Proposal:H.001674.6
Parish:Claiborne
Routes:LA 146
Description:LA 146 BRIDGES NEAR HOMER
Type Construction:CLEARING AND GRUBBING, REMOVAL OF LIGHTWEIGHT CONCRETE PRECAST SLAB UNITS BRIDGE, REMOVAL OF TREATED TIMBER TRESTLES WITH CONCRETE DECK BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$9,989,261.78
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $8,431,112.30 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $9,055,527.32 |
| 3 | 79463 | Denley Brown Contractors, LLC | $9,589,110.43 |
| 4 | 12312 | Gilchrist Construction Company, LLC | $11,636,175.34 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - Denley Brown Contractors, LLC | - 4 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.42 | LUMP | 170,000.00 | 170,000.00 | 800,000.00 | 800,000.00 | 575,000.00 | 575,000.00 | 700,000.00 | 700,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,300.00 | 9,300.00 | 5,000.00 | 5,000.00 | 39,000.00 | 39,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 83 | SQYD | 6.00 | 498.00 | 25.00 | 2,075.00 | 25.00 | 2,075.00 | 75.00 | 6,225.00 | | 0004 | 202-02-04501 | Removal of Bridge (Recall No. 016480, 77' X 27' Lightweight Concrete Precast Slab Units) | 2,079 | LUMP | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0005 | 202-02-04501 | Removal of Bridge (Recall No. 016490, 57' x 27' Lightweight Concrete Precast Slab Units) | 1,539 | LUMP | 55,000.00 | 55,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (Recall No. 016500, 97' x 25.2' Treated Timber Trestles with Concrete Deck) | 2,444 | LUMP | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | 140,000.00 | 140,000.00 | 100,000.00 | 100,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Recall No. 016510, 135' x 25.2' Treated Timber Trestles with Concrete Deck) | 3,402 | LUMP | 75,000.00 | 75,000.00 | 60,000.00 | 60,000.00 | 140,000.00 | 140,000.00 | 175,000.00 | 175,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 377 | LNFT | 2.00 | 754.00 | 5.00 | 1,885.00 | 8.50 | 3,204.50 | 10.00 | 3,770.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 2,125 | LNFT | 9.00 | 19,125.00 | 11.00 | 23,375.00 | 8.50 | 18,062.50 | 9.00 | 19,125.00 | | 0010 | 202-02-38240 | Removal of Signs and Supports | 8 | EACH | 120.00 | 960.00 | 35.00 | 280.00 | 50.00 | 400.00 | 50.00 | 400.00 | | 0011 | 202-03-38000 | Relocation of Sign | 7 | EACH | 1,000.00 | 7,000.00 | 35.00 | 245.00 | 100.00 | 700.00 | 100.00 | 700.00 | | 0012 | 203-02-00100 | Drainage Excavation | 2,602 | CUYD | 22.00 | 57,244.00 | 20.00 | 52,040.00 | 18.00 | 46,836.00 | 40.00 | 104,080.00 | | 0013 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 144,650.00 | 144,650.00 | 100,000.00 | 100,000.00 | 375,000.00 | 375,000.00 | 500,000.00 | 500,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 21 | EACH | 133.00 | 2,793.00 | 200.00 | 4,200.00 | 200.00 | 4,200.00 | 140.00 | 2,940.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 6,110 | LNFT | 3.00 | 18,330.00 | 6.00 | 36,660.00 | 2.30 | 14,053.00 | 3.00 | 18,330.00 | | 0016 | 302-02-10075 | Class II Base Course (10" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 3,298.5 | SQYD | 56.00 | 184,716.00 | 48.00 | 158,328.00 | 45.00 | 148,432.50 | 75.00 | 247,387.50 | | 0017 | 302-03-00100 | Base Drain Outlet | 25 | EACH | 1,500.00 | 37,500.00 | 1,000.00 | 25,000.00 | 900.00 | 22,500.00 | 1,500.00 | 37,500.00 | | 0018 | 304-01-00100 | Lime | 46.75 | TON | 460.00 | 21,505.00 | 300.00 | 14,025.00 | 350.00 | 16,362.50 | 425.00 | 19,868.75 | | 0019 | 304-05-00100 | Lime Treatment (Type E) | 3,299 | SQYD | 8.00 | 26,392.00 | 6.00 | 19,794.00 | 7.00 | 23,093.00 | 9.00 | 29,691.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 2,768.9 | TON | 280.00 | 775,292.00 | 280.00 | 775,292.00 | 280.00 | 775,292.00 | 290.00 | 802,981.00 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 264.7 | TON | 400.00 | 105,880.00 | 400.00 | 105,880.00 | 400.00 | 105,880.00 | 290.00 | 76,763.00 | | 0022 | 509-01-00100 | Milling Asphalt Pavement | 5,949 | SQYD | 15.00 | 89,235.00 | 6.00 | 35,694.00 | 15.00 | 89,235.00 | 10.00 | 59,490.00 | | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -248 | CUYD | 1.00 | -248.00 | 0.01 | -2.48 | 0.01 | -2.48 | 1.00 | -248.00 | | 0024 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 328 | SQYD | 320.00 | 104,960.00 | 300.00 | 98,400.00 | 280.00 | 91,840.00 | 300.00 | 98,400.00 | | 0025 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 116,822 | INLF | 1.00 | 116,822.00 | 0.55 | 64,252.10 | 0.60 | 70,093.20 | 0.50 | 58,411.00 | | 0026 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 768 | LNFT | 9.00 | 6,912.00 | 10.00 | 7,680.00 | 10.05 | 7,718.40 | 20.00 | 15,360.00 | | 0027 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,280 | LNFT | 2.00 | 2,560.00 | 2.00 | 2,560.00 | 2.00 | 2,560.00 | 10.00 | 12,800.00 | | 0028 | 701-05-01084 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW) | 50 | LNFT | 150.00 | 7,500.00 | 140.00 | 7,000.00 | 180.00 | 9,000.00 | 300.00 | 15,000.00 | | 0029 | 701-05-02064 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW) | 68 | LNFT | 120.00 | 8,160.00 | 115.00 | 7,820.00 | 145.00 | 9,860.00 | 275.00 | 18,700.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 550 | LNFT | 33.50 | 18,425.00 | 33.00 | 18,150.00 | 34.00 | 18,700.00 | 34.00 | 18,700.00 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 116.50 | 46,600.00 | 116.00 | 46,400.00 | 117.00 | 46,800.00 | 118.00 | 47,200.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 14 | EACH | 3,350.00 | 46,900.00 | 3,350.00 | 46,900.00 | 3,400.00 | 47,600.00 | 3,400.00 | 47,600.00 | | 0033 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,050.00 | 6,100.00 | 3,050.00 | 6,100.00 | 3,100.00 | 6,200.00 | 3,200.00 | 6,400.00 | | 0034 | 705-01-00100 | Barbed Wire Fence | 367 | LNFT | 15.00 | 5,505.00 | 12.75 | 4,679.25 | 15.00 | 5,505.00 | 15.00 | 5,505.00 | | 0035 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 6,390 | SQYD | 105.00 | 670,950.00 | 60.00 | 383,400.00 | 70.00 | 447,300.00 | 125.00 | 798,750.00 | | 0036 | 711-04-00100 | Geotextile Fabric | 6,390 | SQYD | 4.00 | 25,560.00 | 4.00 | 25,560.00 | 4.00 | 25,560.00 | 5.00 | 31,950.00 | | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 107,000.00 | 107,000.00 | 140,000.00 | 140,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | 250,000.00 | | 0038 | 716-01-00100 | Mulch (Vegetative) | 8.9 | TON | 900.00 | 8,010.00 | 2,000.00 | 17,800.00 | 900.00 | 8,010.00 | 1,000.00 | 8,900.00 | | 0039 | 717-01-00100 | Seeding | 132.6 | LB | 13.00 | 1,723.80 | 10.00 | 1,326.00 | 13.00 | 1,723.80 | 14.00 | 1,856.40 | | 0040 | 718-01-00100 | Fertilizer | 4,419.7 | LB | 1.00 | 4,419.70 | 1.50 | 6,629.55 | 0.70 | 3,093.79 | 0.75 | 3,314.78 | | 0041 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 7,994.1 | SQYD | 2.00 | 15,988.20 | 2.00 | 15,988.20 | 1.40 | 11,191.74 | 1.50 | 11,991.15 | | 0042 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 542.8 | SQYD | 2.00 | 1,085.60 | 2.75 | 1,492.70 | 1.60 | 868.48 | 1.70 | 922.76 | | 0043 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.231 | MILE | 1,000.00 | 1,231.00 | 300.00 | 369.30 | 500.00 | 615.50 | 1,100.00 | 1,354.10 | | 0044 | 727-01-00100 | Mobilization | 1 | LUMP | 843,100.00 | 843,100.00 | 900,000.00 | 900,000.00 | 950,000.00 | 950,000.00 | 1,100,000.00 | 1,100,000.00 | | 0045 | 729-01-00100 | Sign (Type A) | 35.1 | SQFT | 20.00 | 702.00 | 45.00 | 1,579.50 | 40.00 | 1,404.00 | 37.00 | 1,298.70 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 100.00 | 1,600.00 | 100.00 | 1,600.00 | 100.00 | 1,600.00 | 105.00 | 1,680.00 | | 0047 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 | 300.00 | 1,200.00 | 360.00 | 1,440.00 | | 0048 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,371 | EACH | 10.00 | 13,710.00 | 10.00 | 13,710.00 | 10.00 | 13,710.00 | 11.00 | 15,081.00 | | 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 136 | EACH | 6.50 | 884.00 | 6.50 | 884.00 | 7.00 | 952.00 | 7.00 | 952.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.357 | MILE | 6,000.00 | 14,142.00 | 6,100.00 | 14,377.70 | 6,000.00 | 14,142.00 | 6,200.00 | 14,613.40 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.304 | MILE | 3,000.00 | 912.00 | 3,000.00 | 912.00 | 3,000.00 | 912.00 | 3,100.00 | 942.40 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | 175,000.00 | 175,000.00 | | 0053 | 804-01-00400 | Precast Concrete Piles (18") | 6,884 | LNFT | 177.00 | 1,218,468.00 | 260.00 | 1,789,840.00 | 165.00 | 1,135,860.00 | 224.00 | 1,542,016.00 | | 0054 | 805-01-00100 | Class A1 Concrete (Slab Span) | 767.74 | CUYD | 350.00 | 268,709.00 | 1,300.00 | 998,062.00 | 1,250.00 | 959,675.00 | 1,600.00 | 1,228,384.00 | | 0055 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 245.26 | CUYD | 350.00 | 85,841.00 | 2,300.00 | 564,098.00 | 2,300.00 | 564,098.00 | 3,000.00 | 735,780.00 | | 0056 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 6,605 | SQFT | 1.00 | 6,605.00 | 1.50 | 9,907.50 | 2.00 | 13,210.00 | 3.00 | 19,815.00 | | 0057 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 6,605 | SQFT | 1.00 | 6,605.00 | 2.50 | 16,512.50 | 2.50 | 16,512.50 | 3.00 | 19,815.00 | | 0058 | 806-01-00100 | Deformed Reinforcing Steel | 187,671 | LB | 4.00 | 750,684.00 | 1.50 | 281,506.50 | 1.50 | 281,506.50 | 1.40 | 262,739.40 | | 0059 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 960 | LNFT | 290.00 | 278,400.00 | 160.00 | 153,600.00 | 275.00 | 264,000.00 | 300.00 | 288,000.00 | | 0060 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 10,240 | SQFT | 160.00 | 1,638,400.00 | 80.00 | 819,200.00 | 125.00 | 1,280,000.00 | 150.00 | 1,536,000.00 | | 0061 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 728 | SFIN | 80.00 | 58,240.00 | 80.00 | 58,240.00 | 100.00 | 72,800.00 | 85.00 | 61,880.00 | | 0062 | 815-03-00300 | Joint Seal (Poured) | 931 | LNFT | 12.00 | 11,172.00 | 20.00 | 18,620.00 | 15.00 | 13,965.00 | 20.00 | 18,620.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,431,112.30 | | 9,055,527.32 | | 9,589,110.43 | | 11,636,175.34 |
|