Proposal:H.013142.6
Parish:St. Martin
Description:CHES COURVILLE RD OVER COULEE NICOLE G.
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,757,186.20
| Rank | License | Bidder | Construction Bid |
| 1 | 01516 | Elevate Heavy Civil Construction, LLC | $1,586,019.30 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $1,665,886.50 |
| 3 | 67770 | Reliant Industrial Solutions L.L.C. | $1,675,819.35 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $1,701,869.63 |
| 5 | 00009 | Coastal Contractors, LLC | $1,799,559.50 |
| 6 | 00044 | Guinn Construction, LLC | $1,821,257.50 |
| 7 | 12312 | Gilchrist Construction Company, LLC | $1,846,989.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elevate Heavy Civil Construction, LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - Reliant Industrial Solutions L.L.C. | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 4,500.00 | 4,500.00 | 2,170.00 | 2,170.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 872 | SQYD | 10.00 | 8,720.00 | 5.00 | 4,360.00 | 7.10 | 6,191.20 | 9.00 | 7,848.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 872 | SQYD | 10.00 | 8,720.00 | 10.00 | 8,720.00 | 11.00 | 9,592.00 | 11.80 | 10,289.60 | | 0005 | 202-02-04501 | Removal of Bridge STA. 100+00; 22' X 38' PRECAST CONC. BRIDGE W/ TIMBER SUBSTRUCTURE & METAL GUARD RAILS | 836 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | | 0006 | 203-02-00100 | Drainage Excavation | 500 | CUYD | 12.00 | 6,000.00 | 28.00 | 14,000.00 | 35.00 | 17,500.00 | 31.00 | 15,500.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 55,000.00 | 55,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 16 | EACH | 55.00 | 880.00 | 30.00 | 480.00 | 33.00 | 528.00 | 37.50 | 600.00 | | 0009 | 204-03-00100 | Temporary Slope Drains | 170 | LNFT | 25.00 | 4,250.00 | 15.00 | 2,550.00 | 13.50 | 2,295.00 | 52.50 | 8,925.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 915 | LNFT | 3.00 | 2,745.00 | 7.00 | 6,405.00 | 3.00 | 2,745.00 | 2.50 | 2,287.50 | | 0011 | 302-02-08530 | Class II Base Course (8-1/2" Thick) (Asphalt Concrete Base on Embankment Layer) | 994.1 | SQYD | 88.00 | 87,480.80 | 45.00 | 44,734.50 | 98.00 | 97,421.80 | 55.00 | 54,675.50 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 1,000.00 | 3,000.00 | 500.00 | 1,500.00 | 335.00 | 1,005.00 | 140.00 | 420.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 187.4 | TON | 335.00 | 62,779.00 | 300.00 | 56,220.00 | 200.00 | 37,480.00 | 345.00 | 64,653.00 | | 0014 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 128 | INLF | 3.00 | 384.00 | 11.00 | 1,408.00 | 11.70 | 1,497.60 | 3.00 | 384.00 | | 0015 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 156 | LNFT | 125.00 | 19,500.00 | 160.00 | 24,960.00 | 88.00 | 13,728.00 | 139.00 | 21,684.00 | | 0016 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 99 | LNFT | 125.00 | 12,375.00 | 180.00 | 17,820.00 | 100.00 | 9,900.00 | 146.00 | 14,454.00 | | 0017 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 183 | LNFT | 1.00 | 183.00 | 1.00 | 183.00 | 20.00 | 3,660.00 | 12.50 | 2,287.50 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 5,000.00 | 10,000.00 | 8,000.00 | 16,000.00 | 7,000.00 | 14,000.00 | 7,410.00 | 14,820.00 | | 0019 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 4,465.00 | 4,465.00 | | 0020 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 10,755.00 | 10,755.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 34.00 | 1,275.00 | 34.00 | 1,275.00 | 27.50 | 1,031.25 | 39.00 | 1,462.50 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 118.00 | 11,800.00 | 118.00 | 11,800.00 | 100.00 | 10,000.00 | 135.00 | 13,500.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,450.00 | 13,800.00 | 3,450.00 | 13,800.00 | 3,575.00 | 14,300.00 | 3,950.00 | 15,800.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 600 | SQYD | 5.00 | 3,000.00 | 2.00 | 1,200.00 | 5.50 | 3,300.00 | 4.25 | 2,550.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,000.00 | 23,000.00 | 35,000.00 | 35,000.00 | 32,000.00 | 32,000.00 | 24,000.00 | 24,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 7,500.00 | 3,750.00 | 5,500.00 | 2,750.00 | 6,100.00 | 3,050.00 | 1,900.00 | 950.00 | | 0028 | 717-01-00100 | Seeding | 10 | LB | 25.00 | 250.00 | 14.00 | 140.00 | 15.50 | 155.00 | 66.50 | 665.00 | | 0029 | 718-01-00100 | Fertilizer | 225 | LB | 2.00 | 450.00 | 1.00 | 225.00 | 1.10 | 247.50 | 2.00 | 450.00 | | 0030 | 726-01-00100 | Bedding Material | 24.8 | CUYD | 170.00 | 4,216.00 | 170.00 | 4,216.00 | 185.00 | 4,588.00 | 245.00 | 6,076.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 158,660.00 | 158,660.00 | 160,000.00 | 160,000.00 | 160,000.00 | 160,000.00 | 170,000.00 | 170,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 110.00 | 440.00 | 114.50 | 458.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 25.00 | 325.00 | 25.00 | 325.00 | 27.50 | 357.50 | 29.00 | 377.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.285 | MILE | 8,600.00 | 2,451.00 | 8,500.00 | 2,422.50 | 12,000.00 | 3,420.00 | 9,735.00 | 2,774.48 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.095 | MILE | 7,900.00 | 750.50 | 7,500.00 | 712.50 | 8,700.00 | 826.50 | 8,590.00 | 816.05 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | 27,500.00 | 27,500.00 | 18,500.00 | 18,500.00 | | 0037 | 804-01-00300 | Precast Concrete Piles (16") | 2,700 | LNFT | 135.00 | 364,500.00 | 175.00 | 472,500.00 | 148.00 | 399,600.00 | 175.00 | 472,500.00 | | 0038 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | | 0039 | 804-18-00100 | Vibration Monitoring | 5 | DAY | 542.00 | 2,710.00 | 1,600.00 | 8,000.00 | 2,500.00 | 12,500.00 | 1,260.00 | 6,300.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,195 | SQFT | 3.00 | 3,585.00 | 1.00 | 1,195.00 | 4.00 | 4,780.00 | 2.25 | 2,688.75 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,195 | SQFT | 4.00 | 4,780.00 | 3.00 | 3,585.00 | 4.00 | 4,780.00 | 3.25 | 3,883.75 | | 0043 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 480 | SQFT | 100.00 | 48,000.00 | 100.00 | 48,000.00 | 90.00 | 43,200.00 | 100.00 | 48,000.00 | | 0044 | 805-12-00400 | Bridge Superstructure and Substructure (24' Roadway, 45 Degree Crossing) | 2,400 | SQFT | 206.00 | 494,400.00 | 140.00 | 336,000.00 | 225.00 | 540,000.00 | 205.00 | 492,000.00 | | 0045 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 600 | SQYD | 84.00 | 50,400.00 | 130.00 | 78,000.00 | 122.00 | 73,200.00 | 61.50 | 36,900.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,586,019.30 | | 1,665,886.50 | | 1,675,819.35 | | 1,701,869.63 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Coastal Contractors, LLC | - 6 - Guinn Construction, LLC | - 7 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 110,000.00 | 110,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 872 | SQYD | 15.00 | 13,080.00 | 5.00 | 4,360.00 | 11.00 | 9,592.00 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 872 | SQYD | 15.00 | 13,080.00 | 10.00 | 8,720.00 | 11.00 | 9,592.00 | | 0005 | 202-02-04501 | Removal of Bridge STA. 100+00; 22' X 38' PRECAST CONC. BRIDGE W/ TIMBER SUBSTRUCTURE & METAL GUARD RAILS | 836 | LUMP | 90,000.00 | 90,000.00 | 15,000.00 | 15,000.00 | 67,000.00 | 67,000.00 | | 0006 | 203-02-00100 | Drainage Excavation | 500 | CUYD | 52.00 | 26,000.00 | 25.00 | 12,500.00 | 26.00 | 13,000.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 33,000.00 | 33,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 16 | EACH | 37.00 | 592.00 | 100.00 | 1,600.00 | 30.00 | 480.00 | | 0009 | 204-03-00100 | Temporary Slope Drains | 170 | LNFT | 15.00 | 2,550.00 | 10.00 | 1,700.00 | 75.00 | 12,750.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 915 | LNFT | 3.30 | 3,019.50 | 3.00 | 2,745.00 | 3.00 | 2,745.00 | | 0011 | 302-02-08530 | Class II Base Course (8-1/2" Thick) (Asphalt Concrete Base on Embankment Layer) | 994.1 | SQYD | 95.00 | 94,439.50 | 125.00 | 124,262.50 | 55.00 | 54,675.50 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 500.00 | 1,500.00 | 500.00 | 1,500.00 | 1,000.00 | 3,000.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 187.4 | TON | 200.00 | 37,480.00 | 350.00 | 65,590.00 | 375.00 | 70,275.00 | | 0014 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 128 | INLF | 1.25 | 160.00 | 25.00 | 3,200.00 | 15.00 | 1,920.00 | | 0015 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 156 | LNFT | 135.00 | 21,060.00 | 125.00 | 19,500.00 | 158.00 | 24,648.00 | | 0016 | 701-03-02022 | Storm Drain Pipe (Outfall) (18" RPVCP or 24" CMP) | 99 | LNFT | 135.00 | 13,365.00 | 125.00 | 12,375.00 | 158.00 | 15,642.00 | | 0017 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 183 | LNFT | 15.00 | 2,745.00 | 10.00 | 1,830.00 | 2.00 | 366.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 5,900.00 | 11,800.00 | 5,500.00 | 11,000.00 | 6,000.00 | 12,000.00 | | 0019 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 5,300.00 | 5,300.00 | 3,500.00 | 3,500.00 | 6,000.00 | 6,000.00 | | 0020 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 8,600.00 | 8,600.00 | 6,000.00 | 6,000.00 | 7,000.00 | 7,000.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 37.5 | LNFT | 30.00 | 1,125.00 | 50.00 | 1,875.00 | 26.00 | 975.00 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 150.00 | 15,000.00 | 91.00 | 9,100.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,500.00 | 14,000.00 | 5,000.00 | 20,000.00 | 3,300.00 | 13,200.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 600 | SQYD | 6.00 | 3,600.00 | 5.00 | 3,000.00 | 7.00 | 4,200.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 65,000.00 | 65,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 5,750.00 | 2,875.00 | 8,000.00 | 4,000.00 | 5,500.00 | 2,750.00 | | 0028 | 717-01-00100 | Seeding | 10 | LB | 15.00 | 150.00 | 50.00 | 500.00 | 14.00 | 140.00 | | 0029 | 718-01-00100 | Fertilizer | 225 | LB | 1.00 | 225.00 | 2.00 | 450.00 | 1.00 | 225.00 | | 0030 | 726-01-00100 | Bedding Material | 24.8 | CUYD | 195.00 | 4,836.00 | 250.00 | 6,200.00 | 180.00 | 4,464.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 179,000.00 | 179,000.00 | 160,000.00 | 160,000.00 | 168,000.00 | 168,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 200.00 | 800.00 | 110.00 | 440.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 30.00 | 390.00 | 50.00 | 650.00 | 26.00 | 338.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.285 | MILE | 9,000.00 | 2,565.00 | 18,000.00 | 5,130.00 | 8,500.00 | 2,422.50 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.095 | MILE | 7,500.00 | 712.50 | 20,000.00 | 1,900.00 | 7,200.00 | 684.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0037 | 804-01-00300 | Precast Concrete Piles (16") | 2,700 | LNFT | 165.00 | 445,500.00 | 150.00 | 405,000.00 | 140.00 | 378,000.00 | | 0038 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | 50,000.00 | 50,000.00 | | 0039 | 804-18-00100 | Vibration Monitoring | 5 | DAY | 1,100.00 | 5,500.00 | 2,500.00 | 12,500.00 | 1,000.00 | 5,000.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,195 | SQFT | 2.50 | 2,987.50 | 3.00 | 3,585.00 | 3.00 | 3,585.00 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,195 | SQFT | 3.50 | 4,182.50 | 3.00 | 3,585.00 | 4.00 | 4,780.00 | | 0043 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 480 | SQFT | 100.00 | 48,000.00 | 115.00 | 55,200.00 | 140.00 | 67,200.00 | | 0044 | 805-12-00400 | Bridge Superstructure and Substructure (24' Roadway, 45 Degree Crossing) | 2,400 | SQFT | 215.00 | 516,000.00 | 260.00 | 624,000.00 | 200.00 | 480,000.00 | | 0045 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 600 | SQYD | 117.00 | 70,200.00 | 125.00 | 75,000.00 | 118.00 | 70,800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,799,559.50 | | 1,821,257.50 | | 1,846,989.00 |
|