Proposal:H.012033.6
Parish:Ouachita
Routes:LA 594
Description:LA 594: CANEY CR BR
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TREATED TIMBER TRESTLE BRIDGE, DRAINAGE STRUCTURES, GRADING, CLASS II BASE COURSE, LIME TREATMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$1,942,452.50
| Rank | License | Bidder | Construction Bid |
| 1 | 39613 | Baker Pile Driving and Site Work, LLC | $1,594,467.45 |
| 2 | 14788 | Louisiana Bridge, Inc. | $1,662,268.90 |
| 3 | 49239 | WL Bass Construction Inc. | $1,885,683.70 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,959,867.85 |
| 5 | 56994 | Matt L. Guinn Construction, LLC | $1,981,007.90 |
| 6 | 00044 | Guinn Construction, LLC | $2,058,306.60 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $2,185,049.00 |
| 8 | 12312 | Gilchrist Construction Company, LLC | $2,524,435.32 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Baker Pile Driving and Site Work, LLC | - 2 - Louisiana Bridge, Inc. | - 3 - WL Bass Construction Inc. | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.78 | LUMP | 18,981.14 | 18,981.14 | 35,000.00 | 35,000.00 | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,037.90 | 4,037.90 | 4,000.00 | 4,000.00 | 3,830.00 | 3,830.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 186 | SQYD | 12.90 | 2,399.40 | 12.00 | 2,232.00 | 6.00 | 1,116.00 | 40.00 | 7,440.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,148.7 | SQYD | 12.00 | 13,784.40 | 12.00 | 13,784.40 | 20.00 | 22,974.00 | 22.00 | 25,271.40 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 210+19, 59.0' X 21.2', TREATED TIMBER TRESTLES BRIDGE; RECALL NO. 025280) | 1,251 | LUMP | 28,424.21 | 28,424.21 | 20,000.00 | 20,000.00 | 73,000.00 | 73,000.00 | 55,000.00 | 55,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 424 | LNFT | 7.10 | 3,010.40 | 10.00 | 4,240.00 | 7.00 | 2,968.00 | 17.00 | 7,208.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12" Metal Pipe Culvert | 32 | LNFT | 29.29 | 937.28 | 35.00 | 1,120.00 | 20.00 | 640.00 | 185.00 | 5,920.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 15"-30" RCP | 62 | LNFT | 7.74 | 479.88 | 30.00 | 1,860.00 | 25.00 | 1,550.00 | 95.00 | 5,890.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 16" x 26" CMPA | 30 | LNFT | 16.00 | 480.00 | 30.00 | 900.00 | 30.00 | 900.00 | 195.00 | 5,850.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 644.94 | 2,579.76 | 260.00 | 1,040.00 | 150.00 | 600.00 | 1,250.00 | 5,000.00 | | 0011 | 203-01-00100 | General Excavation | 811 | CUYD | 68.47 | 55,529.17 | 18.00 | 14,598.00 | 16.00 | 12,976.00 | 20.00 | 16,220.00 | | 0012 | 203-02-00100 | Drainage Excavation | 856 | CUYD | 36.00 | 30,816.00 | 18.00 | 15,408.00 | 20.00 | 17,120.00 | 20.00 | 17,120.00 | | 0013 | 203-03-00100 | Embankment | 882 | CUYD | 79.87 | 70,445.34 | 21.00 | 18,522.00 | 35.00 | 30,870.00 | 25.00 | 22,050.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 219.46 | 1,975.14 | 300.00 | 2,700.00 | 200.00 | 1,800.00 | 225.00 | 2,025.00 | | 0015 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 3 | EACH | 857.13 | 2,571.39 | 1,200.00 | 3,600.00 | 450.00 | 1,350.00 | 2,500.00 | 7,500.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 711 | LNFT | 5.39 | 3,832.29 | 4.50 | 3,199.50 | 5.50 | 3,910.50 | 3.00 | 2,133.00 | | 0017 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 1,353.6 | SQYD | 59.00 | 79,862.40 | 67.00 | 90,691.20 | 55.00 | 74,448.00 | 75.00 | 101,520.00 | | 0018 | 302-03-00100 | Base Drain Outlet | 2 | EACH | 941.41 | 1,882.82 | 1,200.00 | 2,400.00 | 1,500.00 | 3,000.00 | 2,600.00 | 5,200.00 | | 0019 | 304-01-00100 | Lime | 19.19 | TON | 444.00 | 8,520.36 | 500.00 | 9,595.00 | 480.00 | 9,211.20 | 545.00 | 10,458.55 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 1,353 | SQYD | 13.25 | 17,927.25 | 13.00 | 17,589.00 | 6.00 | 8,118.00 | 8.00 | 10,824.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 279.7 | TON | 371.00 | 103,768.70 | 300.00 | 83,910.00 | 300.00 | 83,910.00 | 180.00 | 50,346.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 28.8 | TON | 453.00 | 13,046.40 | 400.00 | 11,520.00 | 475.00 | 13,680.00 | 585.00 | 16,848.00 | | 0023 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 76 | SQYD | 318.88 | 24,234.88 | 270.00 | 20,520.00 | 350.00 | 26,600.00 | 215.00 | 16,340.00 | | 0024 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 136 | INLF | 5.28 | 718.08 | 5.00 | 680.00 | 1.00 | 136.00 | 12.50 | 1,700.00 | | 0025 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 132 | LNFT | 12.13 | 1,601.16 | 6.00 | 792.00 | 5.00 | 660.00 | 10.00 | 1,320.00 | | 0026 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 220 | LNFT | 13.65 | 3,003.00 | 8.00 | 1,760.00 | 4.00 | 880.00 | 5.00 | 1,100.00 | | 0027 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 108 | LNFT | 44.67 | 4,824.36 | 110.00 | 11,880.00 | 110.00 | 11,880.00 | 95.00 | 10,260.00 | | 0028 | 701-05-02041 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CMP) | 72 | LNFT | 56.55 | 4,071.60 | 118.00 | 8,496.00 | 100.00 | 7,200.00 | 120.00 | 8,640.00 | | 0029 | 701-05-02081 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CMP) | 180 | LNFT | 80.33 | 14,459.40 | 145.00 | 26,100.00 | 110.00 | 19,800.00 | 140.00 | 25,200.00 | | 0030 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 180 | LNFT | 54.49 | 9,808.20 | 5.00 | 900.00 | 245.00 | 44,100.00 | 20.00 | 3,600.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,234.33 | 4,468.66 | 3,200.00 | 6,400.00 | 2,200.00 | 4,400.00 | 3,500.00 | 7,000.00 | | 0032 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 6,696.53 | 6,696.53 | 5,700.00 | 5,700.00 | 2,200.00 | 2,200.00 | 10,000.00 | 10,000.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 43.8 | LNFT | 33.00 | 1,445.40 | 41.00 | 1,795.80 | 30.00 | 1,314.00 | 35.50 | 1,554.90 | | 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 90.77 | 9,077.00 | 155.00 | 15,500.00 | 85.00 | 8,500.00 | 135.00 | 13,500.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,777.15 | 3,777.15 | 4,800.00 | 4,800.00 | 3,500.00 | 3,500.00 | 4,150.00 | 4,150.00 | | 0036 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,732.38 | 11,197.14 | 4,400.00 | 13,200.00 | 3,500.00 | 10,500.00 | 3,850.00 | 11,550.00 | | 0037 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 697.39 | 5,579.12 | 700.00 | 5,600.00 | 250.00 | 2,000.00 | 650.00 | 5,200.00 | | 0038 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 220.39 | 1,763.12 | 300.00 | 2,400.00 | 200.00 | 1,600.00 | 200.00 | 1,600.00 | | 0039 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,221 | SQYD | 89.04 | 108,717.84 | 100.00 | 122,100.00 | 90.00 | 109,890.00 | 110.00 | 134,310.00 | | 0040 | 711-04-00100 | Geotextile Fabric | 1,221 | SQYD | 3.08 | 3,760.68 | 5.00 | 6,105.00 | 4.00 | 4,884.00 | 1.00 | 1,221.00 | | 0041 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,857.15 | 22,857.15 | 22,500.00 | 22,500.00 | 55,000.00 | 55,000.00 | 115,000.00 | 115,000.00 | | 0042 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 606 | SQYD | 3.40 | 2,060.40 | 7.00 | 4,242.00 | 3.50 | 2,121.00 | 2.00 | 1,212.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 117,498.87 | 117,498.87 | 146,000.00 | 146,000.00 | 188,500.00 | 188,500.00 | 190,000.00 | 190,000.00 | | 0044 | 729-01-00100 | Sign (Type A) | 9.7 | SQFT | 18.00 | 174.60 | 60.00 | 582.00 | 10.00 | 97.00 | 50.00 | 485.00 | | 0045 | 729-01-00200 | Mounting of Sign (Type A) | 3 | EACH | 181.38 | 544.14 | 60.00 | 180.00 | 150.00 | 450.00 | 50.00 | 150.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 149.29 | 597.16 | 155.00 | 620.00 | 125.00 | 500.00 | 135.00 | 540.00 | | 0047 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 199.65 | 199.65 | 200.00 | 200.00 | 25.00 | 25.00 | 175.00 | 175.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15 | EACH | 30.98 | 464.70 | 29.00 | 435.00 | 25.00 | 375.00 | 125.00 | 1,875.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.436 | MILE | 7,050.00 | 3,073.80 | 7,400.00 | 3,226.40 | 6,500.00 | 2,834.00 | 8,500.00 | 3,706.00 | | 0050 | 735-01-00100 | Mailboxes | 2 | EACH | 81.28 | 162.56 | 250.00 | 500.00 | 20.00 | 40.00 | 28.00 | 56.00 | | 0051 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 219.08 | 438.16 | 400.00 | 800.00 | 150.00 | 300.00 | 300.00 | 600.00 | | 0052 | 739-01-00100 | Hydro-Seeding | 0.78 | ACRE | 5,386.00 | 4,201.08 | 7,500.00 | 5,850.00 | 5,000.00 | 3,900.00 | 4,000.00 | 3,120.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,669.57 | 10,669.57 | 17,000.00 | 17,000.00 | 50,000.00 | 50,000.00 | 65,000.00 | 65,000.00 | | 0054 | 804-01-00400 | Precast Concrete Piles (18") | 980 | LNFT | 117.07 | 114,728.60 | 165.00 | 161,700.00 | 222.00 | 217,560.00 | 217.00 | 212,660.00 | | 0058 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 15,861.15 | 15,861.15 | 7,000.00 | 7,000.00 | 30,000.00 | 30,000.00 | 14,900.00 | 14,900.00 | | 0059 | 804-18-00100 | Vibration Monitoring | 5 | DAY | 2,187.15 | 10,935.75 | 1,500.00 | 7,500.00 | 250.00 | 1,250.00 | 1,100.00 | 5,500.00 | | 0060 | 805-01-00100 | Class A1 Concrete (Slab Span) | 120.52 | CUYD | 1,330.00 | 160,291.60 | 1,650.00 | 198,858.00 | 350.00 | 42,182.00 | 1,500.00 | 180,780.00 | | 0061 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 41.36 | CUYD | 2,159.00 | 89,296.24 | 1,950.00 | 80,652.00 | 350.00 | 14,476.00 | 2,400.00 | 99,264.00 | | 0062 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 5.06 | 5,636.84 | 5.00 | 5,570.00 | 1.00 | 1,114.00 | 3.00 | 3,342.00 | | 0063 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 5.31 | 5,915.34 | 5.00 | 5,570.00 | 1.00 | 1,114.00 | 3.50 | 3,899.00 | | 0064 | 806-01-00100 | Deformed Reinforcing Steel | 29,136 | LB | 1.56 | 45,452.16 | 1.85 | 53,901.60 | 4.50 | 131,112.00 | 1.50 | 43,704.00 | | 0065 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 240.18 | 38,428.80 | 230.00 | 36,800.00 | 300.00 | 48,000.00 | 215.00 | 34,400.00 | | 0066 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 101.49 | 243,576.00 | 108.00 | 259,200.00 | 155.00 | 372,000.00 | 100.00 | 240,000.00 | | 0067 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 96 | SFIN | 125.33 | 12,031.68 | 289.00 | 27,744.00 | 133.00 | 12,768.00 | 205.00 | 19,680.00 | | 0068 | 815-03-00300 | Joint Seal (Poured) | 150 | LNFT | 32.51 | 4,876.50 | 20.00 | 3,000.00 | 13.00 | 1,950.00 | 45.00 | 6,750.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,594,467.45 | | 1,662,268.90 | | 1,885,683.70 | | 1,959,867.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Matt L. Guinn Construction, LLC | - 6 - Guinn Construction, LLC | - 7 - JB JAMES CONSTRUCTION LLC | - 8 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.78 | LUMP | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | 260,000.00 | 260,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 186 | SQYD | 22.00 | 4,092.00 | 10.00 | 1,860.00 | 23.00 | 4,278.00 | 40.43 | 7,519.98 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,148.7 | SQYD | 18.00 | 20,676.60 | 15.00 | 17,230.50 | 12.00 | 13,784.40 | 21.97 | 25,236.94 | | 0005 | 202-02-04501 | Removal of Bridge (STA. 210+19, 59.0' X 21.2', TREATED TIMBER TRESTLES BRIDGE; RECALL NO. 025280) | 1,251 | LUMP | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 424 | LNFT | 12.00 | 5,088.00 | 20.00 | 8,480.00 | 9.00 | 3,816.00 | 15.00 | 6,360.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12" Metal Pipe Culvert | 32 | LNFT | 25.00 | 800.00 | 50.00 | 1,600.00 | 50.00 | 1,600.00 | 60.00 | 1,920.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 15"-30" RCP | 62 | LNFT | 25.00 | 1,550.00 | 50.00 | 3,100.00 | 50.00 | 3,100.00 | 60.00 | 3,720.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 16" x 26" CMPA | 30 | LNFT | 25.00 | 750.00 | 50.00 | 1,500.00 | 50.00 | 1,500.00 | 60.00 | 1,800.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 45.00 | 180.00 | 500.00 | 2,000.00 | | 0011 | 203-01-00100 | General Excavation | 811 | CUYD | 35.00 | 28,385.00 | 25.00 | 20,275.00 | 32.00 | 25,952.00 | 30.00 | 24,330.00 | | 0012 | 203-02-00100 | Drainage Excavation | 856 | CUYD | 35.00 | 29,960.00 | 25.00 | 21,400.00 | 30.00 | 25,680.00 | 30.00 | 25,680.00 | | 0013 | 203-03-00100 | Embankment | 882 | CUYD | 35.00 | 30,870.00 | 50.00 | 44,100.00 | 80.00 | 70,560.00 | 55.00 | 48,510.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 9 | EACH | 450.00 | 4,050.00 | 500.00 | 4,500.00 | 225.00 | 2,025.00 | 230.00 | 2,070.00 | | 0015 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 3 | EACH | 750.00 | 2,250.00 | 2,000.00 | 6,000.00 | 2,200.00 | 6,600.00 | 2,200.00 | 6,600.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 711 | LNFT | 5.00 | 3,555.00 | 3.00 | 2,133.00 | 7.00 | 4,977.00 | 4.00 | 2,844.00 | | 0017 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 1,353.6 | SQYD | 73.00 | 98,812.80 | 80.00 | 108,288.00 | 55.00 | 74,448.00 | 60.00 | 81,216.00 | | 0018 | 302-03-00100 | Base Drain Outlet | 2 | EACH | 850.00 | 1,700.00 | 2,500.00 | 5,000.00 | 2,000.00 | 4,000.00 | 2,000.00 | 4,000.00 | | 0019 | 304-01-00100 | Lime | 19.19 | TON | 600.00 | 11,514.00 | 1,000.00 | 19,190.00 | 300.00 | 5,757.00 | 410.00 | 7,867.90 | | 0020 | 304-05-00100 | Lime Treatment (Type E) | 1,353 | SQYD | 25.00 | 33,825.00 | 18.00 | 24,354.00 | 10.00 | 13,530.00 | 8.00 | 10,824.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 279.7 | TON | 345.00 | 96,496.50 | 375.00 | 104,887.50 | 300.00 | 83,910.00 | 300.00 | 83,910.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 28.8 | TON | 480.00 | 13,824.00 | 575.00 | 16,560.00 | 475.00 | 13,680.00 | 800.00 | 23,040.00 | | 0023 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 76 | SQYD | 310.00 | 23,560.00 | 400.00 | 30,400.00 | 350.00 | 26,600.00 | 300.00 | 22,800.00 | | 0024 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 136 | INLF | 20.00 | 2,720.00 | 15.00 | 2,040.00 | 1.00 | 136.00 | 20.00 | 2,720.00 | | 0025 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 132 | LNFT | 20.00 | 2,640.00 | 20.00 | 2,640.00 | 25.00 | 3,300.00 | 30.00 | 3,960.00 | | 0026 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 220 | LNFT | 4.00 | 880.00 | 15.00 | 3,300.00 | 18.00 | 3,960.00 | 20.00 | 4,400.00 | | 0027 | 701-05-01042 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CMP) | 108 | LNFT | 120.00 | 12,960.00 | 125.00 | 13,500.00 | 160.00 | 17,280.00 | 200.00 | 21,600.00 | | 0028 | 701-05-02041 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CMP) | 72 | LNFT | 120.00 | 8,640.00 | 125.00 | 9,000.00 | 120.00 | 8,640.00 | 250.00 | 18,000.00 | | 0029 | 701-05-02081 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CMP) | 180 | LNFT | 165.00 | 29,700.00 | 285.00 | 51,300.00 | 220.00 | 39,600.00 | 250.00 | 45,000.00 | | 0030 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 180 | LNFT | 25.00 | 4,500.00 | 10.00 | 1,800.00 | 1.00 | 180.00 | 50.00 | 9,000.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 3,250.00 | 6,500.00 | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | 11,000.00 | 22,000.00 | | 0032 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 8,500.00 | 8,500.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | | 0033 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 43.8 | LNFT | 35.00 | 1,533.00 | 50.00 | 2,190.00 | 30.00 | 1,314.00 | 31.00 | 1,357.80 | | 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 95.00 | 9,500.00 | 150.00 | 15,000.00 | 85.00 | 8,500.00 | 86.00 | 8,600.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | 3,600.00 | 3,600.00 | | 0036 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 4,000.00 | 12,000.00 | 5,500.00 | 16,500.00 | 3,500.00 | 10,500.00 | 3,600.00 | 10,800.00 | | 0037 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 850.00 | 6,800.00 | 1,200.00 | 9,600.00 | 650.00 | 5,200.00 | 700.00 | 5,600.00 | | 0038 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 450.00 | 3,600.00 | 400.00 | 3,200.00 | 200.00 | 1,600.00 | 225.00 | 1,800.00 | | 0039 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,221 | SQYD | 135.00 | 164,835.00 | 115.00 | 140,415.00 | 110.00 | 134,310.00 | 110.00 | 134,310.00 | | 0040 | 711-04-00100 | Geotextile Fabric | 1,221 | SQYD | 5.00 | 6,105.00 | 5.00 | 6,105.00 | 4.00 | 4,884.00 | 6.00 | 7,326.00 | | 0041 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 36,000.00 | 36,000.00 | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | | 0042 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 606 | SQYD | 8.50 | 5,151.00 | 5.00 | 3,030.00 | 2.00 | 1,212.00 | 3.00 | 1,818.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | | 0044 | 729-01-00100 | Sign (Type A) | 9.7 | SQFT | 12.00 | 116.40 | 100.00 | 970.00 | 10.00 | 97.00 | 11.00 | 106.70 | | 0045 | 729-01-00200 | Mounting of Sign (Type A) | 3 | EACH | 350.00 | 1,050.00 | 200.00 | 600.00 | 150.00 | 450.00 | 160.00 | 480.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 135.00 | 540.00 | 200.00 | 800.00 | 125.00 | 500.00 | 130.00 | 520.00 | | 0047 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 30.00 | 30.00 | 500.00 | 500.00 | 25.00 | 25.00 | 27.00 | 27.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15 | EACH | 45.00 | 675.00 | 50.00 | 750.00 | 25.00 | 375.00 | 27.00 | 405.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.436 | MILE | 12,000.00 | 5,232.00 | 15,000.00 | 6,540.00 | 6,600.00 | 2,877.60 | 6,500.00 | 2,834.00 | | 0050 | 735-01-00100 | Mailboxes | 2 | EACH | 75.00 | 150.00 | 200.00 | 400.00 | 50.00 | 100.00 | 30.00 | 60.00 | | 0051 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 155.00 | 310.00 | 200.00 | 400.00 | 150.00 | 300.00 | 300.00 | 600.00 | | 0052 | 739-01-00100 | Hydro-Seeding | 0.78 | ACRE | 7,000.00 | 5,460.00 | 7,500.00 | 5,850.00 | 4,000.00 | 3,120.00 | 4,200.00 | 3,276.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0054 | 804-01-00400 | Precast Concrete Piles (18") | 980 | LNFT | 190.00 | 186,200.00 | 185.00 | 181,300.00 | 210.00 | 205,800.00 | 250.00 | 245,000.00 | | 0058 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 13,000.00 | 13,000.00 | 22,000.00 | 22,000.00 | 68,000.00 | 68,000.00 | 100,000.00 | 100,000.00 | | 0059 | 804-18-00100 | Vibration Monitoring | 5 | DAY | 1,550.00 | 7,750.00 | 2,500.00 | 12,500.00 | 1,600.00 | 8,000.00 | 1,000.00 | 5,000.00 | | 0060 | 805-01-00100 | Class A1 Concrete (Slab Span) | 120.52 | CUYD | 1,850.00 | 222,962.00 | 1,875.00 | 225,975.00 | 1,400.00 | 168,728.00 | 1,900.00 | 228,988.00 | | 0061 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 41.36 | CUYD | 2,900.00 | 119,944.00 | 3,000.00 | 124,080.00 | 2,750.00 | 113,740.00 | 3,500.00 | 144,760.00 | | 0062 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 4.00 | 4,456.00 | 1.00 | 1,114.00 | 3.00 | 3,342.00 | | 0063 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 4.00 | 4,456.00 | 2.50 | 2,785.00 | 3.00 | 3,342.00 | | 0064 | 806-01-00100 | Deformed Reinforcing Steel | 29,136 | LB | 1.85 | 53,901.60 | 1.85 | 53,901.60 | 1.50 | 43,704.00 | 1.50 | 43,704.00 | | 0065 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 210.00 | 33,600.00 | 300.00 | 48,000.00 | 210.00 | 33,600.00 | 300.00 | 48,000.00 | | 0066 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 120.00 | 288,000.00 | 110.00 | 264,000.00 | 90.00 | 216,000.00 | 150.00 | 360,000.00 | | 0067 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 96 | SFIN | 205.00 | 19,680.00 | 200.00 | 19,200.00 | 90.00 | 8,640.00 | 100.00 | 9,600.00 | | 0068 | 815-03-00300 | Joint Seal (Poured) | 150 | LNFT | 20.00 | 3,000.00 | 25.00 | 3,750.00 | 20.00 | 3,000.00 | 35.00 | 5,250.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,981,007.90 | | 2,058,306.60 | | 2,185,049.00 | | 2,524,435.32 |
|