Proposal:H.016367.6
Parish:Bossier
Routes:US 71
Description:US 71: LA 612 TO LA 3032
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$7,147,294.35
| Rank | License | Bidder | Construction Bid |
| 1 | 17464 | Benton & Brown, LLC. | $7,921,133.72 |
| 2 | 67822 | Earnest Contracting LLC | $8,749,010.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Benton & Brown, LLC. | - 2 - Earnest Contracting LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 86 | SQYD | 22.00 | 1,892.00 | 25.00 | 2,150.00 | | 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | 9 | SQYD | 55.00 | 495.00 | 100.00 | 900.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 432 | LNFT | 11.00 | 4,752.00 | 20.00 | 8,640.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 559 | LNFT | 13.20 | 7,378.80 | 12.00 | 6,708.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 1 | EACH | 550.00 | 550.00 | 500.00 | 500.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 55.00 | 5,500.00 | 100.00 | 10,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 6.60 | 3,960.00 | 2.50 | 1,500.00 | | 0009 | 302-02-06020 | Class II Base Course (6" Thick) (Crushed Stone) | 13 | SQYD | 55.00 | 715.00 | 200.00 | 2,600.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 8.3 | CUYD | 165.00 | 1,369.50 | 200.00 | 1,660.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 13,037.8 | TON | 180.00 | 2,346,804.00 | 175.00 | 2,281,615.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 830.9 | TON | 300.00 | 249,270.00 | 250.00 | 207,725.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 133,204 | SQYD | 6.00 | 799,224.00 | 11.00 | 1,465,244.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,088 | CUYD | 0.01 | -50.88 | 0.10 | -508.80 | | 0015 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 4,611 | SQYD | 80.00 | 368,880.00 | 100.00 | 461,100.00 | | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,082 | SQYD | 255.00 | 275,910.00 | 173.00 | 187,186.00 | | 0017 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 4,580 | INLF | 2.20 | 10,076.00 | 1.00 | 4,580.00 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 41,610 | LNFT | 5.00 | 208,050.00 | 5.00 | 208,050.00 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 40,815 | LNFT | 5.00 | 204,075.00 | 5.00 | 204,075.00 | | 0020 | 602-03-00100 | Cleaning and Sealing Random Cracks | 1,651 | LNFT | 8.80 | 14,528.80 | 6.50 | 10,731.50 | | 0021 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,050 | SQYD | 286.00 | 300,300.00 | 301.50 | 316,575.00 | | 0022 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,574 | SQYD | 242.00 | 380,908.00 | 301.50 | 474,561.00 | | 0023 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,648 | SQYD | 220.00 | 362,560.00 | 301.50 | 496,872.00 | | 0024 | 602-10-00100 | Longitudinal Shoulder Joints | 41,310 | LNFT | 4.40 | 181,764.00 | 5.00 | 206,550.00 | | 0025 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 80 | LNFT | 220.00 | 17,600.00 | 250.00 | 20,000.00 | | 0026 | 701-08-00100 | Relaying Pipe 24" RCP | 8 | LNFT | 165.00 | 1,320.00 | 500.00 | 4,000.00 | | 0027 | 701-15-00100 | Concrete Collar | 10 | EACH | 2,200.00 | 22,000.00 | 1,000.00 | 10,000.00 | | 0028 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 11,000.00 | 11,000.00 | 7,500.00 | 7,500.00 | | 0029 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 5,500.00 | 5,500.00 | 2,500.00 | 2,500.00 | | 0030 | 702-09-00100 | Cleaning Existing Catch Basin CATCH BASIN | 10 | EACH | 880.00 | 8,800.00 | 1,500.00 | 15,000.00 | | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 516.8 | LNFT | 44.00 | 22,739.20 | 40.00 | 20,672.00 | | 0032 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 10 | LNFT | 187.00 | 1,870.00 | 170.00 | 1,700.00 | | 0033 | 706-01-00100 | Concrete Walk (4" Thick) | 73 | SQYD | 137.50 | 10,037.50 | 150.00 | 10,950.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 13 | SQYD | 165.00 | 2,145.00 | 300.00 | 3,900.00 | | 0035 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 2.4 | SQYD | 550.00 | 1,320.00 | 1,000.00 | 2,400.00 | | 0036 | 706-04-00110 | Curb Ramps TYPE 1 | 128 | SQYD | 330.00 | 42,240.00 | 200.00 | 25,600.00 | | 0037 | 706-04-00110 | Curb Ramps Type 3 | 16.2 | SQYD | 330.00 | 5,346.00 | 300.00 | 4,860.00 | | 0038 | 707-01-00100 | Concrete Curb | 432 | LNFT | 22.00 | 9,504.00 | 20.00 | 8,640.00 | | 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 625,000.00 | 625,000.00 | 400,000.00 | 400,000.00 | | 0040 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 9,721 | LNFT | 0.28 | 2,721.88 | 0.25 | 2,430.25 | | 0041 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,354 | LNFT | 0.28 | 659.12 | 0.25 | 588.50 | | 0042 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.19 | MILE | 1,000.00 | 12,190.00 | 1,000.00 | 12,190.00 | | 0043 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.49 | MILE | 1,100.00 | 10,439.00 | 1,000.00 | 9,490.00 | | 0044 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.8 | MILE | 2,200.00 | 41,360.00 | 2,000.00 | 37,600.00 | | 0045 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 43 | EACH | 22.00 | 946.00 | 20.00 | 860.00 | | 0046 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 22 | EACH | 22.00 | 484.00 | 20.00 | 440.00 | | 0047 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 2 | EACH | 22.00 | 44.00 | 20.00 | 40.00 | | 0048 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 110.00 | 220.00 | 100.00 | 200.00 | | 0049 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 8,250.00 | 3,300.00 | 7,500.00 | 3,000.00 | | 0050 | 717-01-00100 | Seeding | 12 | LB | 33.00 | 396.00 | 200.00 | 2,400.00 | | 0051 | 718-01-00100 | Fertilizer | 200 | LB | 2.75 | 550.00 | 10.00 | 2,000.00 | | 0052 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 11.67 | MILE | 2,200.00 | 25,674.00 | 2,000.00 | 23,340.00 | | 0053 | 726-01-00100 | Bedding Material | 9.6 | CUYD | 275.00 | 2,640.00 | 250.00 | 2,400.00 | | 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 430,000.00 | 430,000.00 | 650,000.00 | 650,000.00 | | 0055 | 729-01-00100 | Sign (Type A) | 18 | SQFT | 55.00 | 990.00 | 50.00 | 900.00 | | 0056 | 729-01-00200 | Mounting of Sign (Type A) | 4 | EACH | 165.00 | 660.00 | 50.00 | 200.00 | | 0057 | 729-08-00200 | Sign Support (3 1/2" Size Post) | 1 | EACH | 1,650.00 | 1,650.00 | 3,500.00 | 3,500.00 | | 0058 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 137.50 | 275.00 | 125.00 | 250.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,168 | EACH | 9.90 | 41,263.20 | 9.00 | 37,512.00 | | 0060 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 9,721 | LNFT | 5.50 | 53,465.50 | 5.00 | 48,605.00 | | 0061 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,354 | LNFT | 27.50 | 64,735.00 | 25.00 | 58,850.00 | | 0062 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.8 | MILE | 6,600.00 | 124,080.00 | 6,000.00 | 112,800.00 | | 0063 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 9.49 | MILE | 3,300.00 | 31,317.00 | 3,000.00 | 28,470.00 | | 0064 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.1 | MILE | 11,000.00 | 1,100.00 | 10,000.00 | 1,000.00 | | 0065 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 1.04 | MILE | 11,000.00 | 11,440.00 | 10,000.00 | 10,400.00 | | 0066 | 732-03-04021 | Plastic Pav't Striping (Broken) (9" Width) (Pref Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.14 | MILE | 22,000.00 | 3,080.00 | 20,000.00 | 2,800.00 | | 0067 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 43 | EACH | 550.00 | 23,650.00 | 500.00 | 21,500.00 | | 0068 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 22 | EACH | 550.00 | 12,100.00 | 500.00 | 11,000.00 | | 0069 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 825.00 | 1,650.00 | 750.00 | 1,500.00 | | 0070 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 2,750.00 | 5,500.00 | 2,500.00 | 5,000.00 | | 0071 | 732-05-00100 | Removal of Existing Markings | 4.129 | MILE | 11,000.00 | 45,419.00 | 10,000.00 | 41,290.00 | | 0072 | 736-01-00100 | Trenching and Backfilling | 55 | LNFT | 104.50 | 5,747.50 | 95.00 | 5,225.00 | | 0073 | 736-09-00100 | Loop Detector | 1,632 | LNFT | 118.00 | 192,576.00 | 83.85 | 136,843.20 | | 0074 | 736-10-00200 | Underground Junction Box (Type E) | 11 | EACH | 2,300.00 | 25,300.00 | 2,300.00 | 25,300.00 | | 0075 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 55 | LNFT | 55.00 | 3,025.00 | 65.00 | 3,575.00 | | 0076 | 737-05-00002 | Painted Curbs | 7,347 | LNFT | 8.80 | 64,653.60 | 8.00 | 58,776.00 | | 0077 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | | 0079 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 55,000.00 | 55,000.00 | 65,000.00 | 65,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,921,133.72 | | 8,749,010.65 |
|