Proposal:H.013555.6
Parish:Livingston
Description:PENDARVIS LANE IMPROVEMENTS PHASE II
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,939,583.11
| Rank | License | Bidder | Construction Bid |
| 1 | 46747 | Triumph Construction, LLC | $1,519,675.24 |
| 2 | 68237 | GULF STATES SERVICES, LLC | $1,688,126.66 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,858,074.60 |
| 4 | 48896 | Command Construction Industries LLC | $1,898,235.78 |
| 5 | 12031 | R.J. Daigle & Sons Contractors, Inc | $2,156,308.81 |
| 6 | 68424 | Procivil, LLC | $2,193,678.50 |
| 7 | 34263 | LA Contracting Enterprise, L.L.C. | $2,265,000.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Triumph Construction, LLC | - 2 - GULF STATES SERVICES, LLC | - 3 - Barriere Construction Co., LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 22,000.00 | 22,000.00 | 7,000.00 | 7,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 22,000.00 | 22,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 71 | SQYD | 37.00 | 2,627.00 | 27.00 | 1,917.00 | 25.00 | 1,775.00 | 15.00 | 1,065.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 714 | SQYD | 37.00 | 26,418.00 | 27.00 | 19,278.00 | 20.00 | 14,280.00 | 1.00 | 714.00 | | 0005 | 202-02-38240 | Removal of Signs and Supports | 24 | EACH | 35.00 | 840.00 | 20.00 | 480.00 | 150.00 | 3,600.00 | 1.00 | 24.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,760.00 | 45,760.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 1.00 | 1.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 461 | LNFT | 40.00 | 18,440.00 | 10.00 | 4,610.00 | 7.00 | 3,227.00 | 15.00 | 6,915.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 224 | EACH | 28.00 | 6,272.00 | 2.00 | 448.00 | 20.00 | 4,480.00 | 1.00 | 224.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 7,968 | LNFT | 4.00 | 31,872.00 | 0.10 | 796.80 | 2.00 | 15,936.00 | 1.00 | 7,968.00 | | 0010 | 401-01-00100 | Aggregate Surface Course (Net Section) | 15.2 | CUYD | 74.00 | 1,124.80 | 130.00 | 1,976.00 | 50.00 | 760.00 | 300.00 | 4,560.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 361.4 | CUYD | 73.00 | 26,382.20 | 90.00 | 32,526.00 | 100.00 | 36,140.00 | 1.00 | 361.40 | | 0012 | 502-01-00100 | Asphalt Concrete | 866.1 | TON | 159.00 | 137,709.90 | 138.00 | 119,521.80 | 138.00 | 119,521.80 | 175.00 | 151,567.50 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 216.3 | TON | 280.00 | 60,564.00 | 246.00 | 53,209.80 | 246.00 | 53,209.80 | 250.00 | 54,075.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement 2" depth | 8,612 | SQYD | 4.00 | 34,448.00 | 2.20 | 18,946.40 | 2.00 | 17,224.00 | 0.01 | 86.12 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,918 | SQYD | 117.00 | 224,406.00 | 120.00 | 230,160.00 | 117.00 | 224,406.00 | 160.00 | 306,880.00 | | 0016 | 510-02-00100 | Pavement Widening 12" min thickness | 524.5 | SQYD | 166.00 | 87,067.00 | 145.00 | 76,052.50 | 92.00 | 48,254.00 | 160.00 | 83,920.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 14,349 | INLF | 1.00 | 14,349.00 | 0.10 | 1,434.90 | 1.00 | 14,349.00 | 8.00 | 114,792.00 | | 0018 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 3,476 | INLF | 2.00 | 6,952.00 | 2.75 | 9,559.00 | 1.50 | 5,214.00 | 3.00 | 10,428.00 | | 0019 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 42 | LNFT | 458.00 | 19,236.00 | 600.00 | 25,200.00 | 540.00 | 22,680.00 | 500.00 | 21,000.00 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 597 | LNFT | 42.00 | 25,074.00 | 85.00 | 50,745.00 | 90.00 | 53,730.00 | 125.00 | 74,625.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 305 | LNFT | 57.00 | 17,385.00 | 115.00 | 35,075.00 | 130.00 | 39,650.00 | 150.00 | 45,750.00 | | 0023 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 481 | LNFT | 70.00 | 33,670.00 | 155.00 | 74,555.00 | 130.00 | 62,530.00 | 125.00 | 60,125.00 | | 0024 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,153 | LNFT | 97.00 | 111,841.00 | 155.00 | 178,715.00 | 150.00 | 172,950.00 | 150.00 | 172,950.00 | | 0025 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 235 | LNFT | 120.00 | 28,200.00 | 220.00 | 51,700.00 | 200.00 | 47,000.00 | 175.00 | 41,125.00 | | 0026 | 701-05-01050 | Side Drain Pipe (18" RCP/RPVCP) | 46 | LNFT | 58.00 | 2,668.00 | 155.00 | 7,130.00 | 110.00 | 5,060.00 | 110.00 | 5,060.00 | | 0027 | 701-06-00000 | Side Drain Pipe Arch (15" Equiv. RCPA) | 178 | LNFT | 65.00 | 11,570.00 | 155.00 | 27,590.00 | 130.00 | 23,140.00 | 100.00 | 17,800.00 | | 0028 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 70 | LNFT | 74.00 | 5,180.00 | 155.00 | 10,850.00 | 155.00 | 10,850.00 | 115.00 | 8,050.00 | | 0029 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 212 | LNFT | 95.00 | 20,140.00 | 165.00 | 34,980.00 | 180.00 | 38,160.00 | 140.00 | 29,680.00 | | 0030 | 701-06-00060 | Side Drain Pipe Arch (30" Equiv. RCPA) | 68 | LNFT | 140.00 | 9,520.00 | 245.00 | 16,660.00 | 200.00 | 13,600.00 | 160.00 | 10,880.00 | | 0031 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 42 | LNFT | 100.00 | 4,200.00 | 1.00 | 42.00 | 100.00 | 4,200.00 | 50.00 | 2,100.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 31 | EACH | 2,249.00 | 69,719.00 | 5,800.00 | 179,800.00 | 4,000.00 | 124,000.00 | 4,250.00 | 131,750.00 | | 0033 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 2,660.00 | 2,660.00 | 8,000.00 | 8,000.00 | 4,500.00 | 4,500.00 | 7,500.00 | 7,500.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 723 | SQYD | 90.00 | 65,070.00 | 85.00 | 61,455.00 | 140.00 | 101,220.00 | 80.00 | 57,840.00 | | 0035 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 64 | SQYD | 140.00 | 8,960.00 | 175.00 | 11,200.00 | 130.00 | 8,320.00 | 125.00 | 8,000.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 64 | SQYD | 21.00 | 1,344.00 | 5.00 | 320.00 | 4.00 | 256.00 | 3.00 | 192.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 19,620.00 | 19,620.00 | 75,000.00 | 75,000.00 | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | | 0038 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 13,676 | LNFT | 1.00 | 13,676.00 | 0.35 | 4,786.60 | 1.00 | 13,676.00 | 0.01 | 136.76 | | 0039 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 114 | LNFT | 9.00 | 1,026.00 | 1.00 | 114.00 | 1.00 | 114.00 | 10.00 | 1,140.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 279 | SQYD | 3.00 | 837.00 | 2.00 | 558.00 | 3.00 | 837.00 | 2.00 | 558.00 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 41 | SQYD | 5.00 | 205.00 | 3.00 | 123.00 | 3.00 | 123.00 | 3.00 | 123.00 | | 0042 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 15 | SQYD | 4.00 | 60.00 | 3.00 | 45.00 | 3.00 | 45.00 | 3.00 | 45.00 | | 0043 | 726-01-00100 | Bedding Material | 411.1 | CUYD | 82.00 | 33,710.20 | 1.00 | 411.10 | 110.00 | 45,221.00 | 50.00 | 20,555.00 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 183,280.00 | 183,280.00 | 85,000.00 | 85,000.00 | 170,000.00 | 170,000.00 | 200,000.00 | 200,000.00 | | 0045 | 729-01-00100 | Sign (Type A) | 130.8 | SQFT | 41.00 | 5,362.80 | 25.00 | 3,270.00 | 30.00 | 3,924.00 | 25.00 | 3,270.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 100.00 | 400.00 | 110.00 | 440.00 | 250.00 | 1,000.00 | | 0047 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 20 | EACH | 12.00 | 240.00 | 150.00 | 3,000.00 | 400.00 | 8,000.00 | 250.00 | 5,000.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 171 | EACH | 12.00 | 2,052.00 | 7.00 | 1,197.00 | 9.00 | 1,539.00 | 10.00 | 1,710.00 | | 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 114 | LNFT | 26.00 | 2,964.00 | 11.00 | 1,254.00 | 12.00 | 1,368.00 | 20.00 | 2,280.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.59 | MILE | 5,850.00 | 15,151.50 | 5,000.00 | 12,950.00 | 5,500.00 | 14,245.00 | 5,000.00 | 12,950.00 | | 0051 | 735-01-00100 | Mailboxes | 34 | EACH | 35.00 | 1,190.00 | 50.00 | 1,700.00 | 50.00 | 1,700.00 | 50.00 | 1,700.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 34 | EACH | 295.00 | 10,030.00 | 100.00 | 3,400.00 | 300.00 | 10,200.00 | 100.00 | 3,400.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 2.12 | ACRE | 3,232.00 | 6,851.84 | 2,823.00 | 5,984.76 | 3,500.00 | 7,420.00 | 3,000.00 | 6,360.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,310.00 | 17,310.00 | 12,000.00 | 12,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,519,675.24 | | 1,688,126.66 | | 1,858,074.60 | | 1,898,235.78 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - R.J. Daigle & Sons Contractors, Inc | - 6 - Procivil, LLC | - 7 - LA Contracting Enterprise, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 206,400.00 | 206,400.00 | 35,000.00 | 35,000.00 | 216,998.45 | 216,998.45 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,000.00 | 9,000.00 | 5,000.00 | 5,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 71 | SQYD | 18.00 | 1,278.00 | 25.00 | 1,775.00 | 14.50 | 1,029.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 714 | SQYD | 18.00 | 12,852.00 | 25.00 | 17,850.00 | 18.50 | 13,209.00 | | 0005 | 202-02-38240 | Removal of Signs and Supports | 24 | EACH | 30.00 | 720.00 | 30.00 | 720.00 | 28.00 | 672.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 36,000.00 | 36,000.00 | 50,000.00 | 50,000.00 | 116,000.00 | 116,000.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 461 | LNFT | 24.00 | 11,064.00 | 20.00 | 9,220.00 | 16.00 | 7,376.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 224 | EACH | 23.94 | 5,362.56 | 25.00 | 5,600.00 | 22.50 | 5,040.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 7,968 | LNFT | 2.75 | 21,912.00 | 2.00 | 15,936.00 | 2.50 | 19,920.00 | | 0010 | 401-01-00100 | Aggregate Surface Course (Net Section) | 15.2 | CUYD | 345.00 | 5,244.00 | 150.00 | 2,280.00 | 159.00 | 2,416.80 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 361.4 | CUYD | 74.40 | 26,888.16 | 100.00 | 36,140.00 | 170.00 | 61,438.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 866.1 | TON | 126.14 | 109,249.85 | 175.00 | 151,567.50 | 155.00 | 134,245.50 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 216.3 | TON | 203.35 | 43,984.61 | 275.00 | 59,482.50 | 220.00 | 47,586.00 | | 0014 | 509-01-00100 | Milling Asphalt Pavement 2" depth | 8,612 | SQYD | 2.93 | 25,233.16 | 5.00 | 43,060.00 | 3.50 | 30,142.00 | | 0015 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,918 | SQYD | 93.99 | 180,272.82 | 150.00 | 287,700.00 | 110.00 | 210,980.00 | | 0016 | 510-02-00100 | Pavement Widening 12" min thickness | 524.5 | SQYD | 144.90 | 76,000.05 | 250.00 | 131,125.00 | 204.00 | 106,998.00 | | 0017 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 14,349 | INLF | 0.90 | 12,914.10 | 2.00 | 28,698.00 | 0.85 | 12,196.65 | | 0018 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 3,476 | INLF | 1.50 | 5,214.00 | 2.00 | 6,952.00 | 1.25 | 4,345.00 | | 0019 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 42 | LNFT | 600.00 | 25,200.00 | 800.00 | 33,600.00 | 802.00 | 33,684.00 | | 0020 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 597 | LNFT | 168.00 | 100,296.00 | 150.00 | 89,550.00 | 118.00 | 70,446.00 | | 0021 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 305 | LNFT | 198.00 | 60,390.00 | 170.00 | 51,850.00 | 145.00 | 44,225.00 | | 0023 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 481 | LNFT | 168.00 | 80,808.00 | 160.00 | 76,960.00 | 137.00 | 65,897.00 | | 0024 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,153 | LNFT | 198.00 | 228,294.00 | 200.00 | 230,600.00 | 154.00 | 177,562.00 | | 0025 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 235 | LNFT | 228.00 | 53,580.00 | 250.00 | 58,750.00 | 182.00 | 42,770.00 | | 0026 | 701-05-01050 | Side Drain Pipe (18" RCP/RPVCP) | 46 | LNFT | 150.00 | 6,900.00 | 100.00 | 4,600.00 | 122.00 | 5,612.00 | | 0027 | 701-06-00000 | Side Drain Pipe Arch (15" Equiv. RCPA) | 178 | LNFT | 138.00 | 24,564.00 | 120.00 | 21,360.00 | 109.00 | 19,402.00 | | 0028 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 70 | LNFT | 156.00 | 10,920.00 | 140.00 | 9,800.00 | 150.00 | 10,500.00 | | 0029 | 701-06-00040 | Side Drain Pipe Arch (24" Equiv. RCPA) | 212 | LNFT | 186.00 | 39,432.00 | 160.00 | 33,920.00 | 150.00 | 31,800.00 | | 0030 | 701-06-00060 | Side Drain Pipe Arch (30" Equiv. RCPA) | 68 | LNFT | 210.00 | 14,280.00 | 200.00 | 13,600.00 | 159.00 | 10,812.00 | | 0031 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 42 | LNFT | 60.00 | 2,520.00 | 10.00 | 420.00 | 35.00 | 1,470.00 | | 0032 | 702-03-00100 | Catch Basins (CB-01) | 31 | EACH | 6,000.00 | 186,000.00 | 6,000.00 | 186,000.00 | 4,700.00 | 145,700.00 | | 0033 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 12,000.00 | 12,000.00 | 8,000.00 | 8,000.00 | 6,300.00 | 6,300.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 723 | SQYD | 90.62 | 65,518.26 | 115.00 | 83,145.00 | 111.00 | 80,253.00 | | 0035 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 64 | SQYD | 120.00 | 7,680.00 | 135.00 | 8,640.00 | 174.00 | 11,136.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 64 | SQYD | 1.20 | 76.80 | 10.00 | 640.00 | 1.25 | 80.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 162,000.00 | 162,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0038 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 13,676 | LNFT | 0.24 | 3,282.24 | 0.50 | 6,838.00 | 0.25 | 3,419.00 | | 0039 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 114 | LNFT | 1.20 | 136.80 | 1.50 | 171.00 | 1.00 | 114.00 | | 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 279 | SQYD | 2.39 | 666.81 | 3.00 | 837.00 | 3.00 | 837.00 | | 0041 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 41 | SQYD | 3.23 | 132.43 | 4.00 | 164.00 | 3.00 | 123.00 | | 0042 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 15 | SQYD | 3.23 | 48.45 | 4.00 | 60.00 | 3.00 | 45.00 | | 0043 | 726-01-00100 | Bedding Material | 411.1 | CUYD | 60.00 | 24,666.00 | 125.00 | 51,387.50 | 170.00 | 69,887.00 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 177,150.00 | 177,150.00 | 150,000.00 | 150,000.00 | 210,000.00 | 210,000.00 | | 0045 | 729-01-00100 | Sign (Type A) | 130.8 | SQFT | 42.00 | 5,493.60 | 50.00 | 6,540.00 | 40.00 | 5,232.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 114.00 | 456.00 | 125.00 | 500.00 | 107.00 | 428.00 | | 0047 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 20 | EACH | 234.00 | 4,680.00 | 250.00 | 5,000.00 | 221.00 | 4,420.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 171 | EACH | 7.20 | 1,231.20 | 10.00 | 1,710.00 | 6.50 | 1,111.50 | | 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 114 | LNFT | 19.20 | 2,188.80 | 15.00 | 1,710.00 | 18.00 | 2,052.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.59 | MILE | 5,760.00 | 14,918.40 | 6,000.00 | 15,540.00 | 5,440.00 | 14,089.60 | | 0051 | 735-01-00100 | Mailboxes | 34 | EACH | 36.00 | 1,224.00 | 100.00 | 3,400.00 | 34.00 | 1,156.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 34 | EACH | 306.00 | 10,404.00 | 200.00 | 6,800.00 | 290.00 | 9,860.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 2.12 | ACRE | 3,387.60 | 7,181.71 | 4,000.00 | 8,480.00 | 3,200.00 | 6,784.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 32,400.00 | 32,400.00 | 35,000.00 | 35,000.00 | 32,200.00 | 32,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,156,308.81 | | 2,193,678.50 | | 2,265,000.00 |
|