Proposal:H.013137.6
Parish:Ouachita
Description:HARMON JOHNSON RD BR OVER DRN TO PR BYU
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERT, AND RELATED WORK.
Estimated Construction Cost:$1,010,313.50
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $779,123.32 |
| 2 | 49239 | WL Bass Construction Inc. | $831,661.40 |
| 3 | 15099 | Amethyst Construction, Inc. | $948,686.80 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,082,612.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - WL Bass Construction Inc. | - 3 - Amethyst Construction, Inc. | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 45,546.00 | 45,546.00 | 52,000.00 | 52,000.00 | 35,000.00 | 35,000.00 | 18,000.00 | 18,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 22,659.00 | 22,659.00 | 1,200.00 | 1,200.00 | 28,000.00 | 28,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 318.3 | SQYD | 10.35 | 3,294.41 | 8.00 | 2,546.40 | 18.00 | 5,729.40 | 45.00 | 14,323.50 | | 0004 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 318.3 | SQYD | 10.35 | 3,294.41 | 15.00 | 4,774.50 | 18.00 | 5,729.40 | 45.00 | 14,323.50 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (84" CMP) | 140 | LNFT | 177.00 | 24,780.00 | 130.00 | 18,200.00 | 55.00 | 7,700.00 | 65.00 | 9,100.00 | | 0006 | 203-02-00100 | Drainage Excavation | 33 | CUYD | 23.00 | 759.00 | 20.00 | 660.00 | 75.00 | 2,475.00 | 15.00 | 495.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,140.00 | 10,140.00 | 15,000.00 | 15,000.00 | 125,000.00 | 125,000.00 | 110,000.00 | 110,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 244 | LNFT | 12.00 | 2,928.00 | 12.00 | 2,928.00 | 15.00 | 3,660.00 | 5.00 | 1,220.00 | | 0009 | 302-01-00300 | Class II Base Course (Crushed Stone) | 85.9 | CUYD | 307.00 | 26,371.30 | 245.00 | 21,045.50 | 215.00 | 18,468.50 | 160.00 | 13,744.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 526.00 | 2,104.00 | 1,500.00 | 6,000.00 | 1,000.00 | 4,000.00 | 1,500.00 | 6,000.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 21 | CUYD | 300.00 | 6,300.00 | 100.00 | 2,100.00 | 195.00 | 4,095.00 | 450.00 | 9,450.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 68.5 | TON | 415.00 | 28,427.50 | 500.00 | 34,250.00 | 425.00 | 29,112.50 | 750.00 | 51,375.00 | | 0013 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 355 | INLF | 4.34 | 1,540.70 | 1.00 | 355.00 | 3.00 | 1,065.00 | 1.85 | 656.75 | | 0014 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 55 | LNFT | 109.00 | 5,995.00 | 650.00 | 35,750.00 | 1.00 | 55.00 | 150.00 | 8,250.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,500.00 | 6,500.00 | 35,000.00 | 35,000.00 | 55,000.00 | 55,000.00 | 68,000.00 | 68,000.00 | | 0016 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 17,700.00 | 1,770.00 | 20,000.00 | 2,000.00 | 25,000.00 | 2,500.00 | 20,000.00 | 2,000.00 | | 0017 | 717-01-00100 | Seeding | 3 | LB | 89.00 | 267.00 | 100.00 | 300.00 | 125.00 | 375.00 | 100.00 | 300.00 | | 0018 | 718-01-00100 | Fertilizer | 70 | LB | 6.00 | 420.00 | 5.00 | 350.00 | 8.00 | 560.00 | 15.00 | 1,050.00 | | 0019 | 726-01-00100 | Bedding Material | 95.8 | CUYD | 155.00 | 14,849.00 | 200.00 | 19,160.00 | 195.00 | 18,681.00 | 175.00 | 16,765.00 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 95,000.00 | 95,000.00 | 83,150.00 | 83,150.00 | 90,000.00 | 90,000.00 | 105,000.00 | 105,000.00 | | 0021 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 118.00 | 472.00 | 150.00 | 600.00 | 850.00 | 3,400.00 | 145.00 | 580.00 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7 | EACH | 30.00 | 210.00 | 25.00 | 175.00 | 30.00 | 210.00 | 25.00 | 175.00 | | 0023 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 580 | LNFT | 5.00 | 2,900.00 | 4.00 | 2,320.00 | 6.00 | 3,480.00 | 4.00 | 2,320.00 | | 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,650.00 | 7,650.00 | 40,000.00 | 40,000.00 | 8,500.00 | 8,500.00 | 35,000.00 | 35,000.00 | | 0025 | 805-15-01900 | Reinforced Concrete Box Culverts (Precast) (9' x 7') | 165 | LNFT | 1,967.00 | 324,555.00 | 1,800.00 | 297,000.00 | 1,900.00 | 313,500.00 | 2,700.00 | 445,500.00 | | 0026 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Quantity of Steel = 1,364 Pounds & Quantity of Concrete = 18.89 Cu. Yard) | 2 | EACH | 69,000.00 | 138,000.00 | 77,000.00 | 154,000.00 | 90,000.00 | 180,000.00 | 65,000.00 | 130,000.00 | | 0027 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 797 | SQFT | 3.00 | 2,391.00 | 1.00 | 797.00 | 3.00 | 2,391.00 | 5.00 | 3,985.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 779,123.32 | | 831,661.40 | | 948,686.80 | | 1,082,612.75 |
|