Proposal:H.014228.6
Parish:Webster
Routes:LA 159
Description:LA 159: BRIDGES NEAR SHONGALOO
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF BRIDGE, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, REINFORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$9,140,963.35
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $7,254,277.90 |
| 2 | 71454 | Chief Bridge & Concrete LLC | $7,457,268.20 |
| 3 | 27239 | Apeck Construction, LLC | $8,182,875.35 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $8,712,535.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - Chief Bridge & Concrete LLC | - 3 - Apeck Construction, LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 200,000.00 | 200,000.00 | 218,000.00 | 218,000.00 | 111,971.35 | 111,971.35 | 700,000.00 | 700,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,000.00 | 9,000.00 | 15,600.00 | 15,600.00 | 22,059.91 | 22,059.91 | 12,000.00 | 12,000.00 | | 0003 | 202-02-00010 | Removal of Removal of Gate | 1 | EACH | 350.00 | 350.00 | 500.00 | 500.00 | 544.75 | 544.75 | 800.00 | 800.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 58 | SQYD | 6.00 | 348.00 | 13.50 | 783.00 | 17.65 | 1,023.70 | 22.00 | 1,276.00 | | 0005 | 202-02-03030 | Removal of Pavement Structure | 8,422.1 | SQYD | 8.00 | 67,376.80 | 6.00 | 50,532.60 | 11.08 | 93,316.87 | 15.50 | 130,542.55 | | 0006 | 202-02-04501 | Removal of Bridge (STA. 114+53.51; 24'(CLR.) x 57' COPCSS) | 1,368 | LUMP | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 235,527.08 | 235,527.08 | 80,000.00 | 80,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (STA. 214+47.68; 24'(CLR.) x 38' COPCSS) | 912 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 22,277.80 | 22,277.80 | 40,000.00 | 40,000.00 | | 0008 | 202-02-04501 | Removal of Bridge (STA. 322+28.74; 24'(CLR.) x 114' COPCSS) | 2,736 | LUMP | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 436,279.04 | 436,279.04 | 70,000.00 | 70,000.00 | | 0009 | 202-02-04501 | Removal of Bridge (STA. 330+72.89; 24'(CLR.) x 114' COPCSS) | 2,736 | LUMP | 75,000.00 | 75,000.00 | 150,000.00 | 150,000.00 | 436,279.04 | 436,279.04 | 70,000.00 | 70,000.00 | | 0010 | 202-02-12000 | Removal of Fence | 389 | LNFT | 2.00 | 778.00 | 5.00 | 1,945.00 | 9.37 | 3,644.93 | 3.00 | 1,167.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 2,019 | LNFT | 9.00 | 18,171.00 | 10.00 | 20,190.00 | 10.84 | 21,885.96 | 8.00 | 16,152.00 | | 0012 | 203-02-00100 | Drainage Excavation | 4,384 | CUYD | 22.00 | 96,448.00 | 17.25 | 75,624.00 | 17.96 | 78,736.64 | 30.00 | 131,520.00 | | 0013 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 155,000.00 | 155,000.00 | 326,101.53 | 326,101.53 | 300,000.00 | 300,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 200.00 | 2,200.00 | 200.00 | 2,200.00 | 238.24 | 2,620.64 | 200.00 | 2,200.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 5,534 | LNFT | 3.00 | 16,602.00 | 3.25 | 17,985.50 | 4.76 | 26,341.84 | 7.00 | 38,738.00 | | 0016 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 8,230.8 | SQYD | 45.00 | 370,386.00 | 56.00 | 460,924.80 | 87.93 | 723,734.24 | 60.00 | 493,848.00 | | 0017 | 302-03-00100 | Base Drain Outlet | 22 | EACH | 1,500.00 | 33,000.00 | 1,050.00 | 23,100.00 | 1,780.34 | 39,167.48 | 1,300.00 | 28,600.00 | | 0018 | 304-01-00100 | Lime | 58.33 | TON | 470.00 | 27,415.10 | 400.00 | 23,332.00 | 447.23 | 26,086.93 | 300.00 | 17,499.00 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 4,117 | SQYD | 6.00 | 24,702.00 | 7.00 | 28,819.00 | 1.19 | 4,899.23 | 9.00 | 37,053.00 | | 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 31.1 | CUYD | 146.00 | 4,540.60 | 275.00 | 8,552.50 | 199.17 | 6,194.19 | 200.00 | 6,220.00 | | 0021 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 60 | CUYD | 110.00 | 6,600.00 | 250.00 | 15,000.00 | 199.16 | 11,949.60 | 200.00 | 12,000.00 | | 0022 | 502-01-00100 | Asphalt Concrete | 1,803.6 | TON | 270.00 | 486,972.00 | 225.00 | 405,810.00 | 266.66 | 480,947.98 | 270.00 | 486,972.00 | | 0023 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 221.9 | TON | 350.00 | 77,665.00 | 230.00 | 51,037.00 | 259.97 | 57,687.34 | 350.00 | 77,665.00 | | 0024 | 510-01-00001 | Pavement Patching (14.5" Minimum Thickness) | 168 | SQYD | 381.00 | 64,008.00 | 240.00 | 40,320.00 | 250.57 | 42,095.76 | 350.00 | 58,800.00 | | 0025 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,234 | INLF | 1.00 | 1,234.00 | 1.00 | 1,234.00 | 3.53 | 4,356.02 | 2.25 | 2,776.50 | | 0026 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 576 | LNFT | 7.00 | 4,032.00 | 3.50 | 2,016.00 | 9.95 | 5,731.20 | 13.00 | 7,488.00 | | 0027 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 768 | LNFT | 1.00 | 768.00 | 2.00 | 1,536.00 | 10.49 | 8,056.32 | 3.50 | 2,688.00 | | 0028 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 144 | LNFT | 130.00 | 18,720.00 | 128.00 | 18,432.00 | 126.51 | 18,217.44 | 170.00 | 24,480.00 | | 0029 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 120 | LNFT | 180.00 | 21,600.00 | 192.00 | 23,040.00 | 189.83 | 22,779.60 | 250.00 | 30,000.00 | | 0030 | 701-06-02020 | Side Drain Pipe Arch (Erosion) (18" CMPA) | 248 | LNFT | 150.00 | 37,200.00 | 115.00 | 28,520.00 | 114.16 | 28,311.68 | 180.00 | 44,640.00 | | 0031 | 701-06-02080 | Side Drain Pipe Arch (Erosion) (36" CMPA) | 144 | LNFT | 160.00 | 23,040.00 | 182.00 | 26,208.00 | 175.54 | 25,277.76 | 220.00 | 31,680.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 7,000.00 | 21,000.00 | 10,500.00 | 31,500.00 | 4,474.95 | 13,424.85 | 8,000.00 | 24,000.00 | | 0033 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 7,000.00 | 7,000.00 | 3,000.00 | 3,000.00 | 7,309.97 | 7,309.97 | 8,500.00 | 8,500.00 | | 0034 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 350.1 | LNFT | 34.00 | 11,903.40 | 40.00 | 14,004.00 | 40.50 | 14,179.05 | 34.00 | 11,903.40 | | 0035 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 120.00 | 36,000.00 | 125.00 | 37,500.00 | 142.94 | 42,882.00 | 120.00 | 36,000.00 | | 0036 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 5 | EACH | 3,400.00 | 17,000.00 | 4,000.00 | 20,000.00 | 3,692.65 | 18,463.25 | 3,400.00 | 17,000.00 | | 0037 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 3,100.00 | 21,700.00 | 4,000.00 | 28,000.00 | 4,050.00 | 28,350.00 | 3,100.00 | 21,700.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 15 | EACH | 300.00 | 4,500.00 | 650.00 | 9,750.00 | 774.27 | 11,614.05 | 650.00 | 9,750.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 15 | EACH | 200.00 | 3,000.00 | 200.00 | 3,000.00 | 238.24 | 3,573.60 | 200.00 | 3,000.00 | | 0040 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 5,049 | SQYD | 120.00 | 605,880.00 | 115.00 | 580,635.00 | 100.00 | 504,900.00 | 100.00 | 504,900.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 5,049 | SQYD | 3.00 | 15,147.00 | 2.50 | 12,622.50 | 2.46 | 12,420.54 | 2.00 | 10,098.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 60,000.00 | 60,000.00 | 65,514.76 | 65,514.76 | 140,000.00 | 140,000.00 | | 0043 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 850.00 | 6,800.00 | 1,000.00 | 8,000.00 | 1,012.50 | 8,100.00 | 1,000.00 | 8,000.00 | | 0044 | 717-01-00100 | Seeding | 158 | LB | 13.00 | 2,054.00 | 20.00 | 3,160.00 | 15.49 | 2,447.42 | 20.00 | 3,160.00 | | 0045 | 718-01-00100 | Fertilizer | 5,286 | LB | 1.00 | 5,286.00 | 0.90 | 4,757.40 | 0.83 | 4,387.38 | 0.90 | 4,757.40 | | 0046 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 108 | SQYD | 3.00 | 324.00 | 5.00 | 540.00 | 3.57 | 385.56 | 5.00 | 540.00 | | 0047 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 532 | SQYD | 4.00 | 2,128.00 | 4.10 | 2,181.20 | 4.76 | 2,532.32 | 4.00 | 2,128.00 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 121,225.82 | 121,225.82 | 30,000.00 | 30,000.00 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.896 | MILE | 1,000.00 | 896.00 | 1,000.00 | 896.00 | 1,196.50 | 1,072.06 | 1,000.00 | 896.00 | | 0050 | 726-01-00100 | Bedding Material | 74.4 | CUYD | 145.00 | 10,788.00 | 160.00 | 11,904.00 | 184.92 | 13,758.05 | 200.00 | 14,880.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 725,400.00 | 725,400.00 | 750,000.00 | 750,000.00 | 147,595.37 | 147,595.37 | 850,000.00 | 850,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 23.6 | SQFT | 35.00 | 826.00 | 45.00 | 1,062.00 | 59.56 | 1,405.62 | 35.00 | 826.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 100.00 | 1,600.00 | 125.00 | 2,000.00 | 119.12 | 1,905.92 | 100.00 | 1,600.00 | | 0054 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 200.00 | 600.00 | 180.00 | 540.00 | 297.79 | 893.37 | 300.00 | 900.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 71 | EACH | 8.00 | 568.00 | 8.00 | 568.00 | 9.53 | 676.63 | 8.00 | 568.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.339 | MILE | 6,500.00 | 8,703.50 | 6,500.00 | 8,703.50 | 7,748.44 | 10,375.16 | 6,500.00 | 8,703.50 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.548 | MILE | 5,000.00 | 2,740.00 | 5,000.00 | 2,740.00 | 5,977.63 | 3,275.74 | 5,100.00 | 2,794.80 | | 0058 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 65,900.00 | 65,900.00 | 22,716.58 | 22,716.58 | 100,000.00 | 100,000.00 | | 0059 | 804-01-00400 | Precast Concrete Piles (18") | 6,000 | LNFT | 164.00 | 984,000.00 | 160.00 | 960,000.00 | 88.15 | 528,900.00 | 200.00 | 1,200,000.00 | | 0060 | 805-01-00100 | Class A1 Concrete (Slab Span) | 639.8 | CUYD | 350.00 | 223,930.00 | 1,350.00 | 863,730.00 | 2,001.08 | 1,280,290.98 | 1,400.00 | 895,720.00 | | 0061 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 195.04 | CUYD | 350.00 | 68,264.00 | 2,250.00 | 438,840.00 | 2,827.42 | 551,460.00 | 2,400.00 | 468,096.00 | | 0062 | 805-13-02100 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (8' x 8') | 192 | LNFT | 2,000.00 | 384,000.00 | 1,600.00 | 307,200.00 | 1,367.67 | 262,592.64 | 2,400.00 | 460,800.00 | | 0063 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (3-8' x 8' 75 degree RCB, 20.98 CUYD, 1163 LBS) | 2 | EACH | 105,000.00 | 210,000.00 | 65,000.00 | 130,000.00 | 37,667.10 | 75,334.20 | 33,000.00 | 66,000.00 | | 0064 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 5,492 | SQFT | 1.00 | 5,492.00 | 3.00 | 16,476.00 | 7.56 | 41,519.52 | 1.50 | 8,238.00 | | 0065 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 5,492 | SQFT | 1.00 | 5,492.00 | 3.00 | 16,476.00 | 7.56 | 41,519.52 | 2.00 | 10,984.00 | | 0066 | 806-01-00100 | Deformed Reinforcing Steel | 149,458 | LB | 4.00 | 597,832.00 | 1.40 | 209,241.20 | 1.34 | 200,273.72 | 1.50 | 224,187.00 | | 0067 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 800 | LNFT | 250.00 | 200,000.00 | 225.00 | 180,000.00 | 332.15 | 265,720.00 | 200.00 | 160,000.00 | | 0068 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,840 | SQFT | 160.00 | 614,400.00 | 125.00 | 480,000.00 | 127.12 | 488,140.80 | 100.00 | 384,000.00 | | 0069 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 500 | SFIN | 60.00 | 30,000.00 | 100.00 | 50,000.00 | 95.29 | 47,645.00 | 90.00 | 45,000.00 | | 0070 | 815-03-00300 | Joint Seal (Poured) | 805 | LNFT | 13.50 | 10,867.50 | 20.00 | 16,100.00 | 12.41 | 9,990.05 | 20.00 | 16,100.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,254,277.90 | | 7,457,268.20 | | 8,182,875.35 | | 8,712,535.15 |
|