Bid Tabulations for the Letting of 6/10/2026 LA DOTD Headquarters

Proposal:H.014232.6
Parish:Ouachita
Description:RUFFIN DRIVE OVER DRAIN TO YOUNGS BAYOU
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, RIPRAP, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,627,214.00
Rank License BidderConstruction Bid
139613Baker Pile Driving and Site Work, LLC$1,473,517.25
214788Louisiana Bridge, Inc.$1,512,661.20
312487Diamond B Construction Co., L.L.C.$1,518,139.40
456994Matt L. Guinn Construction, LLC$1,855,994.70
549239WL Bass Construction Inc.$1,903,792.50
639462JB JAMES CONSTRUCTION LLC$1,942,319.00
712312Gilchrist Construction Company, LLC$1,956,345.10
800044Guinn Construction, LLC$2,067,253.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Baker Pile Driving and Site Work, LLC
- 2 -
Louisiana Bridge, Inc.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
Matt L. Guinn Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP19,746.0519,746.0529,000.0029,000.0022,000.0022,000.0035,000.0035,000.00
0002202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,306.1   SQYD7.009,142.7012.0015,673.2015.0019,591.5012.0015,673.20
0003202-02-04501Removal of Bridge (Sta. 15+04.82, 20.15' Wide x 62.00' Long; TImber)1,249.3   LUMP32,211.3332,211.3315,000.0015,000.0030,000.0030,000.0030,000.0030,000.00
0004202-02-06100Removal of Concrete Walks and Drives 181     SQYD11.322,048.9217.003,077.0030.005,430.0020.003,620.00
0005202-02-26000Removal of Manholes 1     EACH1,255.631,255.631,500.001,500.007,500.007,500.001,500.001,500.00
0006202-02-32120Removal of Pipe (Side Drain) (Side Drain)255     LNFT25.026,380.1030.007,650.0025.006,375.0015.003,825.00
0007203-02-00100Drainage Excavation 912     CUYD26.6124,268.3218.0016,416.0025.0022,800.0035.0031,920.00
0008203-05-00100Excavation and Embankment 1     LUMP55,437.1055,437.1025,000.0025,000.0020,000.0020,000.0035,000.0035,000.00
0009204-02-00100Temporary Hay Bales 32     EACH30.83986.5650.001,600.0035.001,120.00100.003,200.00
0010204-03-00100Temporary Slope Drains 80     LNFT47.423,793.6050.004,000.0095.007,600.0010.00800.00
0011204-05-00100Temporary Sediment Check Dams (Hay) 4     EACH289.051,156.20250.001,000.00150.00600.00400.001,600.00
0012204-06-00100Temporary Silt Fencing 1,236     LNFT4.325,339.524.255,253.002.002,472.005.006,180.00
0013302-01-00300Class II Base Course (Crushed Stone) 380.4   CUYD167.0063,526.80227.0086,350.80125.0047,550.00210.0079,884.00
0014304-01-00100Lime 22.84  TON444.0010,140.96455.0010,392.20460.0010,506.40300.006,852.00
0015304-05-00100Lime Treatment (Type E) 1,611     SQYD13.3321,474.6315.0024,165.007.0011,277.0018.0028,998.00
0016401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 4     CUYD381.801,527.20500.002,000.00140.00560.00100.00400.00
0017402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 25     CUYD187.974,699.25240.006,000.0095.002,375.00100.002,500.00
0018502-01-00100Asphalt Concrete 303.5   TON425.00128,987.50300.0091,050.00190.0057,665.00350.00106,225.00
0019509-01-00100Milling Asphalt Pavement 1,243     SQYD21.2826,451.0419.0023,617.004.004,972.0015.0018,645.00
0020511-01-00100Saw Cutting Asphalt Concrete Pavement 485     INLF8.484,112.805.002,425.004.001,940.0030.0014,550.00
0021601-05-00100Saw Cutting Portland Cement Concrete Pavement 468     INLF8.794,113.726.002,808.004.001,872.0040.0018,720.00
0022701-05-01043Side Drain Pipe (18" RCP/RPVCP/CMP) 64     LNFT62.393,992.96108.006,912.0095.006,080.0095.006,080.00
0023701-05-01062Side Drain Pipe (24" RCP/RPVCP/CMP) 130     LNFT74.499,683.70120.0015,600.00100.0013,000.00135.0017,550.00
0024701-05-02042Side Drain Pipe (Erosion) (18" RPVCP/CMP) 50     LNFT74.633,731.50118.005,900.00125.006,250.00100.005,000.00
0025701-05-02062Side Drain Pipe (Erosion) (24" RPVCP/CMP) 180     LNFT67.9512,231.0095.0017,100.0090.0016,200.00135.0024,300.00
0026701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 133     LNFT73.879,824.715.00665.0030.003,990.0025.003,325.00
0027702-02-00200Manholes (R-CB-11) 1     EACH5,462.765,462.768,500.008,500.0015,000.0015,000.007,500.007,500.00
0028702-03-00100Catch Basins (CB-01) 1     EACH6,575.766,575.769,000.009,000.0010,000.0010,000.008,000.008,000.00
0029704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 50     LNFT28.421,421.0040.002,000.0035.501,775.0045.002,250.00
0030704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT91.069,106.00155.0015,500.00135.0013,500.00100.0010,000.00
0031704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH3,204.0512,816.204,300.0017,200.003,750.0015,000.004,000.0016,000.00
0032706-02-00200Concrete Drive (6" Thick) 174.5   SQYD111.0819,383.4680.0013,960.00150.0026,175.0095.0016,577.50
0033711-01-04000Riprap (55 lb, 18" Thick) 670     SQYD98.1865,780.6095.0063,650.00105.0070,350.00135.0090,450.00
0034711-04-00100Geotextile Fabric 670     SQYD4.983,336.604.503,015.001.00670.005.003,350.00
0035713-01-00100Temporary Signs and Barricades 1     LUMP16,049.2016,049.2018,000.0018,000.0080,000.0080,000.0030,000.0030,000.00
0036716-01-00100Mulch (Vegetative) 1.6   TON2,180.003,488.003,400.005,440.001,500.002,400.003,000.004,800.00
0037717-01-00100Seeding 41     LB28.851,182.8530.001,230.0025.001,025.0030.001,230.00
0038718-01-00100Fertilizer 810     LB1.441,166.402.001,620.000.75607.501.00810.00
0039726-01-00100Bedding Material 3.2   CUYD332.001,062.40430.001,376.00180.00576.00200.00640.00
0040727-01-00100Mobilization 1     LUMP117,760.91117,760.91145,000.00145,000.00150,000.00150,000.00150,000.00150,000.00
0041729-16-00300Object Marker Assembly (Type 3) 4     EACH183.05732.20155.00620.00135.00540.00160.00640.00
0042740-01-00100Construction Layout 1     LUMP15,163.3515,163.3515,000.0015,000.0064,000.0064,000.0030,000.0030,000.00
0043804-01-00300Precast Concrete Piles (16") 1,872     LNFT132.03247,160.16143.00267,696.00150.00280,800.00155.00290,160.00
0044805-12-00500Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) 2,800     SQFT142.96400,288.00150.00420,000.00140.00392,000.00225.00630,000.00
0045805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,190     SQFT4.785,688.203.003,570.003.003,570.003.003,570.00
0046805-18-00200Concrete Finish (Class 3 Special Finish) 1,190     SQFT4.785,688.203.003,570.003.504,165.003.003,570.00
0047813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway; 90 Degree Crossing)580     SQFT117.1467,941.20132.0076,560.0097.0056,260.0095.0055,100.00
             
  CONTRACTOR TOTAL   1,473,517.25 1,512,661.20 1,518,139.40 1,855,994.70



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
WL Bass Construction Inc.
- 6 -
JB JAMES CONSTRUCTION LLC
- 7 -
Gilchrist Construction Company, LLC
- 8 -
Guinn Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP35,500.0035,500.00200,000.00200,000.0065,000.0065,000.0030,000.0030,000.00
0002202-02-03000Removal of Base – Soil Cement, Asphalt, or BCS 1,306.1   SQYD5.006,530.5010.0013,061.0015.0019,591.5015.0019,591.50
0003202-02-04501Removal of Bridge (Sta. 15+04.82, 20.15' Wide x 62.00' Long; TImber)1,249.3   LUMP67,700.0067,700.00150,000.00150,000.0057,000.0057,000.0040,000.0040,000.00
0004202-02-06100Removal of Concrete Walks and Drives 181     SQYD2.00362.0030.005,430.0032.005,792.0015.002,715.00
0005202-02-26000Removal of Manholes 1     EACH1,500.001,500.001,500.001,500.005,000.005,000.002,500.002,500.00
0006202-02-32120Removal of Pipe (Side Drain) (Side Drain)255     LNFT20.005,100.0030.007,650.0070.0017,850.0025.006,375.00
0007203-02-00100Drainage Excavation 912     CUYD22.0020,064.0028.0025,536.0028.0025,536.0030.0027,360.00
0008203-05-00100Excavation and Embankment 1     LUMP44,000.0044,000.0060,000.0060,000.00100,000.00100,000.0050,000.0050,000.00
0009204-02-00100Temporary Hay Bales 32     EACH35.001,120.0035.001,120.0035.001,120.00150.004,800.00
0010204-03-00100Temporary Slope Drains 80     LNFT200.0016,000.0075.006,000.0020.001,600.0010.00800.00
0011204-05-00100Temporary Sediment Check Dams (Hay) 4     EACH150.00600.00150.00600.00200.00800.00600.002,400.00
0012204-06-00100Temporary Silt Fencing 1,236     LNFT3.003,708.005.006,180.004.004,944.004.004,944.00
0013302-01-00300Class II Base Course (Crushed Stone) 380.4   CUYD230.0087,492.00175.0066,570.00200.0076,080.00250.0095,100.00
0014304-01-00100Lime 22.84  TON400.009,136.00300.006,852.00400.009,136.001,000.0022,840.00
0015304-05-00100Lime Treatment (Type E) 1,611     SQYD7.0011,277.008.0012,888.006.009,666.0016.0025,776.00
0016401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 4     CUYD170.00680.001,000.004,000.00600.002,400.00500.002,000.00
0017402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 25     CUYD130.003,250.00250.006,250.00200.005,000.00100.002,500.00
0018502-01-00100Asphalt Concrete 303.5   TON300.0091,050.00300.0091,050.00300.0091,050.00375.00113,812.50
0019509-01-00100Milling Asphalt Pavement 1,243     SQYD19.0023,617.0020.0024,860.0015.0018,645.0018.0022,374.00
0020511-01-00100Saw Cutting Asphalt Concrete Pavement 485     INLF1.00485.001.00485.0010.004,850.0010.004,850.00
0021601-05-00100Saw Cutting Portland Cement Concrete Pavement 468     INLF2.00936.001.50702.0010.004,680.0012.505,850.00
0022701-05-01043Side Drain Pipe (18" RCP/RPVCP/CMP) 64     LNFT80.005,120.00170.0010,880.00175.0011,200.00125.008,000.00
0023701-05-01062Side Drain Pipe (24" RCP/RPVCP/CMP) 130     LNFT130.0016,900.00170.0022,100.00190.0024,700.00225.0029,250.00
0024701-05-02042Side Drain Pipe (Erosion) (18" RPVCP/CMP) 50     LNFT85.004,250.00150.007,500.00210.0010,500.00125.006,250.00
0025701-05-02062Side Drain Pipe (Erosion) (24" RPVCP/CMP) 180     LNFT110.0019,800.00180.0032,400.00210.0037,800.00225.0040,500.00
0026701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 133     LNFT300.0039,900.001.00133.0050.006,650.0010.001,330.00
0027702-02-00200Manholes (R-CB-11) 1     EACH12,000.0012,000.0017,000.0017,000.0020,000.0020,000.006,500.006,500.00
0028702-03-00100Catch Basins (CB-01) 1     EACH6,500.006,500.0010,000.0010,000.0015,000.0015,000.007,500.007,500.00
0029704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 50     LNFT35.001,750.0025.001,250.0026.001,300.0050.002,500.00
0030704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT120.0012,000.0085.008,500.0086.008,600.00150.0015,000.00
0031704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH3,200.0012,800.003,000.0012,000.003,100.0012,400.005,500.0022,000.00
0032706-02-00200Concrete Drive (6" Thick) 174.5   SQYD160.0027,920.00100.0017,450.00180.0031,410.00250.0043,625.00
0033711-01-04000Riprap (55 lb, 18" Thick) 670     SQYD100.0067,000.00140.0093,800.00105.0070,350.00135.0090,450.00
0034711-04-00100Geotextile Fabric 670     SQYD5.003,350.004.002,680.007.004,690.005.003,350.00
0035713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.0040,000.0040,000.0075,000.0075,000.0025,000.0025,000.00
0036716-01-00100Mulch (Vegetative) 1.6   TON1,500.002,400.001,500.002,400.003,700.005,920.003,500.005,600.00
0037717-01-00100Seeding 41     LB25.001,025.0025.001,025.0013.00533.0050.002,050.00
0038718-01-00100Fertilizer 810     LB1.00810.000.70567.001.00810.002.001,620.00
0039726-01-00100Bedding Material 3.2   CUYD200.00640.00300.00960.0088.00281.60500.001,600.00
0040727-01-00100Mobilization 1     LUMP190,300.00190,300.00190,000.00190,000.00190,000.00190,000.00200,000.00200,000.00
0041729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.00150.00600.00150.00600.00200.00800.00
0042740-01-00100Construction Layout 1     LUMP50,000.0050,000.0040,000.0040,000.0025,000.0025,000.0020,000.0020,000.00
0043804-01-00300Precast Concrete Piles (16") 1,872     LNFT170.00318,240.00175.00327,600.00160.00299,520.00160.00299,520.00
0044805-12-00500Bridge Superstructure and Substructure (28' Roadway, 90 Degree Crossing) 2,800     SQFT185.00518,000.00120.00336,000.00175.00490,000.00240.00672,000.00
0045805-18-00100Concrete Finish (Class 2 Rubbed Finish) 1,190     SQFT1.001,190.001.001,190.003.003,570.004.004,760.00
0046805-18-00200Concrete Finish (Class 3 Special Finish) 1,190     SQFT1.001,190.005.005,950.003.003,570.004.004,760.00
0047813-01-00100Concrete Approach Slabs (Cast-in-Place) (28' Clear Roadway; 90 Degree Crossing)580     SQFT190.00110,200.00120.0069,600.00140.0081,200.00115.0066,700.00
             
  CONTRACTOR TOTAL   1,903,792.50 1,942,319.00 1,956,345.10 2,067,253.00