Proposal:H.012573.6
Parish:Livingston
Routes:LA 1026
Description:LA 1026: LA 16 - FORREST DELATTE RD.
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,619,391.50
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,684,148.73 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,687,780.87 |
| 3 | 12031 | R.J. Daigle & Sons Contractors, Inc | $2,192,424.06 |
| 4 | 73475 | Madden Gulf Coast, LLC | $2,487,280.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | - 3 - R.J. Daigle & Sons Contractors, Inc | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 6,500.00 | 6,500.00 | 3,715.00 | 3,715.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,340 | LNFT | 11.00 | 14,740.00 | 7.00 | 9,380.00 | 12.50 | 16,750.00 | 6.50 | 8,710.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 17 | EACH | 16.00 | 272.00 | 26.00 | 442.00 | 18.75 | 318.75 | 25.00 | 425.00 | | 0004 | 203-03-00100 | Embankment | 120.6 | CUYD | 100.00 | 12,060.00 | 52.00 | 6,271.20 | 62.50 | 7,537.50 | 50.00 | 6,030.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 506 | CUYD | 50.00 | 25,300.00 | 43.00 | 21,758.00 | 140.00 | 70,840.00 | 145.00 | 73,370.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 845 | LNFT | 2.00 | 1,690.00 | 4.00 | 3,380.00 | 4.00 | 3,380.00 | 3.00 | 2,535.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 4,452.7 | TON | 105.00 | 467,533.50 | 127.00 | 565,492.90 | 128.00 | 569,945.60 | 155.00 | 690,168.50 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 806.1 | TON | 195.00 | 157,189.50 | 171.00 | 137,843.10 | 200.00 | 161,220.00 | 320.00 | 257,952.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 44,915 | SQYD | 2.75 | 123,516.25 | 2.25 | 101,058.75 | 3.10 | 139,236.50 | 5.00 | 224,575.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,381 | CUYD | 0.00 | 0.00 | 0.01 | -23.81 | 0.01 | -23.81 | 0.01 | -23.81 | | 0011 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,228 | SQYD | 150.00 | 184,200.00 | 136.00 | 167,008.00 | 132.00 | 162,096.00 | 177.00 | 217,356.00 | | 0012 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 218 | LNFT | 8.00 | 1,744.00 | 9.50 | 2,071.00 | 12.50 | 2,725.00 | 10.00 | 2,180.00 | | 0013 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 430.35 | LNFT | 8.00 | 3,442.80 | 9.50 | 4,088.33 | 12.50 | 5,379.38 | 10.00 | 4,303.50 | | 0014 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 3,726 | LNFT | 0.10 | 372.60 | 0.75 | 2,794.50 | 1.40 | 5,216.40 | 5.00 | 18,630.00 | | 0015 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 4 | LNFT | 1,000.00 | 4,000.00 | 1,450.00 | 5,800.00 | 687.50 | 2,750.00 | 550.00 | 2,200.00 | | 0016 | 701-05-02180 | Side Drain Pipe (Erosion) (60" CMP) | 285 | LNFT | 400.00 | 114,000.00 | 355.00 | 101,175.00 | 500.00 | 142,500.00 | 400.00 | 114,000.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,400.00 | 2,400.00 | 3,000.00 | 3,000.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 400 | LNFT | 52.00 | 20,800.00 | 45.00 | 18,000.00 | 62.50 | 25,000.00 | 44.00 | 17,600.00 | | 0019 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 32.00 | 1,001.60 | 34.00 | 1,064.20 | 37.50 | 1,173.75 | 33.75 | 1,056.38 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 525 | LNFT | 32.00 | 16,800.00 | 35.00 | 18,375.00 | 37.50 | 19,687.50 | 33.75 | 17,718.75 | | 0021 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 105.00 | 661.50 | 200.00 | 1,260.00 | 125.00 | 787.50 | 195.00 | 1,228.50 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 105.00 | 31,500.00 | 120.00 | 36,000.00 | 125.00 | 37,500.00 | 118.00 | 35,400.00 | | 0023 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 3,800.00 | 3,800.00 | 4,200.00 | 4,200.00 | 4,375.00 | 4,375.00 | 4,000.00 | 4,000.00 | | 0024 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 3,800.00 | 26,600.00 | 3,500.00 | 24,500.00 | 4,375.00 | 30,625.00 | 3,400.00 | 23,800.00 | | 0025 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,800.00 | 11,400.00 | 3,200.00 | 9,600.00 | 4,375.00 | 13,125.00 | 3,100.00 | 9,300.00 | | 0026 | 707-04-00100 | Asphalt Concrete Curb | 162 | LNFT | 60.00 | 9,720.00 | 76.00 | 12,312.00 | 78.76 | 12,759.12 | 75.00 | 12,150.00 | | 0027 | 710-01-00100 | Flowable Fill | 120 | CUYD | 100.00 | 12,000.00 | 225.00 | 27,000.00 | 237.50 | 28,500.00 | 250.00 | 30,000.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 115,000.00 | 115,000.00 | 118,000.00 | 118,000.00 | 310,000.00 | 310,000.00 | 300,000.00 | 300,000.00 | | 0029 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 910 | LNFT | 0.20 | 182.00 | 0.50 | 455.00 | 0.21 | 191.10 | 0.17 | 154.70 | | 0030 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 630 | LNFT | 0.30 | 189.00 | 1.00 | 630.00 | 0.34 | 214.20 | 0.27 | 170.10 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.874 | MILE | 300.00 | 1,162.20 | 1.00 | 3.87 | 887.33 | 3,437.52 | 450.00 | 1,743.30 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.506 | MILE | 600.00 | 1,503.60 | 800.00 | 2,004.80 | 751.20 | 1,882.51 | 600.00 | 1,503.60 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 17.72 | MILE | 1,000.00 | 17,720.00 | 1,000.00 | 17,720.00 | 1,250.00 | 22,150.00 | 1,000.00 | 17,720.00 | | 0034 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 27.00 | 108.00 | 28.00 | 112.00 | 33.75 | 135.00 | 27.00 | 108.00 | | 0035 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 4 | EACH | 27.00 | 108.00 | 28.00 | 112.00 | 33.75 | 135.00 | 27.00 | 108.00 | | 0036 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 4 | EACH | 27.00 | 108.00 | 28.00 | 112.00 | 33.75 | 135.00 | 27.00 | 108.00 | | 0037 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 4,000.00 | 8,000.00 | 6,700.00 | 13,400.00 | 4,875.00 | 9,750.00 | 3,500.00 | 7,000.00 | | 0038 | 724-01-00100 | Rumble Strips (Centerline) | 2.486 | MILE | 325.00 | 807.95 | 305.00 | 758.23 | 375.60 | 933.74 | 1,000.00 | 2,486.00 | | 0039 | 726-01-00100 | Bedding Material | 1 | CUYD | 500.00 | 500.00 | 305.00 | 305.00 | 250.00 | 250.00 | 200.00 | 200.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 165,000.00 | 165,000.00 | 121,000.00 | 121,000.00 | 232,500.00 | 232,500.00 | 240,000.00 | 240,000.00 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 5 | EACH | 105.00 | 525.00 | 77.00 | 385.00 | 125.00 | 625.00 | 90.00 | 450.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 155.00 | 1,860.00 | 94.00 | 1,128.00 | 187.50 | 2,250.00 | 90.00 | 1,080.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 9,700 | EACH | 4.20 | 40,740.00 | 4.50 | 43,650.00 | 5.00 | 48,500.00 | 4.00 | 38,800.00 | | 0044 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 298 | LNFT | 5.25 | 1,564.50 | 5.00 | 1,490.00 | 6.25 | 1,862.50 | 5.00 | 1,490.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 156 | LNFT | 16.00 | 2,496.00 | 15.50 | 2,418.00 | 18.75 | 2,925.00 | 15.00 | 2,340.00 | | 0046 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 185 | LNFT | 5.25 | 971.25 | 5.00 | 925.00 | 6.25 | 1,156.25 | 5.00 | 925.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.86 | MILE | 5,000.00 | 44,300.00 | 5,000.00 | 44,300.00 | 6,000.00 | 53,160.00 | 4,800.00 | 42,528.00 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.253 | MILE | 1,575.00 | 1,973.48 | 1,600.00 | 2,004.80 | 1,885.47 | 2,362.49 | 1,500.00 | 1,879.50 | | 0049 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.168 | MILE | 12,000.00 | 2,016.00 | 12,000.00 | 2,016.00 | 15,178.57 | 2,550.00 | 12,000.00 | 2,016.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 370.00 | 740.00 | 350.00 | 700.00 | 437.50 | 875.00 | 350.00 | 700.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 370.00 | 740.00 | 350.00 | 700.00 | 437.50 | 875.00 | 350.00 | 700.00 | | 0052 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 700.00 | 1,400.00 | 650.00 | 1,300.00 | 812.50 | 1,625.00 | 350.00 | 700.00 | | 0053 | 735-01-00100 | Mailboxes | 54 | EACH | 55.00 | 2,970.00 | 31.50 | 1,701.00 | 62.50 | 3,375.00 | 30.00 | 1,620.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 54 | EACH | 105.00 | 5,670.00 | 260.00 | 14,040.00 | 125.00 | 6,750.00 | 255.00 | 13,770.00 | | 0055 | 739-01-00100 | Hydro-Seeding | 0.003 | ACRE | 350,000.00 | 1,050.00 | 520,000.00 | 1,560.00 | 649,853.33 | 1,949.56 | 5,000.00 | 15.00 | | 0056 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 4,500.00 | 4,500.00 | 11,250.00 | 11,250.00 | 25,800.00 | 25,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,684,148.73 | | 1,687,780.87 | | 2,192,424.06 | | 2,487,280.02 |
|