,000.00 | 130,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 115.00 | 460.00 | 65.00 | 260.00 | | 0032 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 617 | LNFT | 6.00 | 3,702.00 | 4.50 | 2,776.50 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 65,000.00 | 65,000.00 | | 0034 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') ASTM C 1577 | 96 | LNFT | 2,750.00 | 264,000.00 | 3,200.00 | 307,200.00 | | 0035 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (North) (Steel = 2,333 Pounds, Concrete = 29.05 Cubic Yards) | 1 | EACH | 62,000.00 | 62,000.00 | 100,000.00 | 100,000.00 | | 0036 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (South) (Steel = 2,364 pounds, Concrete = 29.54 Cubic Yards) | 1 | EACH | 62,000.00 | 62,000.00 | 100,000.00 | 100,000.00 | | 0037 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,197 | SQFT | 6.00 | 7,182.00 | 5.00 | 5,985.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 892,146.50 | | 1,335,618.50 |
|